Difference between revisions of "20190227-Analyzer-Mtg"

From PREX Wiki
Jump to navigationJump to search
Line 1: Line 1:
 
Back to [[Main_Page|Main Page]] >> [[Analyzer_Meeting]]  
 
Back to [[Main_Page|Main Page]] >> [[Analyzer_Meeting]]  
  
[[20190213-Analyzer-Mtg|previous meeting]] <<  >> [[20190227-Analyzer-Mtg|following meeting]]
+
[[20190213-Analyzer-Mtg|previous meeting]] <<  >> [[20190306-Analyzer-Mtg|following meeting]]
  
 
== Logistic information ==
 
== Logistic information ==
Line 13: Line 13:
  
 
== Agenda ==
 
== Agenda ==
 +
#[https://docs.google.com/spreadsheets/d/1lPRPk-IzzBdXKH4nujMcFYRrRwcvfKOMtl-omLCYO7M/edit?usp=sharing runlist]
 
# "Operations" branch
 
# "Operations" branch
 
#*  Uncommitted param files
 
#*  Uncommitted param files

Revision as of 14:09, 27 February 2019

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  419 045 306
 Bluejeans link: https://bluejeans.com/419045306

Agenda

  1. runlist
  2. "Operations" branch
    • Uncommitted param files
      • Parity/prminput/prexCH_beamline.1283-.map
      • Parity/prminput/prexCH_beamline_pedestal.1329-.map
    • Lots of uncommitted panguin files. Preferentially, new panguin files should be tested and committed from a clone of develop
  3. Pull requests
  4. online plots
  5. regression analysis
  6. feedback
  7. VQWK adcs
  8. DAQ issues
    • Need to change HAPPEX Timing Board settings and VQWK settings to change to 240 Hz mode.
    • Need to clarify process to log into crates CPUs; can we get ssh keys on the console servers so we don't need to know which login to use?
  9. Other issues

Bob's DAQ tasklist

 TO-DO list for Parity DAQ
   updated Jan 4, 2019
Cameron & Bob: 1, 2, 4, 5, 6, 11, 12, 13
Tao & Cameron: 8, 9
Bob: 3, 6, 10
Cip, Cameron, Tao: 13  
1 Doing - Timing: mostly understood, still small mysteries (LNE)
2 Doing - Synchronization-check system. w/help from Ed Jastrzembski
5 To Do - Clean up cabling, labels, fasteners - First need to examine all signals
6 Clean up CRL -- eliminate so-called "dirty trick"
7 Check the 7200 scaler setup at injector, find a spare 7200.
8 Doing - Pedestal studies, aka cross-talk.  
10 Green Monster maintenance.
11 Doing - Test spares.  Repair bad modules.
12 Doing - Document everything.  Circuit diagrams, cable map, "how to".
13 Online software, a bit undefined since software is changing.
    (a) automatic production of run-dependent database
    (b) alarms like end-of-run voice (Bob)
    (c) feedback
    (d) coil-pulsing aka modulation aka dithering (Victoria)
    (e) panguin (GUI showing real-time plots)
    (f) prompt analysis
    (g) e-logbook entries 
    (h) archiving EPICs data


Present

Excused