Difference between revisions of "GEM Meeting/20190510"
From PREX Wiki
Jump to navigationJump to searchChandabindu (talk | contribs) |
Chandabindu (talk | contribs) |
||
Line 13: | Line 13: | ||
==Minutes== | ==Minutes== | ||
*Dustin: The frame for main detector is ready to go. But cann't put anything there unless the UVa GEM is ready. | *Dustin: The frame for main detector is ready to go. But cann't put anything there unless the UVa GEM is ready. | ||
− | *Chandan: Devi is working | + | *Chandan: Devi is working on S3 mount design. |
*Dustin: We need Z-position and transverse positions of the AT detectors. | *Dustin: We need Z-position and transverse positions of the AT detectors. | ||
− | **Seamus: Ryan is supposed to give those | + | **Seamus: Ryan is supposed to give those dimensions. |
*Dustin: By next weekend, we expect to be ready with RHRS. | *Dustin: By next weekend, we expect to be ready with RHRS. | ||
*Chandan: The was good progress on counting DAQ work. | *Chandan: The was good progress on counting DAQ work. |
Revision as of 22:38, 10 May 2019
Back to Main Page >> GEM_Meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 998 903 0149 Bluejeans link: https://bluejeans.com/9989030149
Agenda
Minutes
- Dustin: The frame for main detector is ready to go. But cann't put anything there unless the UVa GEM is ready.
- Chandan: Devi is working on S3 mount design.
- Dustin: We need Z-position and transverse positions of the AT detectors.
- Seamus: Ryan is supposed to give those dimensions.
- Dustin: By next weekend, we expect to be ready with RHRS.
- Chandan: The was good progress on counting DAQ work.
- Chandan: We will plan to take cosmic data using VDC in the weekend.
- Siyu: One GEM detector is already moved inside the Hall. Working on cable mounting. The detector will be mounted on hut on Monday.
Present
Dustin, Seamus, Chandan, Ryan, Siyu, Ye Tian