Difference between revisions of "PreviousRunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 980: | Line 980: | ||
| | | | ||
* Pass change 3 -> 5 for Hall B until ~1:00PM | * Pass change 3 -> 5 for Hall B until ~1:00PM | ||
+ | * Compton vacuum, LHRS dipole UPS re- | ||
+ | | Monday 3 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Monday 3 May | ||
+ | | Day | ||
+ | | | ||
+ | * Hall B Pass change 3 -> 5 until ~1:00PM | ||
* Compton vacuum, LHRS dipole UPS replacement during the down | * Compton vacuum, LHRS dipole UPS replacement during the down | ||
+ | * Bake compton chicane overnight during production, run beam straight through | ||
* Return to PbD #2 production | * Return to PbD #2 production | ||
+ | * Large asymmetry run (Jon) | ||
| | | | ||
+ | * | ||
+ | * Baking started, HRS work completed by Heidi | ||
|- | |- | ||
| Monday 3 May | | Monday 3 May | ||
Line 999: | Line 1,014: | ||
| Day | | Day | ||
| | | | ||
− | * | + | * Work on switch for Pockels cell (start 9:00AM) |
− | + | * Complete Compton beam line bake-out, leak check, cavity alignment | |
− | * | ||
| | | | ||
+ | * Pockels cell switch work complete | ||
+ | * Compton vacuum reopened | ||
|- | |- | ||
| Tuesday 4 May | | Tuesday 4 May | ||
Line 1,008: | Line 1,024: | ||
| | | | ||
* Production | * Production | ||
− | | | + | | |
+ | * Continued Compton realignment/laser polarization measurement | ||
+ | |- | ||
+ | | Wednesday 5 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | * Stopped work on Compton - still not complete | ||
+ | * Changed beam spot size to 200x200um | ||
+ | |- | ||
+ | | Wednesday 5 May | ||
+ | | Day | ||
+ | | | ||
+ | * 12 hours Moller tests, start 9:00AM (Sasha, Jixie) | ||
+ | | | ||
+ | |- | ||
+ | | Wednesday 5 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Finish Moller tests, 21:00 | ||
+ | * Raster clock tests 22:00-24:00 (KK, Bob, Jon) | ||
+ | * Production as per raster clock tests | ||
+ | | | ||
+ | |- | ||
+ | | Thursday 6 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
|- | |- | ||
+ | | Thursday 6 May | ||
+ | | Day | ||
+ | | | ||
+ | * Beam Studies (8 hours controlled access starting 08:15) | ||
+ | ** Finish Compton cavity work (Sirish, Abdurahim) | ||
+ | ** Start Compton pumping, replace leaky upstream valve? (John Heckman et al) | ||
+ | ** Remove GEM(s)?? (Alex, Kiad) | ||
+ | ** Compton Boron installation (Megan) | ||
+ | | | ||
+ | * Continued compton cavity alignment | ||
+ | * Boron installed | ||
+ | * INFN GEMs removed to EEL, (additional UVA GEM installed? | ||
+ | |- | ||
+ | | Thursday 6 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Raster clock tests | ||
+ | * Production | ||
+ | | | ||
+ | * CHL trip | ||
+ | |- | ||
+ | | Friday 7 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Raster clock tests (cont?) | ||
+ | * Production | ||
+ | | | ||
+ | * Tests aborted due to network switch failure in the hall | ||
+ | |- | ||
+ | | Friday 7 May | ||
+ | | Day | ||
+ | | | ||
+ | * Production | ||
+ | * Wien flip, QE scan, spot move (nominally 9:00AM) | ||
+ | | | ||
+ | * Wien flip, QE scan, spot move completed. | ||
+ | * Compton valve work continued until 2:00 | ||
+ | * Started detector alignment checks | ||
+ | * Q<sup>2</sup> and establish low-current cavities (Dustin) | ||
+ | |- | ||
+ | | Friday 7 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Tests by KK et al | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 8 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 8 May | ||
+ | | Day | ||
+ | | | ||
+ | * Production | ||
+ | * 2:00PM - Turn off cavity baking | ||
+ | * 3:00PM - Leak check, turn on ion pumps | ||
+ | * 4:00PM - Routine Moller Measurement | ||
+ | | | ||
+ | * Compton vacuum reestablished | ||
+ | * Replaced valve opens with sufficient vacuum levels | ||
+ | |- | ||
+ | | Saturday 8 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Moller | ||
+ | | | ||
+ | * Moller measurement gives 91% polarization | ||
+ | |- | ||
+ | | Sunday 9 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Sunday 9 May | ||
+ | | Day | ||
+ | | | ||
+ | * Compton ready? | ||
+ | * Production | ||
+ | | | ||
+ | * Cavity locks at 3kW! | ||
+ | * Valve upstream of chicane will not open | ||
+ | |- | ||
+ | | Sunday 9 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Monday 10 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | * Left dipole down | ||
+ | * Compton valve stuck | ||
+ | |- | ||
+ | | Monday 10 May | ||
+ | | Day | ||
+ | | | ||
+ | * Fix left dipole | ||
+ | * Fix Compton valve | ||
+ | * Fix target vacuum | ||
+ | | | ||
+ | * Left dipole down | ||
+ | * Compton valve fixed and tested | ||
+ | * Target vacuum bad | ||
+ | |- | ||
+ | | Monday 10 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Standby | ||
+ | * Empty or C target oversampling runs if valves can be opened | ||
+ | * 1-arm production if target vacuum < 5E-5 | ||
+ | | | ||
+ | * Left dipole down | ||
+ | * Target vacuum bad | ||
+ | |- | ||
+ | | Tuesday 11 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Standby | ||
+ | * Empty or C target oversampling runs if valves can be opened | ||
+ | * 1-arm production if target vacuum < 5E-5 | ||
+ | | | ||
+ | |- | ||
+ | | Tuesday 11 May | ||
+ | | Day | ||
+ | | | ||
+ | * Wien flip | ||
+ | * Beam studies -- injector studies | ||
+ | * Raster setup | ||
+ | * Fix left dipole | ||
+ | * Fix target vacuum | ||
+ | | | ||
+ | |- | ||
+ | | Tuesday 11 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Compton tune | ||
+ | * Oversampling tests | ||
+ | | | ||
+ | * Left dipole down | ||
+ | * Right dipole NMR down | ||
+ | * Target vacuum bad | ||
+ | |- | ||
+ | | Wednesday 12 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | * Left dipole down | ||
+ | * Right dipole NMR down | ||
+ | * Target vacuum bad | ||
+ | |- | ||
+ | | Wednesday 12 May | ||
+ | | Day | ||
+ | | | ||
+ | * Repair left dipole PS | ||
+ | * Repair right dipole NMR | ||
+ | * Repair right Q3 bad bit | ||
+ | | | ||
+ | * Target vacuum bad | ||
+ | |- | ||
+ | | Wednesday 12 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Standby | ||
+ | | | ||
+ | * Left dipole down | ||
+ | * Left Q3 controls problem | ||
+ | * Target vacuum bad | ||
+ | |- | ||
+ | | Thursday 13 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Standby | ||
+ | | | ||
+ | * Left dipole down | ||
+ | * Left Q3 controls problem | ||
+ | * Target vacuum bad | ||
+ | |- | ||
+ | | Thursday 13 May | ||
+ | | Day | ||
+ | | | ||
+ | * Repair left dipole PS | ||
+ | * Repair left Q3 controls | ||
+ | * Find and stop target vacuum leak | ||
+ | * Warm up target | ||
+ | | | ||
+ | |- | ||
+ | | Thursday 13 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Warm up target | ||
+ | | | ||
+ | |- | ||
+ | | Friday 14 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Pump down target | ||
+ | | | ||
+ | |- | ||
+ | | Friday 14 May | ||
+ | | Day | ||
+ | | | ||
+ | * Pump down target | ||
+ | | | ||
+ | |- | ||
+ | | Friday 14 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Cool target | ||
+ | * Re-establish beam | ||
+ | * Raster tests | ||
+ | | | ||
+ | * Target vacuum good | ||
+ | * Both spectrometers good | ||
+ | |- | ||
+ | | Saturday 15 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 15 May | ||
+ | | Day | ||
+ | | | ||
+ | * Access for left dipole regulation | ||
+ | | | ||
+ | * Left dipole regulation failed | ||
+ | * Target vacuum increase, then decrease with added heating | ||
+ | |- | ||
+ | | Saturday 15 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Access for left dipole regulation | ||
+ | * Re-establish beam | ||
+ | * Møller | ||
+ | | | ||
+ | * Left dipole regulation bad | ||
+ | * Target vacuum varying, mostly < 1e5 | ||
+ | |- | ||
+ | | Sunday 16 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Møller | ||
+ | | | ||
+ | * Left dipole regulation bad | ||
+ | * Target vacuum varying, mostly < 1e5 | ||
+ | |- | ||
+ | | Sunday 16 May | ||
+ | | Day | ||
+ | | | ||
+ | * Access for left dipole regulation | ||
+ | | | ||
+ | * Target vacuum varying, mostly < 1e5 | ||
+ | |- | ||
+ | | Sunday 16 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Production | ||
+ | * Background test (L PMTs on) | ||
+ | | | ||
+ | * Left dipole regulation bad | ||
+ | * Target vacuum varying, mostly < 1e5 | ||
+ | |- | ||
+ | | Monday 17 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Monday 17 May | ||
+ | | Day | ||
+ | | | ||
+ | * Controlled Access for Left Dipole fix | ||
