Difference between revisions of "20190417-Analyzer-Mtg"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Back to Main Page >> Analyzer_Meeting previous meeting << >> following meeting == Logistic informatio...")
 
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 
Back to [[Main_Page|Main Page]] >> [[Analyzer_Meeting]]  
 
Back to [[Main_Page|Main Page]] >> [[Analyzer_Meeting]]  
  
[[20190403-Analyzer-Mtg|previous meeting]] <<  >> [[20190417-Analyzer-Mtg|following meeting]]
+
[[20190410-Analyzer-Mtg|previous meeting]] <<  >> [[20190424-Analyzer-Mtg|following meeting]]
  
 
== Logistic information ==
 
== Logistic information ==
Line 15: Line 15:
 
#respin of APEX runs: [https://docs.google.com/spreadsheets/d/1lPRPk-IzzBdXKH4nujMcFYRrRwcvfKOMtl-omLCYO7M/edit?usp=sharing runlist]
 
#respin of APEX runs: [https://docs.google.com/spreadsheets/d/1lPRPk-IzzBdXKH4nujMcFYRrRwcvfKOMtl-omLCYO7M/edit?usp=sharing runlist]
 
#* What output do we have?
 
#* What output do we have?
#**  
+
#** TY: still working on the 30 uA runs (Adam volunteered).
 +
#** DA: will investigate the 40 uA runs starting today
 
#* Agregator?
 
#* Agregator?
#**  
+
#** PK: working on the aggregator bug. Seems to be a problem with the post-pan outputs on top of the regular aggregator SR: the aggregator works, but not through panguin. created a separate wrapper.
 +
#** PK: we need to have BCMs, BPMs, SAMs, yields and asymmetries/differences for the aggregators.
 
#* Pair tree plots?
 
#* Pair tree plots?
#**  
+
#** TY: already integrated in the current outputs
 
#*  Do we have a "process a run" analysis chain ready?  Do we want to set it up as a script? >> This will develop into the prompt analysis script.
 
#*  Do we have a "process a run" analysis chain ready?  Do we want to set it up as a script? >> This will develop into the prompt analysis script.
#**  
+
#** KP: we should change the ordering/design of the prompt summary to make it more readable.
 
# "Operations" branch
 
# "Operations" branch
 
#*  
 
#*  
 
# regression analysis
 
# regression analysis
#*  
+
#* PK: the lin-reg-blue and the data handlers work on the develop branch and Robert will compare with post-pan regression.
 +
#* KP: will provide a grand correlator example.
 
# feedback
 
# feedback
#*  
+
#* PK: Amali is working on position feedback
 
#  Beam modulation
 
#  Beam modulation
#*  
+
#* PK: YT and I will make some changes to the bmwClient and Victoria is working on the decoded for the beam mod data in japan
 
# VQWK adcs
 
# VQWK adcs
#*  
+
#* PK: all ok.
 
# EPICS run-start and fast logger (and EPICS decoder to slow tree)
 
# EPICS run-start and fast logger (and EPICS decoder to slow tree)
#*  
+
#* RR: the epicsFastLogger is working will be enabled with the rest of the scripts at runStart. CG: you should first check the decoding in japan. RR: will do
 
# bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed. This affects feedback as well and can change values when a CODA run is started with the gateway open.
 
# bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed. This affects feedback as well and can change values when a CODA run is started with the gateway open.
 
#*  
 
#*  
 
# Bob's DAQ tasklist
 
# Bob's DAQ tasklist
 
#* Timing: mostly understood, still small mysteries (LNE)
 
#* Timing: mostly understood, still small mysteries (LNE)
#** PK: we restructured the timing between the injector and CH crates.
+
#** PK: will check with Caryn when it would be a good time to work on timing
 
#* Synchronization-check system. w/help from Ed Jastrzembski
 
#* Synchronization-check system. w/help from Ed Jastrzembski
 
#** Cameron working on.
 
#** Cameron working on.
 
#* Clean up cabling, labels, fasteners - First need to examine all signals
 
#* Clean up cabling, labels, fasteners - First need to examine all signals
#** CH crate has a preliminary cleanup and Caryn is doing
+
#** CH crate has a preliminary cleanup and Caryn is checking signals
 
#* Clean up CRL -- eliminate so-called "dirty trick"
 
#* Clean up CRL -- eliminate so-called "dirty trick"
 
#** ??
 
