Line 29: Line 29:
 
** Noticed the SBS and HES septum magnet power supplies both weren't cycled correctly around noon and cycled them now.
 
** Noticed the SBS and HES septum magnet power supplies both weren't cycled correctly around noon and cycled them now.
  
===='''RHRS Dipole tripped'''====
+
=== Production Run List - Slug 191 - IHWP OUT - Flip-RIGHT ===
 +
===='''RHRS Dipole tripped, its own slug'''====
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run7760_000 Run 7760] - Looks good
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run7760_000 Run 7760] - Looks good
 
** Cut out :70k events for large beam motion at the beginning of the run.  
 
** Cut out :70k events for large beam motion at the beginning of the run.  
 
** R dipole tripped -> Set RHRS main detectors to local cuts and no-blinding and no-normalization
 
** R dipole tripped -> Set RHRS main detectors to local cuts and no-blinding and no-normalization
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run7762_000 Run 7762] -  
+
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run7762_000 Run 7762] - Looks good. 12X BPM jumps, need to cut out >1mm, < -1mm. LHRS only run, R Dipole tripped
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run7763_000 Run 7763] -
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run7763_000 Run 7763] -
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run7764_000 Run 7764] -
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run7765_000 Run 7765] -
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run7766_000 Run 7766] -
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==

Revision as of 06:06, 16 August 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts


PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes August 14 2020 << >> WAC Notes August 16 2020

August 15 2020

Daily Meeting BlueJeans

Production Run List - Slug 190 - IHWP OUT - Flip-RIGHT

Continued from yeterday's run here

Back to the OLD Moller quads tune - Septum hadn't been cycled after hall work

  • Good - Run 7759 - Looks good.
    • 100 uA for most of the run.
    • First run back with the originally used Moller quad tune set up.
    • Noticed the SBS and HES septum magnet power supplies both weren't cycled correctly around noon and cycled them now.

Production Run List - Slug 191 - IHWP OUT - Flip-RIGHT

RHRS Dipole tripped, its own slug

  • Good - Run 7760 - Looks good
    • Cut out :70k events for large beam motion at the beginning of the run.
    • R dipole tripped -> Set RHRS main detectors to local cuts and no-blinding and no-normalization
  • Good - Run 7762 - Looks good. 12X BPM jumps, need to cut out >1mm, < -1mm. LHRS only run, R Dipole tripped
  • Good - Run 7763 -
  • Good - Run 7764 -
  • Good - Run 7765 -
  • Good - Run 7766 -

Non-Production Runs and Bad Runs

Issues

  • Running with FFB off
  • Moller quads failed and we got a different tune over night. The data seems OK anyway
  • Run 7761 for Compton tuning on C-1%, needed vertical table move

Updates

  • BMOD tune seems OK.
  • I found another bug in code - was always using 4aX BPM even in 1X case for corrections... now fixed
  • It appears 1X 15746 BMOD analysis is the best for the last few days of running. Needs re-analysis to pick up pedestal fix and get the full run lists all analyzed again.