Difference between revisions of "20200727-Optics-Mtg"
From PREX Wiki
Jump to navigationJump to searchKent Paschke (talk | contribs) (Created page with "Back to Main Page >> HRS_Optics_Mtg previous meeting << >> following meeting == Logistic information ==...") |
Kent Paschke (talk | contribs) (→Agenda) |
||
Line 16: | Line 16: | ||
#* instability in Q2 measurements over the PREX-2 run | #* instability in Q2 measurements over the PREX-2 run | ||
#* catalog of relevant parameters for Q2 runs (beam E, beam position, spectrometer dp, trigger hole?... others?) | #* catalog of relevant parameters for Q2 runs (beam E, beam position, spectrometer dp, trigger hole?... others?) | ||
− | #* Lead uniformity measurement vs. target lifetime (expected failure at end only) | + | #* Lead uniformity measurement vs. target lifetime (expected failure at end only) |
+ | #** Some bound from Devi's plot of widths/yields over the run [http://ace.phys.virginia.edu/HAPPEX/4185 haplog:4185] | ||
# Longstanding topics | # Longstanding topics | ||
#* progress on MC simulation of acceptance function | #* progress on MC simulation of acceptance function | ||
Line 22: | Line 23: | ||
#* ultimate precision of angle measurement | #* ultimate precision of angle measurement | ||
#* evaluation of optics db reconstruction uncertainty to q2 / acceptance function systematic error | #* evaluation of optics db reconstruction uncertainty to q2 / acceptance function systematic error | ||
− | #* inelastic contamination | + | #* inelastic contamination |
== Minutes == | == Minutes == | ||
== Attendence == | == Attendence == |
Revision as of 10:53, 27 July 2020
Back to Main Page >> HRS_Optics_Mtg
previous meeting << >> following meeting
Logistic information
Toll-Free Number (U.S.& Canada): 888-240-2560 PARTICIPANT CODE: # 585 129 220 Room IRL: <none> https://bluejeans.com/585129220
Agenda
Please post slides in haplog or docdb, before the meeting
- Last weeks issues:
- Non-symmetric azimuthal angle acceptance distributions
- instability in Q2 measurements over the PREX-2 run
- catalog of relevant parameters for Q2 runs (beam E, beam position, spectrometer dp, trigger hole?... others?)
- Lead uniformity measurement vs. target lifetime (expected failure at end only)
- Some bound from Devi's plot of widths/yields over the run haplog:4185
- Longstanding topics
- progress on MC simulation of acceptance function
- Carbon fraction
- ultimate precision of angle measurement
- evaluation of optics db reconstruction uncertainty to q2 / acceptance function systematic error
- inelastic contamination