Difference between revisions of "PREX2AcceptanceTodoList"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page Counting and Optics portal #Collimator Definition ## Verify collimator image in G4HRS reconstruction ## Check collimator im...")
 
Line 1: Line 1:
 
Back to [[Main_Page|Main Page]]  
 
Back to [[Main_Page|Main Page]]  
  
[[HRS_Analysis|Counting and Optics portal]]
+
[[HRS_Analysis|Counting and Optics portal]] [[HRS_Optics_Mtg | Optics Meetings]]
  
 
#Collimator Definition
 
#Collimator Definition
Line 17: Line 17:
 
## from each Th_data, Th_MC, and Th_V, calculate <Th>, <Q2>, <A>, d<A>/dR
 
## from each Th_data, Th_MC, and Th_V, calculate <Th>, <Q2>, <A>, d<A>/dR
 
# G4HRS compare to focal plane data
 
# G4HRS compare to focal plane data
# G4HRS check aperatures
+
# G4HRS check apertures

Revision as of 18:09, 18 September 2020

Back to Main Page

Counting and Optics portal Optics Meetings

  1. Collimator Definition
    1. Verify collimator image in G4HRS reconstruction
    2. Check collimator image in data reconstruction
    3. Verify collimator image in HAMC
  2. Optics Data
    1. Demonstrate residuals in PREX reconstruction data base
    2. Pointing - precision
    3. Verify pointing over sieve holes
  3. Acceptance function
    1. Calculate, histogram polar scattering angle from data (Th_data)
    2. Calculate, histogram polar scattering angle from G4HRS (Th_MC) (post target, assuming beam axis and beam energy)
    3. Calculate, histogram polar scattering angle from G4HRS (Th_V)
    4. from each Th_data, Th_MC, and Th_V, calculate , <Q2>, <A>, d<A>/dR
  4. G4HRS compare to focal plane data
  5. G4HRS check apertures