Difference between revisions of "20200508-Analyzer-Mtg"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> Analyzer_Meeting previous meeting << >> following meeting == Logistic informatio...")
 
Line 37: Line 37:
 
#**#  Automated merging of the last burst into the previous burst(?)
 
#**#  Automated merging of the last burst into the previous burst(?)
 
#*  What else do we need?
 
#*  What else do we need?
#  CREX respin1:  Start shortly after PREX-2 respin2 completes.  Estimate about 4 weeks
+
[https://github.com/JeffersonLab/japan/pull/282 CREX respin1]:  Start shortly after PREX-2 respin2 completes.  Estimate about 4 weeks
 
#*  Dithering correction map updates
 
#*  Dithering correction map updates
 
#*  Pedestal changes
 
#*  Pedestal changes

Revision as of 13:26, 8 May 2020

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

Meeting room at JLab: No meeting room at JLab

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  385 600 867
 Bluejeans link: https://bluejeans.com/385600867

Agenda

Old issues

  1. Issue 275: Change of EPICS variables for the IHWP state
  2. Issue 269: diff* variables are missing in burst and muls trees
    • Both have been merged to develop.
  3. Issue 245: Burp / stability cuts adversely affect Beam Mod
    • Quinn's changes are simply to expland the cut limits for the burp cut. An expansion of a factor of 2-3 from what was initially set seems to allow all BMOD data to pass. The impact on data quality is to be investigated.
    • Victoria is working on a summary of the impact this has on data quality: short answer is that it looks pretty good.

Preparations for new respins

  1. PREX-2 respin2: We want to start this very soon
    • Paul: Create a comboBCM to be (2*bcm_an_us + bcm_an_ds)/3 except for runs 3594-3573, for which we would use bcm_dg_ds; use this as the normalizing BCM
    • Cameron: Add certain BPM combinations such as the average of 11 and 12 as combined objects, and use them in regression/dithering. Use run-ranging on this combined object to allow us to have a consistent name for the BPMs we use in regression/dithering even as we change the "best choice".
      • This also needs us to collect the "best choice" into run-ranged lists.
    • Robert: Pedestal re-evaluation
    • Paul: Merge operations & prex-respin1 back to develop and create a prex-respin2 branch
    • Devi recommended adding the AT detectors to the global error; we should make a list of all the changes we are planning, and present them at the analysis meeting next week
      • Here's the list:
        1. Burp cut changes
        2. Change in the normalizing BCM
        3. Pedestal updates, similar to what Cameron presented at April 24 PREX analysis meeting
        4. Use of combined BPM 11 & 12 in both regression and dithering
        5. AT detectors added to global error flag
        6. Automated merging of the last burst into the previous burst(?)
    • What else do we need?
  2. CREX respin1: Start shortly after PREX-2 respin2 completes. Estimate about 4 weeks
    • Dithering correction map updates
    • Pedestal changes
    • Run list updates
    • What else
      • Should we keep the same larger burp cut as in the PREX2 analysis?

Other issues

  • Maybe we can add a way to get a run-summary tree for events matching a certain ErrorFlag? This would be one way to get the asymmetries for the events during beam modulation
    • Can this be done just in QwParity, or would it need deeper changes in the supporting classes?
    • The other way to get the beam modulation asymmetries would be to do it as a postprocessing step from the normal trees.


Present

Phone:


Excused