Difference between revisions of "PREX/CREX Apr 6 2017 1:00pm EDT"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> PREX/CREX_Teleconferences previous meeting << >> [[PREX/CREX_Apr_15_2017_1:00pm_EDT|following m...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
Back to [[Main_Page|Main Page]] >> [[PREX/CREX_Teleconferences]]  
 
Back to [[Main_Page|Main Page]] >> [[PREX/CREX_Teleconferences]]  
  
[[PREX/CREX_Mar_30_2017_1:00pm_EDT|previous meeting]] <<  >> [[PREX/CREX_Apr_15_2017_1:00pm_EDT|following meeting]]
+
[[PREX/CREX_Mar_30_2017_1:00pm_EDT|previous meeting]] <<  >> [[PREX/CREX_Apr_13_2017_1:00pm_EDT|following meeting]]
  
  
Line 13: Line 13:
  
 
== Agenda ==
 
== Agenda ==
# topic
+
# Tyler: vacuum window calculation
#* comments
+
#* TK: reviewed with Seamus the calculation and working on it now so that I can independently compare with Seamus and Bob
 +
#*BM: get the same conclusion; i.e. marginal improvement. KP: we should really know the window thickness. BM: working to find a better estimate than the conservative 40mills. SC: these were the windows used for the vacuum chamber for Qweak (40mills thick). Robin will have to weigh in.
 +
# Kent: B-field simulations
 +
#* KP: meeting with GU and JM. GU is getting more information from JM. JM has gotten RADIA working and doing some preliminary testing. GU: by next Monday I should have results.
 +
# Kent: activation and radiation
 +
#* KP: LZ is trying to match to his old calculation. He thinks he has everything he needs to get the calculation going.
 +
#* KP: CG should present a status of the FLUKA/G4 comparison
 +
# Kent: Other
 +
#* KP: in 3 weeks (+1 day) we have a phone meeting to discuss ERR. Expect to get: B-field calc, rad calculation, Ca target calculation,
 +
#* KK: Tyler will be at JLab for 1 year starting Sept 1st.
  
 
== Attendance ==
 
== Attendance ==
 
+
Victoria O, Tyler K, Tao Y, Dustin M, Ciprian G, Bob M, Kent P, Silviu C, Paul S, KK, Guido U,
 
=== Excused: ===
 
=== Excused: ===

Latest revision as of 13:50, 12 April 2017

Back to Main Page >> PREX/CREX_Teleconferences

previous meeting << >> following meeting


Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 PARTICIPANT CODE:                  913380354#
 Room IRL:                            CEBAF F227


Agenda

  1. Tyler: vacuum window calculation
    • TK: reviewed with Seamus the calculation and working on it now so that I can independently compare with Seamus and Bob
    • BM: get the same conclusion; i.e. marginal improvement. KP: we should really know the window thickness. BM: working to find a better estimate than the conservative 40mills. SC: these were the windows used for the vacuum chamber for Qweak (40mills thick). Robin will have to weigh in.
  2. Kent: B-field simulations
    • KP: meeting with GU and JM. GU is getting more information from JM. JM has gotten RADIA working and doing some preliminary testing. GU: by next Monday I should have results.
  3. Kent: activation and radiation
    • KP: LZ is trying to match to his old calculation. He thinks he has everything he needs to get the calculation going.
    • KP: CG should present a status of the FLUKA/G4 comparison
  4. Kent: Other
    • KP: in 3 weeks (+1 day) we have a phone meeting to discuss ERR. Expect to get: B-field calc, rad calculation, Ca target calculation,
    • KK: Tyler will be at JLab for 1 year starting Sept 1st.

Attendance

Victoria O, Tyler K, Tao Y, Dustin M, Ciprian G, Bob M, Kent P, Silviu C, Paul S, KK, Guido U,

Excused: