Difference between revisions of "DAQ Meeting/20180801"
From PREX Wiki
Jump to navigationJump to searchLine 10: | Line 10: | ||
==Agenda== | ==Agenda== | ||
− | * Bob : Replace bad NIM crate with new one and ensure that original functionality is still there, including the delayed T_Settle output to the STR7200 Scaler | + | * Bob and Cameron : Replace bad NIM crate with new one and ensure that original functionality is still there, including the delayed T_Settle output to the STR7200 Scaler |
− | * Bob : Get Bank data structure incorporated in Prex_ts_banks.crl functionality | + | * Bob and Cameron : Get Bank data structure incorporated in Prex_ts_banks.crl functionality |
==Minutes== | ==Minutes== | ||
− | * Replace NIM crate in Injector Parity DAQ | + | * Bob and Cameron: Replace NIM crate in Injector Parity DAQ |
** We replaced the bad NIM crate with a new one from Riad | ** We replaced the bad NIM crate with a new one from Riad | ||
** We noted the wires and put everything back | ** We noted the wires and put everything back | ||
Line 26: | Line 26: | ||
*** Amali's notes for checking helicity signal - | *** Amali's notes for checking helicity signal - | ||
− | * Adding in Bank structures to Prex_ts_banks.crl | + | * Bob and Cameron: Adding in Bank structures to Prex_ts_banks.crl |
** Bob says that putting a bank around groups of similar modules is fine, rather than having a bank per individual module | ** Bob says that putting a bank around groups of similar modules is fine, rather than having a bank per individual module | ||
** This could get complicated for the current configuration that has some conditional flags determining which modules are read for the same old-style header | ** This could get complicated for the current configuration that has some conditional flags determining which modules are read for the same old-style header |
Revision as of 13:54, 3 August 2018
Back to Main Page >> DAQ Documentation Portal >> DAQ Meetings
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 475 839 391 Bluejeans link: https://bluejeans.com/475839391
Agenda
- Bob and Cameron : Replace bad NIM crate with new one and ensure that original functionality is still there, including the delayed T_Settle output to the STR7200 Scaler
- Bob and Cameron : Get Bank data structure incorporated in Prex_ts_banks.crl functionality
Minutes
- Bob and Cameron: Replace NIM crate in Injector Parity DAQ
- We replaced the bad NIM crate with a new one from Riad
- We noted the wires and put everything back
- We also restored the T_Settle delayed-to-STR7200 module
- The delay offset is not behaving as expected when twisting knobs - Ask Paul King
- Run 4122 is an Injector.crl run in TI-standalone triggering mode
- Run 4123 is another - data looks good in both
- Check if the helicity signal looks good
- Amali's notes for checking helicity signal -
- Bob and Cameron: Adding in Bank structures to Prex_ts_banks.crl
- Bob says that putting a bank around groups of similar modules is fine, rather than having a bank per individual module
- This could get complicated for the current configuration that has some conditional flags determining which modules are read for the same old-style header