Difference between revisions of "20181205-Analyzer-Mtg"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> Analyzer_Meeting previous meeting << >> following meeting == Logistic informatio...")
 
Line 18: Line 18:
 
#*
 
#*
 
# et_bridge and deadtime
 
# et_bridge and deadtime
#*
+
#* CC: looked at trying to use the java gui to look at dead time.
 
# DAQ issues
 
# DAQ issues
#*
+
#* YT: For the test stand we setup the server port and got some CODA signal. We’ll continue to work on it.
 
# VQWK adcs
 
# VQWK adcs
#*
+
#*  
 
# Other issues
 
# Other issues
#*
+
#* KP: What is the status for feedback for pan with blocks and et-server??! KP: by 17-19th we should have a test DAQ and analysis with new system
 +
#* YT: the bmw (beam modulation) words/root output needs to be put into the analysis software. KP: this has to be taken up by the beam modulation group (Ye, Victoria, Kent). PK: you can use the old(Qweak) modulation system as a starting point.
  
 
== Present ==
 
== Present ==
 +
Paul K, Ye Tian, Kent P, Cameron C, Ciprian G, Sakib Rahman, 
  
 
===Excused===
 
===Excused===

Revision as of 16:31, 5 December 2018

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  684 884 269
 Bluejeans link: https://bluejeans.com/684884269

github repository: JAPAN

Agenda

  1. online plots
  2. regression analysis
  3. et_bridge and deadtime
    • CC: looked at trying to use the java gui to look at dead time.
  4. DAQ issues
    • YT: For the test stand we setup the server port and got some CODA signal. We’ll continue to work on it.
  5. VQWK adcs
  6. Other issues
    • KP: What is the status for feedback for pan with blocks and et-server??! KP: by 17-19th we should have a test DAQ and analysis with new system
    • YT: the bmw (beam modulation) words/root output needs to be put into the analysis software. KP: this has to be taken up by the beam modulation group (Ye, Victoria, Kent). PK: you can use the old(Qweak) modulation system as a starting point.

Present

Paul K, Ye Tian, Kent P, Cameron C, Ciprian G, Sakib Rahman,

Excused