Difference between revisions of "20180313-Radiation-Mtg"

From PREX Wiki
Jump to navigationJump to search
 
Line 1: Line 1:
 
Back to [[Main_Page|Main Page]] >> [[Radiation_Mtg]]
 
Back to [[Main_Page|Main Page]] >> [[Radiation_Mtg]]
 
   
 
   
[[20180220-Radiation-Mtg|previous meeting]] <<  >> [[20180327-Radiation-Mtg|following meeting]]
+
[[20180220-Radiation-Mtg|previous meeting]] <<  >> [[20180320-Radiation-Mtg|following meeting]]
  
  

Latest revision as of 11:23, 19 March 2018

Back to Main Page >> Radiation_Mtg

previous meeting << >> following meeting


Logistic information

 https://bluejeans.com/6767060495  
 BlueJeans calling instructions:
   Toll-Free Number (U.S.&  Canada):  888-240-2560
   International toll number:         408-740-7256
   PARTICIPANT CODE:                  https://bluejeans.com/190761523


Agenda / Minutes

  1. FLUKA sim: Victoria
    • VO: slides will be ready in a few days
    • VO: added geometry for septum (vacuum enclosures, copper coils and flange at the end of the beam pipe). KP: we should carefully check the dimensions.
    • VO: ran crex and we get faster cooling and starts off with lower radiation levels compared to prex.
    • VO: the DS septum end is 1 order of magnitude cooler compared to side of the collimator. KP: we should try to implement the B field in the pipe.

Attendance

Kent P, Victoria O, David A, Ciprian G

Excused: