Difference between revisions of "WAC Notes March 7 2020"

From PREX Wiki
Jump to navigationJump to search
m
Line 39: Line 39:
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6983_000 Run 6983]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6983_000 Run 6983]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6987_000 Run 6987]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6987_000 Run 6987]
 +
** 120 uA
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6988_000 Run 6988]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6988_000 Run 6988]
 +
** 120 uA
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6989_000 Run 6989]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6989_000 Run 6989]
 +
** 120 uA
  
 
=== Production Run List - Slug 158 - IHWP IN - Flip-LEFT - Production ===
 
=== Production Run List - Slug 158 - IHWP IN - Flip-LEFT - Production ===

Revision as of 14:43, 9 March 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes March 6 2020 << >> WAC Notes March 8 2020

March 7 2020

Daily Meeting BlueJeans


Production Run List - Slug 157 - IHWP OUT - Flip-LEFT - Production

Slug started at approx 03:00 on March 7

Production Run List - Slug 158 - IHWP IN - Flip-LEFT - Production

Slug started at approx 21:30 on March 7

Non-Production Runs and Bad Runs

  • Run 6979
    • Junked for having no beam
  • Runs 6984-6986
    • Junked for injector work, beam recovery
  • Run 6993
    • Down for a period of time, re-established on C-1%.

Issues

  • Noticed temperature in LHRS hut was rising, called in techs to fix during day shift.
  • FFB became unstable as slug 157 wore on.

Updates