Difference between revisions of "Weekly Meeting Discussion Topics"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) |
Ciprian Gal (talk | contribs) |
||
Line 1: | Line 1: | ||
+ | = List of Topics = | ||
+ | |||
+ | {| class="wikitable sortable" | ||
+ | |+ | ||
+ | ! width=33% class="unsortable"|<b>Task</b> || class="unsortable"|<b>Responsible</b> || width=40% class="unsortable"|<b>Status </b> || <b>Last update</b> || class="unsortable"|<b>Link</b> | ||
+ | |- | ||
+ | |Scheduling for PQB time at the end of APEX || CG || - || 11/27/2018 || - | ||
+ | |- | ||
+ | |Beamline checkout || Ye, Bob || - || - || - | ||
+ | |- | ||
+ | |Injector setup and feedback || Caryn, Amali || - || - || - | ||
+ | |- | ||
+ | |Beam modulation || Victoria, Ye || - || - || - | ||
+ | |- | ||
+ | |GEM detectors || Seamus || - || - || - | ||
+ | |- | ||
+ | |Ion chamber positions || CG || - || - || - | ||
+ | |- | ||
+ | |Moller polarimeter || Eric, Sanghwa || - || - || - | ||
+ | |- | ||
+ | |Data Acquisition || Bob || - || - || - | ||
+ | |- | ||
+ | |Tracking and optics || Chandan, Seamus || - || - || - | ||
+ | |- | ||
+ | |Integrating detectors || Dustin || - || - || - | ||
+ | |- | ||
+ | |Analyzer || Paul || - || - || - | ||
+ | |- | ||
+ | |Compton polarimeter || Adam, CG || - || - || - | ||
+ | |- | ||
+ | |Cavity Beam Monitors || Ye || - || - || - | ||
+ | |- | ||
+ | |Integrating Beam Monitors || CG? || - || - || - | ||
+ | |} | ||
+ | |||
+ | |||
==List of discussion topics== | ==List of discussion topics== | ||
Revision as of 10:08, 27 November 2018
List of Topics
Task | Responsible | Status | Last update | Link |
---|---|---|---|---|
Scheduling for PQB time at the end of APEX | CG | - | 11/27/2018 | - |
Beamline checkout | Ye, Bob | - | - | - |
Injector setup and feedback | Caryn, Amali | - | - | - |
Beam modulation | Victoria, Ye | - | - | - |
GEM detectors | Seamus | - | - | - |
Ion chamber positions | CG | - | - | - |
Moller polarimeter | Eric, Sanghwa | - | - | - |
Data Acquisition | Bob | - | - | - |
Tracking and optics | Chandan, Seamus | - | - | - |
Integrating detectors | Dustin | - | - | - |
Analyzer | Paul | - | - | - |
Compton polarimeter | Adam, CG | - | - | - |
Cavity Beam Monitors | Ye | - | - | - |
Integrating Beam Monitors | CG? | - | - | - |
List of discussion topics
- Scheduling for PQB time at the end of APEX (CG?!) every 6 weeks (Starts on 27th Nov)
- Beamline checkout (Ye, Bob) every 4 weeks (Starts on 27th Nov)
- Injector setup and feedback (Caryn, Amali) every 5 weeks (Starts on 4th Dec)
- Beam modulation (Victoria, Ye) every 4 weeks (Starts on 4th Dec)
- GEM detectors (Seamus) "every 4 weeks" (Starts on 4th Dec)
- Ion chamber positions (CG) every 6 weeks (Starts on 11th Dec)
- Moller polarimeter (Eric, Sanghwa) every 4 weeks (Starts on 11th Dec)
- Data Acquisition (Bob) "every 4 weeks" (Starts on 11th Dec?)
- Tracking and optics (Chandan, Seamus) every 4 weeks (Starts on 11th Dec)
- Integrating detectors (Dustin) every 6 weeks (Starts on 18th Dec)
- Analyzer (Paul) every 4 weeks (Starts on 18th Dec)
- Compton polarimeter (Adam, CG) every 4 weeks (Starts on 18th Dec)
- Cavity Beam Monitors (Ye) "every 6 weeks" (Starts in January?)
- Integrating Beam Monitors (CG?) (Start in January?)