Difference between revisions of "User talk:Jixie Zhang"

From PREX Wiki
Jump to navigationJump to search
Line 64: Line 64:
 
     <td>
 
     <td>
 
           Beam-Induced Linearity Studies   
 
           Beam-Induced Linearity Studies   
 
+
          Transverse Polarization Measurements.
 
     </td>
 
     </td>
 
     <td>
 
     <td>
           2 hours       
+
           8 hours       
 
     </td>
 
     </td>
 
     <td>
 
     <td>
         K. Kumar, K. Paschke, R. Silwal 
+
         Setup: J. Grames 
  
 
     </td>
 
     </td>
Line 150: Line 150:
 
   <tr>
 
   <tr>
 
     <td>
 
     <td>
           Transverse Polarization Running    
+
           Beam-Induced Linearity Studies    
 
     </td>
 
     </td>
 
     <td>
 
     <td>
           8 hours     
+
           2 hours     
 
     </td>
 
     </td>
 
     <td>
 
     <td>
         setup:  J. Grames    
+
         K. Kumar, K. Paschke, R. Silwal    
 
     </td>
 
     </td>
  
Line 212: Line 212:
 
Commnets:
 
Commnets:
 
KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".
 
KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".
 +
----
 +
Bob edited the above table per KK's request
 
----
 
----
 
By Joe Grames:  
 
By Joe Grames:  

Revision as of 10:40, 11 June 2010

PREx TODO List:


The following tables show the auxiliary measurements for the remainder of PREx.
This will be discussed at the June 11 (Friday) 3 pm meeting -- both the list of plans and the priorities.

The plans belong to 3 categories of priority:

  • Plans we MUST perform.
  • Plans we'd LIKE to perform, but lower priority.
  • Plans we MAYBE want to do (very low priority).
"MUST DO" Plans
            Plan      
          Duration     
            Personnel      
         Blinded Tube Test   
        4 hours (access)  
        D. McNulty, K. Kumar, J. Wexler    
         Further Current Calibrations with PREx Det   
          2 hours     
           Z. Ahmed    
         Beam-Induced Linearity Studies   
         Transverse Polarization Measurements.
          8 hours      
        Setup: J. Grames  
         High Statistics Lead Inelastics    
          3 hours   
           R. Michaels    

"LIKE TO DO" Plans.
            Plan      
          Duration     
            Personnel      
           Oversampling by 2 at 120 Hz    
          few days     
           setup by experts    
           Q2 with GEMs    
          6 hours     
        S. Riordan, A. Camsonne, K. Saenboonruang   
         Backgrounds:   Dipole Scan,   up and down   
          6 hours     
           D. McNulty    
          Beam-Induced Linearity Studies   
          2 hours    
        K. Kumar, K. Paschke, R. Silwal    

MAYBE Plans. Rather low priority.
            Plan      
          Duration     
            Personnel      
       Further 10 nA Cavity Monitor Tests  
          4 hours  
           Z. Ahmed, R. Michaels    
             More Moller Commissioning    
          12 hours
         Moller crew   (note Sasha is leaving town)    

Commnets: KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".


Bob edited the above table per KK's request


By Joe Grames: Hi Bob,

Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.

Most importantly give the PD some advance warning.