+ | * Moller refilled | ||
+ | | | ||
+ | * Left dipole working for now | ||
+ | * Suspect bad silicon-controlled rectifier (SCR) | ||
+ | * There are 12 needed and only 6 spares | ||
+ | * Looking for spares and will work during beam studies Tue. | ||
+ | |- | ||
+ | | Monday 17 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Production with both arms! | ||
+ | | | ||
+ | |- | ||
+ | | Tuesday 18 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production (hopefully with both arms!) | ||
+ | | | ||
+ | * No Left Dipole issues all night | ||
+ | |- | ||
+ | | Tuesday 18 May | ||
+ | | Day | ||
+ | | | ||
+ | * Beam Studies, beginning 9am (8hrs) | ||
+ | * Wien Flip | ||
+ | * Maintenance on the Left Dipole Power supply | ||
+ | | | ||
+ | * Wien Flip completed before beam studies | ||
+ | * Beam studies completed | ||
+ | * Measurements performed on Left Dipole Power supply | ||
+ | |- | ||
+ | | Tuesday 18 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Production | ||
+ | * Oversample tests (Rupesh) | ||
+ | | | ||
+ | * Compton not done | ||
+ | * Oversample tests not done | ||
+ | |- | ||
+ | | Wednesday 19 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | * Oversample tests | ||
+ | | | ||
+ | * Oversample tests completed | ||
+ | |- | ||
+ | | Wednesday 19 May | ||
+ | | Day | ||
+ | | | ||
+ | * Compton Tuning (1-2hrs, start around 10am) | ||
+ | * Raster tests during 'target vacuum recovery' | ||
+ | * Production | ||
+ | | | ||
+ | * Injector tuning did not help Compton rates | ||
+ | * Jay and Yan are asking for advice | ||
+ | * Compton tuning during beam studies tomorrow | ||
+ | |- | ||
+ | | Wednesday 19 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Production | ||
+ | * Q2 and detector alignment (2-3hrs, around 8pm) | ||
+ | | | ||
+ | * short Q2 measurement | ||
+ | * Target vacuum tripped valves closed -> no beam | ||
+ | |- | ||
+ | | Thursday 20 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | * No beam - target operator only | ||
+ | |- | ||
+ | | Thursday 20 May | ||
+ | | Day | ||
+ | | | ||
+ | * Beam Studies (start at 8:30am, afternoon for Compton tuning) | ||
+ | * Some measurements on left dipole power supply by Jack in Hall | ||
+ | * Production | ||
+ | | | ||
+ | * Compton tuning needs to be rescheduled | ||
+ | * Jack did some work in hall | ||
+ | |- | ||
+ | | Thursday 20 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Canceled | ||
+ | | We lost the target vacuum. Will need to warm up target and replace O-ring after letting radiation subside. Plan to replace O-ring on Monday May 24. | ||
+ | |- | ||
+ | | Friday 21 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Friday 21 May | ||
+ | | Day | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Friday 21 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 22 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 22 May | ||
+ | | Day | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 22 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Sunday 23 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Sunday 23 May | ||
+ | | Day | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Sunday 23 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Monday 24 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Monday 24 May | ||
+ | | Day | ||
+ | | | ||
+ | * Various tests | ||
+ | **Pedestal runs | ||
+ | **linearity studies | ||
+ | **detector time constant tests | ||
+ | **GEM studies | ||
+ | * Target repairs - replace o-ring with silicon one temporarily | ||
+ | * Keep target warm and pump down | ||
+ | * Leak check | ||
+ | | | ||
+ | |- | ||
+ | | Monday 24 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Pedestal runs | ||
+ | | | ||
+ | |- | ||
+ | | Tuesday 25 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Tuesday 25 May | ||
+ | | Day | ||
+ | | | ||
+ | * Beam Studies (until between 10am and noon) | ||
+ | * Pedestal runs | ||
+ | |Kalres O-ring installed ahead of schedule. Pumping down. | ||
+ | |- | ||
+ | | Tuesday 25 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Pedestal runs | ||
+ | | | ||
+ | |- | ||
+ | | Wednesday 26 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Wednesday 26 May | ||
+ | | Day | ||
+ | | | ||
+ | * Accelerator Vacuum Group in Hall for Leak checks | ||
+ | * Switch box arrived for activate remotely the heating and cooling of thetarget | ||
+ | | | ||
+ | * Found a leak, but pressure stable at 675 mtor | ||
+ | * Electrician will install the appropriate outlet; R. Michaels is working on the remote control. | ||
+ | |- | ||
+ | | Wednesday 26 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Thursday 27 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Thursday 27 May | ||
+ | | Day | ||
+ | | | ||
+ | * Accelerator Vacuum Group in Hall for Leak checks | ||
+ | | | ||
+ | |- | ||
+ | | Thursday 27 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Friday 28 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Friday 28 May | ||
+ | | Day | ||
+ | | | ||
+ | * Shift workers on Standby | ||
+ | * Accelerator Vacuum Group in Hall for Leak checks | ||
+ | | | ||
+ | |- | ||
+ | | Friday 28 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 29 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 29 May | ||
+ | | Day | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 29 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Sunday 30 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Sunday 30 May | ||
+ | | Day | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Sunday 30 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Monday 31 May | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Monday 31 May | ||
+ | | Day | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Monday 31 May | ||
+ | | Swing | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Tuesday 1 June | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Tuesday 1 June | ||
+ | | Day | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Tuesday 1 June | ||
+ | | Swing | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Wednesday 2 June | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Wednesday 2 June | ||
+ | | Day | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Wednesday 2 June | ||
+ | | Swing | ||
+ | | | ||
+ | * canceled | ||
+ | | | ||
+ | |- | ||
+ | | Thursday 3 June | ||
+ | | Owl | ||
+ | | | ||
+ | * Canceled | ||
+ | | | ||
+ | |- | ||
+ | | Thursday 3 June | ||
+ | | Day | ||
+ | | | ||
+ | * Cooling down target (more likely to start on Swing) | ||
+ | * Day shift on standby. | ||
+ | | | ||
+ | |- | ||
+ | | Thursday 3 June | ||
+ | | Swing | ||
+ | | | ||
+ | * Swing shift workers are needed. | ||
+ | **PREX detector in counting mode | ||
+ | ** resume beam in Compton chicane ( MCC ) | ||
+ | ** harp scan for beam profile and beam position ( Shift crew - MCC ) | ||
+ | ** raster check ( Shift crew ) | ||
+ | ** Long down target recovery procedure ( Shift crew ) | ||
+ | * Alignment checks, Q2 ( Dustin Mc Nulty ). | ||
+ | ** put sieve in | ||
+ | ** take alignement data | ||
+ | ** put sieve out | ||
+ | ** Q2 measurement | ||
+ | ** Ask for access to go to integrating mode ( Jon Wexler or Amhed Zafar ) and remove Sieve | ||
+ | * Restart Production | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Friday 4 June | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Friday 4 June | ||
+ | | Day | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Friday 4 June | ||
+ | | Swing | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 5 June | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 5 June | ||
+ | | Day | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Saturday 5 June | ||
+ | | Swing | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Sunday 6 June | ||
+ | | Owl | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Sunday 6 June | ||
+ | | Day | ||
+ | | | ||
+ | * Production | ||
+ | | | ||
+ | |- | ||
+ | | Sunday 6 June | ||
+ | | Swing | ||
+ | | | ||
+ | * Production | ||
|} | |} |
Revision as of 21:42, 14 June 2010
This has the previous daily run plans, i.e. prior to a cutoff date. The more recent run plans are found here: RunPlanDaily
Date (2010) | Shift | ---------- Activity (Responsible) ---------- | --- Status --- | |||
---|---|---|---|---|---|---|
03/19 | Day | pump down; Møller, Compton, septum install; Q2 repair Insert sieve. (Techs) |
done | |||
03/19 | Swing | Beam restore (B-team) | done | |||
03/20 | Owl |
also:
|
done
All at 1-2 µA.
"Usual" polarity | |||
03/20 | Day | Beam off & hall open 9:00 am Quads repair; Compton install; GEM install; signals debugging. Leave sieves in. (Techs) |
done | |||
03/20 | Swing |
|
done | |||
3/21 | Owl |
|
done but GEMs not ready | |||
3/21 | Day |
|
done | |||
3/21 | Swing |
|
done | |||
3/22 | Owl |
|
done | |||
3/22 | Day |
|
done | |||
3/22 | Swing |
|
done | |||
3/23 | Owl |
|
done | |||
3/23 | Day |
|
water cell removed, rest not finished | |||
3/23 | Swing |
|
done | |||
3/24 | Owl |
|
done | |||
3/24 | Day |
|
done | |||
3/24 | Swing |
|
done | |||
3/25 | Owl |
|
in progress | |||
3/25 | Day |
|
done | |||
3/25 | Swing |
|
postponed | |||
3/26 | Owl |
|
in progress | |||
3/26 | Day |
|
postponed | |||
3/26 | Swing |
|
partly done | |||
3/27 | Owl | no beam | ||||
3/27 | Day | no beam | ||||
3/27 | Swing |
|
done, high-current tests continue | |||
3/28 | Owl |
|
not finished | |||
3/28 | Day |
|
done | |||
3/28 | Swing |
|
done | |||
3/29 | Owl |
|
done | |||
3/29 | Day |
|
done | |||
3/29 | Swing |
|
done | |||
3/30 | Owl |
|
done | |||
3/30 | Day |
|
done, except linearity | |||
3/30 | Swing |
|
done | |||
3/31 | Owl |
|
done | |||
3/31 | Day |
|
done | |||
3/31 | Swing |
|
Moller was done | |||
4/1 | Owl |
|
done | |||
4/1 | Day |
|
done, successful | |||
4/1 | Swing |
|
done | |||
Friday 2 April | Owl |
|
partly done, needs more work | |||
Friday 2 April | Day |
|
done | |||
Friday 2 April | Swing |
|
done, but not Q2 | |||
Saturday 3 April | Owl |
|
done | |||
Saturday 3 April | Day |
|
done, but not yet in prod. | |||
Saturday 3 April | Swing |
|
done | |||
Sunday 4 April | Owl |
|
done | |||
Sunday 4 April | Day |
|
done | |||
Sunday 4 April | Swing |
|
done | |||
Monday 5 April | Owl |
|
done | |||
Monday 5 April | Day |
|
done | |||
Monday 5 April | Swing |
|
done | |||
Tuesday 6 April | Owl |
|
partly done | |||
Tuesday 6 April | Day |
|
postponed: vacuum problems | |||
Tuesday 6 April | Swing |
|
||||
Wednesday 7 April | Owl |
|
||||
Wednesday 7 April | Day |
|
Leak found at O-ring connection between target chamber and collimator box | |||
Wednesday 7 April | Swing |
|
||||
Thursday 8 April | Owl |
|
||||
Thursday 8 April | Day |
|
Target chamber open, found that the 4th foil in Optics target blown off | |||
Thursday 8 April | Swing |
|
||||
Friday 9 April | Owl |
|
||||
Friday 9 April | Day |
|
||||
Friday 9 April | Swing |
|
||||
Saturday 10 April | Owl |
|
||||
Saturday 10 April | Day |
|
||||
Saturday 10 April | Swing |
|
||||
Sunday 11 April | Owl |
|
||||
Sunday 11 April | Day |
|
||||
Sunday 11 April | Swing |
|
||||
Monday 12 April | Owl |
|
||||
Monday 12 April | Day |
|
||||
Monday 12 April | Swing |
|
||||
Tuesday 13 April | Owl |
|
||||
Tuesday 13 April | Day |
|
||||
Tuesday 13 April | Swing |
|
Tungsten collimator modified and installed. Target pump down started and initially successful. | |||
