Difference between revisions of "PREX/CREX Sep 4, 2018 10:00am"
From PREX Wiki
Jump to navigationJump to search (→Agenda) |
Kent Paschke (talk | contribs) (→Agenda) |
||
Line 12: | Line 12: | ||
== Agenda == | == Agenda == | ||
+ | # Bob: Nov 11-12 collaboration meeting will be in room F113 | ||
+ | # Dustin: Comments that the weirdness in last week's presentation (downstream detector showing much less signal) was a bug. Will update presentation. | ||
+ | #* Cameron: points out that a subgroup meeting for the quartz detector is probably going to happen this week | ||
+ | # Bob: we should finish the infrastructure needs list. | ||
+ | #* Dustin: will circulate his list this after noon (SBU, Bob, Seamus, Kent) | ||
+ | #* We should try to finish and submit the list this week, as Bob is gone in Korea next week. | ||
# Adam Z: [CAD Model of SAMs https://prex.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=232] | # Adam Z: [CAD Model of SAMs https://prex.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=232] | ||
− | #* | + | #* Top priority is getting radiation results as a function of can thickness. Cameron will do this. |
+ | #* Dustin wants to order quartz pieces in next week or two. | ||
== Present == | == Present == |
Revision as of 10:44, 4 September 2018
Back to Main Page >> PREX/CREX_Teleconferences
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 555 144 462 Bluejeans link: https://bluejeans.com/555144462 Offline room: CEBAF Center F324-325
Agenda
- Bob: Nov 11-12 collaboration meeting will be in room F113
- Dustin: Comments that the weirdness in last week's presentation (downstream detector showing much less signal) was a bug. Will update presentation.
- Cameron: points out that a subgroup meeting for the quartz detector is probably going to happen this week
- Bob: we should finish the infrastructure needs list.
- Dustin: will circulate his list this after noon (SBU, Bob, Seamus, Kent)
- We should try to finish and submit the list this week, as Bob is gone in Korea next week.
- Adam Z: [CAD Model of SAMs https://prex.jlab.org/cgi-bin/DocDB/private/ShowDocument?docid=232]
- Top priority is getting radiation results as a function of can thickness. Cameron will do this.
- Dustin wants to order quartz pieces in next week or two.