#** ??
Line 52: Line 55:
 
#** AZ: having a separate issue from bmw.  
 
#** AZ: having a separate issue from bmw.  
 
#* automatic production of run-dependent database
 
#* automatic production of run-dependent database
#** Sanghwa is working on this.
+
#** SP: working on firewall issues. The DB is already backfilled and we have scripts ready.
 
#* alarms like end-of-run voice
 
#* alarms like end-of-run voice
 
#** later
 
#** later
Line 60: Line 63:
  
 
== Present ==
 
== Present ==
 
+
Bob M, Devi A, Kent P, Tao Y, Paul K, Sakib R, Ye T, Ciprian G, Sakib R, Cameron C,Robert R, Sanghwa P
 
===Excused===
 
===Excused===
  
 
[[Category:Meetings]]
 
[[Category:Meetings]]
 
[[Category:Analyzer_Meeting]]
 
[[Category:Analyzer_Meeting]]

Latest revision as of 10:04, 19 April 2019

Back to Main Page >> Analyzer_Meeting

previous meeting << >> following meeting

Logistic information

Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                  419 045 306
 Bluejeans link: https://bluejeans.com/419045306

Agenda

  1. respin of APEX runs: runlist
    • What output do we have?
      • TY: still working on the 30 uA runs (Adam volunteered).
      • DA: will investigate the 40 uA runs starting today
    • Agregator?
      • PK: working on the aggregator bug. Seems to be a problem with the post-pan outputs on top of the regular aggregator SR: the aggregator works, but not through panguin. created a separate wrapper.
      • PK: we need to have BCMs, BPMs, SAMs, yields and asymmetries/differences for the aggregators.
    • Pair tree plots?
      • TY: already integrated in the current outputs
    • Do we have a "process a run" analysis chain ready? Do we want to set it up as a script? >> This will develop into the prompt analysis script.
      • KP: we should change the ordering/design of the prompt summary to make it more readable.
  2. "Operations" branch
  3. regression analysis
    • PK: the lin-reg-blue and the data handlers work on the develop branch and Robert will compare with post-pan regression.
    • KP: will provide a grand correlator example.
  4. feedback
    • PK: Amali is working on position feedback
  5. Beam modulation
    • PK: YT and I will make some changes to the bmwClient and Victoria is working on the decoded for the beam mod data in japan
  6. VQWK adcs
    • PK: all ok.
  7. EPICS run-start and fast logger (and EPICS decoder to slow tree)
    • RR: the epicsFastLogger is working will be enabled with the rest of the scripts at runStart. CG: you should first check the decoding in japan. RR: will do
  8. bmwClient has issues with not pausing when CODA isn't in progress, being stopped and restarted, and to have parameters changed. This affects feedback as well and can change values when a CODA run is started with the gateway open.
  9. Bob's DAQ tasklist
    • Timing: mostly understood, still small mysteries (LNE)
      • PK: will check with Caryn when it would be a good time to work on timing
    • Synchronization-check system. w/help from Ed Jastrzembski
      • Cameron working on.
    • Clean up cabling, labels, fasteners - First need to examine all signals
      • CH crate has a preliminary cleanup and Caryn is checking signals
    • Clean up CRL -- eliminate so-called "dirty trick"
      • ??
    • Check the 7200 scaler setup at injector, find a spare 7200.
      • Talked to Bob related to timing. Event counters
    • Pedestal studies, aka cross-talk
      • Tao will look into it soon.
    • Green Monster rework: Adam.
      • AZ: having a separate issue from bmw.
    • automatic production of run-dependent database
      • SP: working on firewall issues. The DB is already backfilled and we have scripts ready.
    • alarms like end-of-run voice
      • later
    • e-logbook entries
      • later
    • Document everything. Circuit diagrams, cable map, "how to".

Present

Bob M, Devi A, Kent P, Tao Y, Paul K, Sakib R, Ye T, Ciprian G, Sakib R, Cameron C,Robert R, Sanghwa P

Excused