# Bob: Nov 11-12 collaboration meeting will be in room F113
 +
# Dustin: Comments that the weirdness in last week's presentation (downstream detector showing much less signal) was a bug. Will update presentation.
 +
#* Cameron: points out that a subgroup meeting for the quartz detector is probably going to happen this week
 +
# Bob: we should finish the infrastructure needs list.
 +
#* Dustin: will circulate his list this after noon (SBU, Bob, Seamus, Kent)
 +
#* We should try to finish and submit the list this week, as Bob is gone in Korea next week.
 
# Adam Z: [CAD Model of SAMs https://prex.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=232]
 
# Adam Z: [CAD Model of SAMs https://prex.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=232]
#* comment
+
#* Top priority is getting radiation results as a function of can thickness. Cameron will do this.
 +
#* Dustin wants to order quartz pieces in next week or two.
  
 
== Present ==
 
== Present ==

Revision as of 10:44, 4 September 2018

Back to Main Page >> PREX/CREX_Teleconferences

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  555 144 462
 Bluejeans link: https://bluejeans.com/555144462
 Offline room:   CEBAF Center F324-325

Agenda

  1. Bob: Nov 11-12 collaboration meeting will be in room F113
  2. Dustin: Comments that the weirdness in last week's presentation (downstream detector showing much less signal) was a bug. Will update presentation.
    • Cameron: points out that a subgroup meeting for the quartz detector is probably going to happen this week
  3. Bob: we should finish the infrastructure needs list.
    • Dustin: will circulate his list this after noon (SBU, Bob, Seamus, Kent)
    • We should try to finish and submit the list this week, as Bob is gone in Korea next week.
  4. Adam Z: [CAD Model of SAMs https://prex.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=232]
    • Top priority is getting radiation results as a function of can thickness. Cameron will do this.
    • Dustin wants to order quartz pieces in next week or two.