Difference between revisions of "WAC Notes July 25 2019"
From PREX Wiki
Jump to navigationJump to search (→Issues) |
|||
Line 21: | Line 21: | ||
=== Production Run List === | === Production Run List === | ||
− | Start [https://hallaweb.jlab.org/parity/prex/onlinePlots/slug/slug_list/ | + | Start [https://hallaweb.jlab.org/parity/prex/onlinePlots/slug/slug_list/slug13-Left/y_postPanPlots_slug13-Left.pdf Slug 13, IHWP OUT Flip Right, FFB on always] |
* Good - [https://hallaweb.jlab.org/parity/prex/onlinePlots/summary/2019-07-25/run####_000/run####_000_all.pdf ####] | * Good - [https://hallaweb.jlab.org/parity/prex/onlinePlots/summary/2019-07-25/run####_000/run####_000_all.pdf ####] | ||
Revision as of 20:27, 25 July 2019
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes << Instructions
WAC Notes July 24 2019 << >> WAC Notes July 26 2019
July 25 2019
Production Run List
Start Slug 13, IHWP OUT Flip Right, FFB on always
- Good - ####
Non-Production Runs and Bad Runs
Pedestal/Calibrations Updates
Issues
- There were many pedestal and event cut problems. From now on, when an event cut isn't absolutely necessary it should be removed - see japan source code for reference of cuts here
- The BCM appears to be falling apart. We are fixing it and running slug 12 on BCM DG DS in the meantime.
- BPM 4ec had intermittant problems (iocse10 has issues) and so we are regressing with 4e again. BPM 11X is ok and stays in regression.