Difference between revisions of "20171220-Radiation-Mtg"

From PREX Wiki
Jump to navigationJump to search
Line 17: Line 17:
 
# Victoria [https://prex.jlab.org/wiki/index.php/File:20Dec_Owen.pdf figures]
 
# Victoria [https://prex.jlab.org/wiki/index.php/File:20Dec_Owen.pdf figures]
 
#* VO: the collimator should be thinner on the US side of the jacket. We will have to eventually implement that in FLUKA.
 
#* VO: the collimator should be thinner on the US side of the jacket. We will have to eventually implement that in FLUKA.
 +
#* CG: could we replace box material with Aluminum after you make the DS flange? VO: will do
 +
#* KP: we should shift these plots to US because 50 cm DS the septum will provide shielding. VO: will do
 +
#* VO: George pointed out that we can look at a beam off days. We may want to look at the activation mid-run. DA: the long-lived half-life stuff will not be present during “maintenance day”
 +
#* CG: backup on github repo and put output onto tape? DA: sounds like a good plan. We will also try to write a tech note about this.
 +
#* KP: important components: vacuum enclosures, septum yoke (and maybe some copper), vacuum pipes, US beam pipe would probably be sufficient
  
 
== Attendance ==
 
== Attendance ==

Revision as of 11:56, 20 December 2017

Back to Main Page >> Radiation_Mtg


previous meeting << >> following meeting


Logistic information

 https://bluejeans.com/6767060495  
 BlueJeans calling instructions:
   Toll-Free Number (U.S.&  Canada):  888-240-2560
   International toll number:         408-740-7256
   PARTICIPANT CODE:                  #6767060495
   Room IRL:                            <none>


Agenda / Minutes

  1. Victoria figures
    • VO: the collimator should be thinner on the US side of the jacket. We will have to eventually implement that in FLUKA.
    • CG: could we replace box material with Aluminum after you make the DS flange? VO: will do
    • KP: we should shift these plots to US because 50 cm DS the septum will provide shielding. VO: will do
    • VO: George pointed out that we can look at a beam off days. We may want to look at the activation mid-run. DA: the long-lived half-life stuff will not be present during “maintenance day”
    • CG: backup on github repo and put output onto tape? DA: sounds like a good plan. We will also try to write a tech note about this.
    • KP: important components: vacuum enclosures, septum yoke (and maybe some copper), vacuum pipes, US beam pipe would probably be sufficient

Attendance

Cip, Kent, David, Victoria

Excused: