Difference between revisions of "20190501-Analyzer-Mtg"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) |
Ciprian Gal (talk | contribs) |
||
Line 13: | Line 13: | ||
== Agenda == | == Agenda == | ||
− | + | === Analyzer code updates === | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
# Recent branch activity & pull requests | # Recent branch activity & pull requests | ||
#* | #* | ||
Line 32: | Line 24: | ||
#** | #** | ||
#* Decoding and BMOD tree extraction | #* Decoding and BMOD tree extraction | ||
+ | #** | ||
+ | |||
+ | === Hardware/DAQ tasklist === | ||
# VQWK adcs | # VQWK adcs | ||
#* One last module is ready to be tested | #* One last module is ready to be tested | ||
# EPICS run-start and fast logger (and EPICS decoder to slow tree) | # EPICS run-start and fast logger (and EPICS decoder to slow tree) | ||
+ | #* | ||
+ | # Timing: mostly understood, still small mysteries (LNE) | ||
+ | #* Current plan is to work on this early next week (Apr29) | ||
+ | # Synchronization-check system. w/help from Ed Jastrzembski | ||
+ | #* | ||
+ | # Clean up cabling, labels, fasteners - First need to examine all signals | ||
+ | #* | ||
+ | # Clean up CRL -- eliminate so-called "dirty trick" | ||
+ | #* | ||
+ | # Check the 7200 scaler setup at injector, find a spare 7200. | ||
+ | #* | ||
+ | # Pedestal studies, aka cross-talk | ||
+ | #* | ||
+ | # Green Monster rework: Adam. | ||
+ | #* | ||
+ | # automatic production of run-dependent database | ||
+ | #* | ||
+ | # alarms like end-of-run voice | ||
+ | #* later | ||
+ | # e-logbook entries | ||
+ | #* later | ||
+ | # Document everything. Circuit diagrams, cable map, "how to". | ||
+ | #* | ||
+ | === ReSpin of APEX runs === | ||
+ | [https://docs.google.com/spreadsheets/d/1lPRPk-IzzBdXKH4nujMcFYRrRwcvfKOMtl-omLCYO7M/edit?usp=sharing runlist] | ||
+ | #* What output do we have? | ||
+ | #** | ||
+ | #* Agregator | ||
+ | #** | ||
+ | #* Pair tree plots? | ||
+ | #* | ||
+ | # "Operations" branch | ||
#* | #* | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Present == | == Present == |
Revision as of 10:14, 1 May 2019
Back to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC L210A (entrance is in the lobby across from the 2nd floor auditorium entrance)
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 419 045 306 Bluejeans link: https://bluejeans.com/419045306
Agenda
Analyzer code updates
- Recent branch activity & pull requests
- regression analysis
- feedback
- Beam modulation
- Updates to the bmwClient
- Decoding and BMOD tree extraction
- Updates to the bmwClient
Hardware/DAQ tasklist
- VQWK adcs
- One last module is ready to be tested
- EPICS run-start and fast logger (and EPICS decoder to slow tree)
- Timing: mostly understood, still small mysteries (LNE)
- Current plan is to work on this early next week (Apr29)
- Synchronization-check system. w/help from Ed Jastrzembski
- Clean up cabling, labels, fasteners - First need to examine all signals
- Clean up CRL -- eliminate so-called "dirty trick"
- Check the 7200 scaler setup at injector, find a spare 7200.
- Pedestal studies, aka cross-talk
- Green Monster rework: Adam.
- automatic production of run-dependent database
- alarms like end-of-run voice
- later
- e-logbook entries
- later
- Document everything. Circuit diagrams, cable map, "how to".
ReSpin of APEX runs
- What output do we have?
- Agregator
- Pair tree plots?
- What output do we have?
- "Operations" branch