WAC Notes September 6 2019
From PREX Wiki
Jump to navigationJump to searchDocumentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions
WAC Notes September 5 2019 << >> WAC Notes September 7 2019
September 6 2019
Daily Meeting BlueJeans
Production Run List - Slug 85
(Wien-left, IHWP-out)
- Good - 4836
- Good - 4837
- Good - 4838
- Good - 4839
- Good - 4840
- Good - 4841
- Good - 4843
- Good - 4844
- Good - 4845
- Good - 4846
- Good - 4847
Production Run List - Slug 86
(Wien-left, IHWP-in)
- Good - 4848
- Good - 4849
- Good - 4850
- Good - 4851
- shift in bpm11, cut it: prex_bad_events.4951.map
- Good - 4853
- Good - 4854
- Good - 4855
- Good - 4860
- Good - 4861
- Good - 4862
- Good - 4863
- Good - 4864
Production Run List - Slug 87
(Wien-left, IHWP-out) A short slug
Production Run List - Slug 88
(Wien-left, IHWP-out [still out, change beam tune], new target: D1-208Pb6-D2)
- Good - 4871
- Good - 4872
- calibration run, cut out low current part (< 65 uA): prex_bad_events.4872.map
- Good - 4873
- Good - 4874
- Good - 4875
- Good - 4876
- Good - 4877
- Good - 4878
Production Run List - Slug 89
(Wien-left, IHWP-in)
- Good - 4879
- Good - 4880
- other runs - slug89 on Sep 7
Non-Production Runs and Bad Runs
- Junk - 4842
- Test - 4856
- Test - 4857
- Test - 4858
- Test - 4859
- Beam Mod Test - 4869 post harp scan
- Beam Mod Test - 4870
Pedestal/Calibrations Updates
- update injector pedestal map file: prexinj_beamline_pedestal.4858-.map
Issues
Other Status Updates
- increase production current to 85 uA at about 19:00