Difference between revisions of "20200727-Optics-Mtg"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> HRS_Optics_Mtg previous meeting << >> following meeting == Logistic information ==...")
 
Line 16: Line 16:
 
#* instability in Q2 measurements over the PREX-2 run  
 
#* instability in Q2 measurements over the PREX-2 run  
 
#* catalog of relevant parameters for Q2 runs (beam E, beam position, spectrometer dp, trigger hole?... others?)
 
#* catalog of relevant parameters for Q2 runs (beam E, beam position, spectrometer dp, trigger hole?... others?)
#* Lead uniformity measurement vs. target lifetime (expected failure at end only)
+
#* Lead uniformity measurement vs. target lifetime (expected failure at end only)
 +
#** Some bound from Devi's plot of widths/yields over the run  [http://ace.phys.virginia.edu/HAPPEX/4185 haplog:4185]
 
# Longstanding topics
 
# Longstanding topics
 
#* progress on MC simulation of acceptance function
 
#* progress on MC simulation of acceptance function
Line 22: Line 23:
 
#* ultimate precision of angle measurement
 
#* ultimate precision of angle measurement
 
#* evaluation of optics db reconstruction uncertainty to q2 / acceptance function systematic error
 
#* evaluation of optics db reconstruction uncertainty to q2 / acceptance function systematic error
#* inelastic contamination  
+
#* inelastic contamination
  
 
== Minutes ==
 
== Minutes ==
  
 
== Attendence ==
 
== Attendence ==

Revision as of 10:53, 27 July 2020

Back to Main Page >> HRS_Optics_Mtg


previous meeting << >> following meeting

Logistic information

 Toll-Free Number (U.S.&  Canada):  888-240-2560
 PARTICIPANT CODE:                  # 585 129 220
 Room IRL:                            <none>
 https://bluejeans.com/585129220

Agenda

Please post slides in haplog or docdb, before the meeting

  1. Last weeks issues:
    • Non-symmetric azimuthal angle acceptance distributions
    • instability in Q2 measurements over the PREX-2 run
    • catalog of relevant parameters for Q2 runs (beam E, beam position, spectrometer dp, trigger hole?... others?)
    • Lead uniformity measurement vs. target lifetime (expected failure at end only)
      • Some bound from Devi's plot of widths/yields over the run haplog:4185
  2. Longstanding topics
    • progress on MC simulation of acceptance function
    • Carbon fraction
    • ultimate precision of angle measurement
    • evaluation of optics db reconstruction uncertainty to q2 / acceptance function systematic error
    • inelastic contamination

Minutes

Attendence