Difference between revisions of "WAC Notes February 1 2020"

From PREX Wiki
Jump to navigationJump to search
Line 66: Line 66:
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==
 
* Test - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6114_000 Run 6114] is a test run with only 10 uA, but we can use its data, just need to modify the beamline_eventcut map file
 
* Test - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6117_000 Run 6117] is a test run with only 10 uA, but we can use its data, just need to modify the beamline_eventcut map file
 
  
 
== Pedestal/Calibrations Updates ==
 
== Pedestal/Calibrations Updates ==

Revision as of 23:03, 2 February 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 31 2020 << >> WAC Notes February 2 2020

February 1 2020

Daily Meeting BlueJeans


Production Run List - Slug 122 - IHWP IN - Flip-RIGHT - Production

continue slug 122 from January 31:


Production Run List - Slug 123 - IHWP IN - Flip-RIGHT - Production

separate single arm runs into new slug


Production Run List - Slug 124 - IHWP OUT - Flip-RIGHT - Production

this slug starts at about 3:50 am


Production Run List - Slug 125 - IHWP OUT - Flip-RIGHT - Production


Production Run List - Slug 126 - IHWP IN - Flip-RIGHT - Production

start slug 126 at about 20:50

more runs on February 2

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • Since run 6099, the bcm asym is quite large (>~ 300 ppm) due to large asym in injector
  • LQ2 quenched at about 3:25 am, making run 6105 through 6110 right arm only

Updates