Difference between revisions of "PREX/CREX Jul 20 2017 11:00am EDT"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> PREX/CREX_Teleconferences previous meeting << >> [[PREX/CREX_Jul_27_2017_11:00am_EDT|following...")
 
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
  
 
== Agenda ==
 
== Agenda ==
# Ciprian/Adam dump configuration
+
# Ciprian/Adam dump configuration [https://prex.jlab.org/wiki/images/e/e0/170720_PREX_DumpRad_CGal.pdf slides]
#* comment
+
#* KP: steel plate was representing a general amount of backsplash from the structures in the dump tunnel
 +
#* KP: what about poly vs concrete? CG: will run with poly
  
 
== Attendance ==
 
== Attendance ==
 +
Sanghwa P, Cameron C, Dave G, Ciprian G, Bob M, Tyler K, Kent P, Caryn P, Paul S, Silviu D,
  
 
=== Excused: ===
 
=== Excused: ===
 +
KK,

Latest revision as of 13:43, 21 July 2017

Back to Main Page >> PREX/CREX_Teleconferences

previous meeting << >> following meeting


Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 PARTICIPANT CODE:                  913380354#
 Room IRL:                            CEBAF F228


Agenda

  1. Ciprian/Adam dump configuration slides
    • KP: steel plate was representing a general amount of backsplash from the structures in the dump tunnel
    • KP: what about poly vs concrete? CG: will run with poly

Attendance

Sanghwa P, Cameron C, Dave G, Ciprian G, Bob M, Tyler K, Kent P, Caryn P, Paul S, Silviu D,

Excused:

KK,