Difference between revisions of "DAQ Testing/20181111"
From PREX Wiki
Jump to navigationJump to search (Created page with "Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes File:Ti...") |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Back to [[Main_Page|Main Page]] >> [[DAQ_Doc_Portal|DAQ Documentation Portal]] >> [[DAQ_Testing|DAQ Testing]] >> [[DAQ_Commissioning_Notes|DAQ Commissioning Notes]] | Back to [[Main_Page|Main Page]] >> [[DAQ_Doc_Portal|DAQ Documentation Portal]] >> [[DAQ_Testing|DAQ Testing]] >> [[DAQ_Commissioning_Notes|DAQ Commissioning Notes]] | ||
− | [[File:Timing-Injector-Flexio.png|frame| | + | [[File:Timing-Injector-Flexio-11-11-2018.png|frame|New-Example Timing Diagram, Injector, FLEXIO - Contains all Helicity Signals]] |
− | [[DAQ_Testing/20181106|Previous Day of Testing]] << >> [[DAQ_Testing/ | + | [[DAQ_Testing/20181106|Previous Day of Testing]] << >> [[DAQ_Testing/20181114|Next Day of Testing]] |
− | November | + | November 11th, 2018 |
− | Testers: Bob, Cameron, Paul King, Amali | + | Testers: Bob, Cameron, Paul King, Amali, Caryn |
See [[DAQ_Meeting/20181111|Today's Meeting Notes]] | See [[DAQ_Meeting/20181111|Today's Meeting Notes]] | ||
Line 15: | Line 15: | ||
== FLEXIO Scaler == | == FLEXIO Scaler == | ||
=== New setting, delays FLEXIO latch LNE === | === New setting, delays FLEXIO latch LNE === | ||
+ | The FLEXIO scaler is used to count all of the helicity related information in 4 input channels, with a 100 us delayed (50 ns long) Tstable used to latch LNE, needed to correct helicity sequence errors | ||
+ | * Channel 0 = HEL+ | ||
+ | * Channel 1 = HEL- | ||
+ | * Channel 2 = MPS/QRT/MultiSync | ||
+ | * Channel 4 = Pair Sync | ||
+ | * All channels are the standard helicity information with no surprises | ||
+ | * [[:media:Timing-Injector-Flexio-11-11-2018.png|New-Timing Diagram, Injector, FLEXIO]] | ||
=== Was, as of 11/6/2018 test === | === Was, as of 11/6/2018 test === | ||
Line 26: | Line 33: | ||
== Results == | == Results == | ||
− | * | + | * We changed the FLEXIO latch LNE to be delayed until after the prior event was read out, adding a new delayed Tsettle with a 100 us delay and 50 ns gate length (irrelevant). |
== To Do == | == To Do == | ||
− | * | + | * It turns out that the timing diagram for the SIS3801 appears to conflict with the readouts, in that it looks like the SIS3801 is reading the current event (like the FLEXIO has now been changed to be, when it is supposed to be reading the prior one. |
+ | * We should double check the old timing diagram and fix the delay if the drawing was drawn wrong, and figure out what is going on with the helicity information if the drawing is correct (since it seems to be behaving differently). | ||
[[Category:DAQ_Testing]] | [[Category:DAQ_Testing]] |
Latest revision as of 14:53, 29 November 2018
Back to Main Page >> DAQ Documentation Portal >> DAQ Testing >> DAQ Commissioning Notes
Previous Day of Testing << >> Next Day of Testing
November 11th, 2018 Testers: Bob, Cameron, Paul King, Amali, Caryn
Goals
Fix the timing in the FLEXIO so that it latches LNE after the events are read out (at least ~1us after Tstable, can use 112 VQweak wait signal) instead of right at Tstable as it was
FLEXIO Scaler
New setting, delays FLEXIO latch LNE
The FLEXIO scaler is used to count all of the helicity related information in 4 input channels, with a 100 us delayed (50 ns long) Tstable used to latch LNE, needed to correct helicity sequence errors
- Channel 0 = HEL+
- Channel 1 = HEL-
- Channel 2 = MPS/QRT/MultiSync
- Channel 4 = Pair Sync
- All channels are the standard helicity information with no surprises
- New-Timing Diagram, Injector, FLEXIO
Was, as of 11/6/2018 test
The FLEXIO scaler is used to count all of the helicity related information in 4 input channels, with Tstable was used to latch LNE
- Channel 0 = HEL+
- Channel 1 = HEL-
- Channel 2 = MPS/QRT/MultiSync
- Channel 4 = Pair Sync
- All channels are the standard helicity information with no surprises
- Old-Timing Diagram, Injector, FLEXIO
Results
- We changed the FLEXIO latch LNE to be delayed until after the prior event was read out, adding a new delayed Tsettle with a 100 us delay and 50 ns gate length (irrelevant).
To Do
- It turns out that the timing diagram for the SIS3801 appears to conflict with the readouts, in that it looks like the SIS3801 is reading the current event (like the FLEXIO has now been changed to be, when it is supposed to be reading the prior one.
- We should double check the old timing diagram and fix the delay if the drawing was drawn wrong, and figure out what is going on with the helicity information if the drawing is correct (since it seems to be behaving differently).