Each WAC will suggest changes for their run period, which will be discussed at this meeting:  
 
Each WAC will suggest changes for their run period, which will be discussed at this meeting:  
 
=== Cameron ===
 
=== Cameron ===
 +
==== Slug 186 ====
 +
Pedestals:
 +
* The pedestals were obtained AFTER the run began, so the first set of pedestals (or global pedestals) need to be updated and back-propagated to this run period as well.
 +
 +
Runs:
 
* Slug 186 - 7626 - '''was not included before''' - is the very first run, it has 5 sigma Aq (no Aq feedback) and FFB commissioning/noise, but otherwise is fine
 
* Slug 186 - 7626 - '''was not included before''' - is the very first run, it has 5 sigma Aq (no Aq feedback) and FFB commissioning/noise, but otherwise is fine
 
* Slug 186 - 7627 - was included before - Has 2 sigma Aq (bad Aq feedback). Also, FFB turning on an off is a mess, but as far as I can tell, there is no negative impact on slopes or corrections (so it should be tolerated)
 
* Slug 186 - 7627 - was included before - Has 2 sigma Aq (bad Aq feedback). Also, FFB turning on an off is a mess, but as far as I can tell, there is no negative impact on slopes or corrections (so it should be tolerated)

Revision as of 15:06, 9 November 2020

RCDB HALOG HAPLOG DocDB Online Prompt BlueJeans Link Runlist spreadsheet

PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << WAC Post-Run_Meeting Notes

WAC Notes November 5 2020 << >> WAC Notes November 19 2020

Organization

Date and time: November 12, 2020, 11:00am
Bluejeans ID: 454783784
Meeting link: https://bluejeans.com/454783784
Runlist spreadsheet

Suggested Changes

Each WAC will suggest changes for their run period, which will be discussed at this meeting:

Cameron

Slug 186

Pedestals:

  • The pedestals were obtained AFTER the run began, so the first set of pedestals (or global pedestals) need to be updated and back-propagated to this run period as well.

Runs:

  • Slug 186 - 7626 - was not included before - is the very first run, it has 5 sigma Aq (no Aq feedback) and FFB commissioning/noise, but otherwise is fine
  • Slug 186 - 7627 - was included before - Has 2 sigma Aq (bad Aq feedback). Also, FFB turning on an off is a mess, but as far as I can tell, there is no negative impact on slopes or corrections (so it should be tolerated)
  • Slug 186 - 7628 - needs cuts - One very brief 1.5 mm 12X jump
  • Slug 186 - 7630 - needs cuts - Another brief 1.5 mm 12X jump
  • Slug 186 - 7631 - needs cuts - Another brief 1.5 mm 12X jump
  • Slug 186 - 7632 - Really huge FFB noise... is it worth keeping the 150um + BPM Y RMS data? X is OK.
  • Slug 186 - 7634 - Really huge FFB noise still
  • Slug 186 - 7635 - BPM 1 YP wire looks fishy, otherwise OK. Some BPM 12X noise, very brief. Same FFB noise problems as before.

Sakib

Weibin

Victoria

Robert

General

  • Need global cuts on ATs