Difference between revisions of "GEM Meeting/20190118"
From PREX Wiki
Jump to navigationJump to searchChandabindu (talk | contribs) |
Chandabindu (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 12: | Line 12: | ||
==Minutes== | ==Minutes== | ||
− | + | # Seamus: Updates on gas distribution system & UVa GEM mouting structure. | |
+ | # Chandan: Still see the data word mismatch problem seen at SLAC. Tried to take data with clock-synchronization between MPDs. It didn't help. Planning to move ISU DAQ. | ||
+ | # Chandan: We need MPD time information in the root file generated by SBS-offline. | ||
+ | # Dustin: There might be some root level data decoding problem which leads to QDC to GEM data correlation problem. | ||
+ | # Seamus: We should merge the SLAC analysis and PREX/CREX GEM meeting | ||
== Present == | == Present == |
Latest revision as of 15:40, 1 February 2019
Back to Main Page >> GEM_Meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 998 903 0149 Bluejeans link: https://bluejeans.com/9989030149
Agenda
- Chandan : Test Lab GEM update slides
Minutes
- Seamus: Updates on gas distribution system & UVa GEM mouting structure.
- Chandan: Still see the data word mismatch problem seen at SLAC. Tried to take data with clock-synchronization between MPDs. It didn't help. Planning to move ISU DAQ.
- Chandan: We need MPD time information in the root file generated by SBS-offline.
- Dustin: There might be some root level data decoding problem which leads to QDC to GEM data correlation problem.
- Seamus: We should merge the SLAC analysis and PREX/CREX GEM meeting
Present
Dustin, Seamus, Bryan, Cameron, Tao, Devi, Ryan, Joey, Chandan