Wednesday 14 April | Owl |
|
Target pump down. | |||
Wednesday 14 April | Day |
|
Done. Vacuum good. Target cold. | |||
Wednesday 14 April | Swing |
|
||||
Thursday 15 April | Owl |
|
||||
Thursday 15 April | Day |
|
||||
Thursday 15 April | Swing |
If possible, depending on heat load test:
|
||||
Friday 16 April | Owl |
|
||||
Friday 16 April | Day |
|
||||
Friday 16 April | Swing |
|
||||
Saturday 17 April | Owl |
|
||||
Saturday 17 April | Day |
|
||||
Saturday 17 April | Swing |
|
||||
Sunday 18 April | Owl |
|
||||
Sunday 18 April | Day + Swing |
| ||||
Monday 19 April | Owl |
|
||||
Monday 19 April | Day |
|
||||
Monday 19 April | Swing |
|
||||
Tuesday 20 April | Owl |
|
||||
Tuesday 20 April | Day |
|
||||
Tuesday 20 April | Swing |
|
||||
Wednesday 21 April | Owl |
|
||||
Wednesday 21 April | Day |
|
||||
Wednesday 21 April | Swing |
|
||||
Thursday 22 April | Owl |
|
||||
Thursday 22 April | Day |
|
||||
Thursday 22 April | Swing |
|
||||
Friday 23 April | Owl |
|
||||
Friday 23 April | Day |
|
||||
Friday 23 April | Swing |
|
||||
Saturday 24 April | Owl |
|
||||
Saturday 24 April | Day |
|
||||
Saturday 24 April | Swing |
|
||||
Sunday 25 April | Owl |
|
||||
Sunday 25 April | Day |
|
done | |||
Sunday 25 April | Swing |
|
||||
Monday 26 April | Owl |
|
||||
Monday 26 April | Day |
|
Wien flip postponed until Tues | |||
Monday 26 April | Swing |
| ||||
Tuesday 27 April | Owl |
|
||||
Tuesday 27 April | Day |
|
Done | |||
Tuesday 27 April | Swing |
|
||||
Wednesday 28 April | Owl |
|
||||
Wednesday 28 April | Day |
|
||||
Wednesday 28 April | Swing |
|
||||
Thursday 29 April | Owl |
|
||||
Thursday 29 April | Day |
|
Access to repair target leak | |||
Thursday 29 April | Swing |
|
Could not close hall due to faulty fire suppression system | |||
Friday 30 April | Owl |
|
Could not close hall due to faulty fire suppression system | |||
Friday 30 April | Day |
|
||||
Friday 30 April | Swing |
|
||||
Friday 30 April | Owl |
|
||||
Saturday 1 May | Day |
|
||||
Saturday 1 May | Swing |
|
||||
Sunday 2 May | Owl |
|
||||
Sunday 2 May | Day |
|
||||
Sunday 2 May | Swing |
|
||||
Monday 3 May | Owl |
|
||||
Monday 3 May | Day |
|
Monday 3 May | Owl |
|
|
Monday 3 May | Day |
|
| |||
Monday 3 May | Swing |
|
||||
Tuesday 4 May | Owl |
|
||||
Tuesday 4 May | Day |
|
| |||
Tuesday 4 May | Swing |
|
| |||
Wednesday 5 May | Owl |
|
| |||
Wednesday 5 May | Day |
|
||||
Wednesday 5 May | Swing |
|
||||
Thursday 6 May | Owl |
|
||||
Thursday 6 May | Day |
|
| |||
Thursday 6 May | Swing |
|
| |||
Friday 7 May | Owl |
|
| |||
Friday 7 May | Day |
|
| |||
Friday 7 May | Swing |
|
||||
Saturday 8 May | Owl |
|
||||
Saturday 8 May | Day |
|
| |||
Saturday 8 May | Swing |
|
| |||
Sunday 9 May | Owl |
|
||||
Sunday 9 May | Day |
|
| |||
