Difference between revisions of "Weekly Meeting Discussion Topics"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) |
|||
(10 intermediate revisions by one other user not shown) | |||
Line 5: | Line 5: | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
|+ | |+ | ||
− | ! class="unsortable"|<b>Task</b> || class="unsortable"|<b>Responsible</b> || width=40% class="unsortable"|<b>Status </b> || class="unsortable"|<b>Update</b> || <b> | + | ! class="unsortable"|<b>Task</b> || class="unsortable"|<b>Responsible</b> || width=40% class="unsortable"|<b>Status </b> || class="unsortable"|<b>Update</b> || <b>Next update</b> || class="unsortable"|<b>Link to updates</b> |
|- | |- | ||
− | |Scheduling for PQB time at the end of APEX || CG || | + | |Scheduling for PQB time at the end of APEX || CG || list of tasks is crystalized || every 6 weeks || 01/08/2019 || [[PREX/CREX_Nov_27,_2018_10:00am|Nov 27 2018]] |
|- | |- | ||
− | |Injector setup and feedback || Caryn, Amali || | + | |Injector setup and feedback || Caryn, Amali || All set for Jan install of RTP || every 5 weeks || 01/15/2019 || [[PREX/CREX_Dec_11,_2018_10:00am|Dec 11 2018]] |
|- | |- | ||
− | |Beam modulation || Victoria, Ye || | + | |Beam modulation || Victoria, Ye || identified cables, will connect and try to send signal to BSY racks || every 4 weeks || 02/05/2019 || [[PREX/CREX_Dec_4,_2018_10:00am|Dec 4 2018]], [[PREX/CREX_Jan_8,_2019_10:00am|Jan 8 2019]] |
|- | |- | ||
− | |Design status || Kent || | + | |Design status || Kent || everything on track, deadline for everything to be ready March 11th || every 4 weeks || 01/15/2019 || [[PREX/CREX_Dec_4,_2018_10:00am|Dec 4 2018]] |
|- | |- | ||
− | |GEM detectors || Seamus || | + | |GEM detectors || Dustin, Seamus || resources at the lab IDed, || every 4 weeks || 01/22/2019 || [[PREX/CREX_Dec_18,_2018_10:00am|Dec 18 2018]] |
|- | |- | ||
− | |Ion chamber positions || CG || | + | |Ion chamber positions || CG || task should be simple. will iterate through simulation || every 6 weeks || 02/05/2019 || [[PREX/CREX_Dec_11,_2018_10:00am|Dec 11 2018]] |
|- | |- | ||
− | |Moller polarimeter || Eric, Sanghwa || | + | |Moller polarimeter || Eric, Sanghwa, Don || comparisons are improving. Bfield inclusion is finished || every 4 weeks || 01/15/2019 || [[PREX/CREX_Dec_11,_2018_10:00am|Dec 11 2018]] |
|- | |- | ||
− | |Data Acquisition || Bob || | + | |Data Acquisition || Bob || DAQ upgraded to bank readout. system on track || every 4 weeks || 01/22/2019 || [[PREX/CREX_Dec_11,_2018_10:00am|Dec 11 2018]] |
|- | |- | ||
− | |Tracking and optics || Chandan, Seamus || | + | |Tracking and optics || Chandan, Seamus || tracking code needs to be written || every 4 weeks || 01/22/2019 || [[PREX/CREX_Dec_18,_2018_10:00am|Dec 18 2018]] |
|- | |- | ||
− | |Integrating detectors || Dustin || | + | |Integrating detectors || Dustin, Devi || DAQs setup at JLab, work proceeding on schedule || every 6 weeks || 02/19/2019 || [[PREX/CREX_Jan_8,_2019_10:00am|Jan 8 2019]] |
|- | |- | ||
− | |Analyzer || Paul || | + | |Analyzer || Paul || several projects being worked on in parallel || every 4 weeks || 01/29/2019 || [[PREX/CREX_Dec_18,_2018_10:00am|Dec 18 2018]], [[PREX/CREX_Jan_29,_2019_10:00am|Jan 29, 2019]] |
|- | |- | ||
− | |Compton polarimeter || Adam, CG || | + | |Compton polarimeter || Adam, Amali, CG || opened vacuum and replaced mirrors. will try locking || every 4 weeks || 01/15/2019 || [[PREX/CREX_Dec_18,_2018_10:00am|Dec 18 2018]] |
|- | |- | ||
− | |Cavity Beam Monitors || Ye || | + | |Cavity Beam Monitors || Ye || limited test done using epics readout, working DAC still pending, updated analysis with HRS scalers || every 6 weeks || 02/19/2019 || [[PREX/CREX_Nov_27,_2018_10:00am|Nov 27 2018]], [[PREX/CREX_Jan_8,_2019_10:00am|Jan 8 2019]] |
|- | |- | ||
|Integrating Beam Monitors || CG || - || - || 01/08/2019 || - | |Integrating Beam Monitors || CG || - || - || 01/08/2019 || - | ||
|} | |} |
Latest revision as of 13:43, 4 March 2019
Back to PREX/CREX_Teleconferences
List of discussion topics
Task | Responsible | Status | Update | Next update | Link to updates |
---|---|---|---|---|---|
Scheduling for PQB time at the end of APEX | CG | list of tasks is crystalized | every 6 weeks | 01/08/2019 | Nov 27 2018 |
Injector setup and feedback | Caryn, Amali | All set for Jan install of RTP | every 5 weeks | 01/15/2019 | Dec 11 2018 |
Beam modulation | Victoria, Ye | identified cables, will connect and try to send signal to BSY racks | every 4 weeks | 02/05/2019 | Dec 4 2018, Jan 8 2019 |
Design status | Kent | everything on track, deadline for everything to be ready March 11th | every 4 weeks | 01/15/2019 | Dec 4 2018 |
GEM detectors | Dustin, Seamus | resources at the lab IDed, | every 4 weeks | 01/22/2019 | Dec 18 2018 |
Ion chamber positions | CG | task should be simple. will iterate through simulation | every 6 weeks | 02/05/2019 | Dec 11 2018 |
Moller polarimeter | Eric, Sanghwa, Don | comparisons are improving. Bfield inclusion is finished | every 4 weeks | 01/15/2019 | Dec 11 2018 |
Data Acquisition | Bob | DAQ upgraded to bank readout. system on track | every 4 weeks | 01/22/2019 | Dec 11 2018 |
Tracking and optics | Chandan, Seamus | tracking code needs to be written | every 4 weeks | 01/22/2019 | Dec 18 2018 |
Integrating detectors | Dustin, Devi | DAQs setup at JLab, work proceeding on schedule | every 6 weeks | 02/19/2019 | Jan 8 2019 |
Analyzer | Paul | several projects being worked on in parallel | every 4 weeks | 01/29/2019 | Dec 18 2018, Jan 29, 2019 |
Compton polarimeter | Adam, Amali, CG | opened vacuum and replaced mirrors. will try locking | every 4 weeks | 01/15/2019 | Dec 18 2018 |
Cavity Beam Monitors | Ye | limited test done using epics readout, working DAC still pending, updated analysis with HRS scalers | every 6 weeks | 02/19/2019 | Nov 27 2018, Jan 8 2019 |
Integrating Beam Monitors | CG | - | - | 01/08/2019 | - |