Difference between revisions of "PREX/CREX Apr 4, 2018 10:00am"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> PREX/CREX_Teleconferences previous meeting << >> PREX/CREX_Apr_11,_2018_10:00am|following meeti...")
 
 
(2 intermediate revisions by one other user not shown)
Line 12: Line 12:
  
 
== Agenda ==
 
== Agenda ==
# topic
+
# Status: Ciprian
#* comments
+
#* CG: Eric, Sanghwa, Kent and I are working to push the Moller polarimeter simulations forward.
 +
#* CG: Adam is working on TOSCA simulations for 1 arm running using the models developed by Jay
 +
#* CG: Adam is creating a tritium configuration to look at the boundary dose estimates as a further benchmark for our method
 +
#* KK: the new budget almost ensures that Tritium will be completed this year (as long as the accelerator cooperates). Additionally ~10M$ was given for the upgrade of the ESR (which will be needed for MOLLER). CG: this means that the summer down will be shorter so any work will have to planned carefully.
 +
#* CC: will work on SAM configurations later this week
  
 
== Attendance ==
 
== Attendance ==
 
+
Ciprian G, Adam Z, Eric K, Paul S, Robert M, Ryan R, Seamus R, Silviu D, Tao Y, Devi A, Amali P, Jay B, KK, Victoria O, Dustin M, Caryn P, Cameron C,
 
=== Excused: ===
 
=== Excused: ===
 
Kent P, Dave G, David A, Sanghwa P
 
Kent P, Dave G, David A, Sanghwa P
 +
 +
 +
[[Category:Meetings]]
 +
[[Category:Prex Weekly Meeting]]

Latest revision as of 15:44, 7 June 2018

Back to Main Page >> PREX/CREX_Teleconferences

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  627 455 790
 Bluejeans link: https://bluejeans.com/627455790
 Offline room:   CEBAF Center L210A

Agenda

  1. Status: Ciprian
    • CG: Eric, Sanghwa, Kent and I are working to push the Moller polarimeter simulations forward.
    • CG: Adam is working on TOSCA simulations for 1 arm running using the models developed by Jay
    • CG: Adam is creating a tritium configuration to look at the boundary dose estimates as a further benchmark for our method
    • KK: the new budget almost ensures that Tritium will be completed this year (as long as the accelerator cooperates). Additionally ~10M$ was given for the upgrade of the ESR (which will be needed for MOLLER). CG: this means that the summer down will be shorter so any work will have to planned carefully.
    • CC: will work on SAM configurations later this week

Attendance

Ciprian G, Adam Z, Eric K, Paul S, Robert M, Ryan R, Seamus R, Silviu D, Tao Y, Devi A, Amali P, Jay B, KK, Victoria O, Dustin M, Caryn P, Cameron C,

Excused:

Kent P, Dave G, David A, Sanghwa P