Sunday 9 May | Swing |
|
||||
Monday 10 May | Owl |
|
| |||
Monday 10 May | Day |
|
| |||
Monday 10 May | Swing |
|
| |||
Tuesday 11 May | Owl |
|
||||
Tuesday 11 May | Day |
|
||||
Tuesday 11 May | Swing |
|
| |||
Wednesday 12 May | Owl |
|
| |||
Wednesday 12 May | Day |
|
| |||
Wednesday 12 May | Swing |
|
| |||
Thursday 13 May | Owl |
|
| |||
Thursday 13 May | Day |
|
||||
Thursday 13 May | Swing |
|
||||
Friday 14 May | Owl |
|
||||
Friday 14 May | Day |
|
||||
Friday 14 May | Swing |
|
| |||
Saturday 15 May | Owl |
|
||||
Saturday 15 May | Day |
|
| |||
Saturday 15 May | Swing |
|
| |||
Sunday 16 May | Owl |
|
| |||
Sunday 16 May | Day |
|
| |||
Sunday 16 May | Swing |
|
| |||
Monday 17 May | Owl |
|
||||
Monday 17 May | Day |
|
| |||
Monday 17 May | Swing |
|
||||
Tuesday 18 May | Owl |
|
| |||
Tuesday 18 May | Day |
|
| |||
Tuesday 18 May | Swing |
|
| |||
Wednesday 19 May | Owl |
|
| |||
Wednesday 19 May | Day |
|
| |||
Wednesday 19 May | Swing |
|
| |||
Thursday 20 May | Owl |
|
| |||
Thursday 20 May | Day |
|
| |||
Thursday 20 May | Swing |
|
We lost the target vacuum. Will need to warm up target and replace O-ring after letting radiation subside. Plan to replace O-ring on Monday May 24. | |||
Friday 21 May | Owl |
|
||||
Friday 21 May | Day |
|
||||
Friday 21 May | Swing |
|
||||
Saturday 22 May | Owl |
|
||||
Saturday 22 May | Day |
|
||||
Saturday 22 May | Swing |
|
||||
Sunday 23 May | Owl |
|
||||
Sunday 23 May | Day |
|
||||
Sunday 23 May | Swing |
|
||||
Monday 24 May | Owl |
|
||||
Monday 24 May | Day |
|
||||
Monday 24 May | Swing |
|
||||
Tuesday 25 May | Owl |
|
||||
Tuesday 25 May | Day |
|
Kalres O-ring installed ahead of schedule. Pumping down. | |||
Tuesday 25 May | Swing |
|
||||
Wednesday 26 May | Owl |
|
||||
Wednesday 26 May | Day |
|
| |||
Wednesday 26 May | Swing |
|
||||
Thursday 27 May | Owl |
|
||||
Thursday 27 May | Day |
|
||||
Thursday 27 May | Swing |
|
||||
Friday 28 May | Owl |
|
||||
Friday 28 May | Day |
|
||||
Friday 28 May | Swing |
|
||||
Saturday 29 May | Owl |
|
||||
Saturday 29 May | Day |
|
||||
Saturday 29 May | Swing |
|
||||
Sunday 30 May | Owl |
|
||||
Sunday 30 May | Day |
|
||||
Sunday 30 May | Swing |
|
||||
Monday 31 May | Owl |
|
||||
Monday 31 May | Day |
|
||||
Monday 31 May | Swing |
|
||||
Tuesday 1 June | Owl |
|
||||
Tuesday 1 June | Day |
|
||||
Tuesday 1 June | Swing |
|
||||
Wednesday 2 June | Owl |
|
||||
Wednesday 2 June | Day |
|
||||
Wednesday 2 June | Swing |
|
||||
Thursday 3 June | Owl |
|
||||
Thursday 3 June | Day |
|
||||
Thursday 3 June | Swing |
|
||||
Friday 4 June | Owl |
|
||||
Friday 4 June | Day |
|
||||
Friday 4 June | Swing |
|
||||
Saturday 5 June | Owl |
|
||||
Saturday 5 June | Day |
|
||||
Saturday 5 June | Swing |
|
||||
Sunday 6 June | Owl |
|
||||
Sunday 6 June | Day |
|
||||
Sunday 6 June | Swing |
|