Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 12: Line 12:
 
|-  
 
|-  
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 
! style="width:10%"|  Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
|-
 
| rowspan="3" | Thursday, July 25
 
|Owl
 
|production at 70uA
 
|
 
|-
 
| Day
 
|
 
# Planned:
 
#* production at 70uA
 
#* ~30 minutes for injector bias tests during Hall C gas work (Caryn)
 
# Unplanned:
 
#* Access to fix the BPMs/ move away from beamline (Francis)
 
#* Need to fix the BCMs (Musson)
 
| BPMs fixed, bias left on after study; analog BCM problem from Hall and not fixed; plan is to use digital BCMs with separate receivers
 
|-
 
| Swing
 
|
 
# [[Beam Recovery#Procedure for Long Beam Down|Beam recovery procedure ]]
 
# production at 70uA
 
|
 
|-
 
| rowspan="3" | Friday, July 26
 
|Owl
 
|production at 70uA
 
| deltaT on the collimator increased.  Water out temp exceeding our set limits
 
|-
 
| Day
 
|
 
# production at 70uA
 
# Brief access to swap the digital receiver when Musson and Co. ready
 
# Some beam tuning to look at reducing the trip rate (could that be related to the collimator temps?)
 
| receiver swapped; DO NOT MOVE THE TARGET!
 
|-
 
| Swing
 
|
 
# production at 70uA
 
# special spot run with VDCs (Kent)
 
# careful collimator temperature study (Kent)
 
|
 
|-
 
| rowspan="3" | Saturday, July 27
 
|Owl
 
|production at 70uA; DO NOT MOVE THE TARGET!
 
|
 
|-
 
| Day
 
|production at 70uA; DO NOT MOVE THE TARGET!
 
|
 
|-
 
| Swing
 
| production at 70uA; DO NOT MOVE THE TARGET!
 
|
 
 
|-
 
|-
 
| rowspan="3" | Sunday, July 28
 
| rowspan="3" | Sunday, July 28

Revision as of 11:50, 29 July 2019



PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Sunday, July 28 Owl production at 70uA; DO NOT MOVE THE TARGET!
Day
  1. production at 70uA; DO NOT MOVE THE TARGET!
  2. spot++ to assess the target
Swing production at 70uA; DO NOT MOVE THE TARGET!
Monday, July 29 Owl production at 70uA; DO NOT MOVE THE TARGET!
Day
  • low current running (expert driven, if approved)
    1. bandwidth study
    2. MOLLER test
Swing
  • low current running (expert driven)
    1. MOLLER test
Tuesday, July 30 Owl low current running beginning at 8am (if approved)
Day Target fix
Swing production at 70uA
Wednesday, July 31 Owl production at 70uA
Day production at 70uA
Swing production at 70uA

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting