Difference between revisions of "RunPlanDaily"
From PREX Wiki
Jump to navigationJump to searchLine 57: | Line 57: | ||
| Swing | | Swing | ||
| | | | ||
− | + | * Tests with no target | |
− | + | # collimator centering angles with tune beam | |
+ | # BCM calibrations | ||
+ | # BPM calibrations | ||
+ | # position feedback study | ||
| | | | ||
|- | |- |
Revision as of 20:57, 30 July 2019
PREX Main << Run Coordinator Tools
Current Daily Run Plans
The current day is indicated by a color.
Day, Date | Shift | Tasks (Responsible Party) | Status |
---|---|---|---|
Sunday, July 28 | Owl | production at 70uA; DO NOT MOVE THE TARGET! | |
Day |
|
||
Swing | production at 70uA; DO NOT MOVE THE TARGET! | ||
Monday, July 29 | Owl | production at 70uA; DO NOT MOVE THE TARGET! | |
Day |
|
||
Swing |
|
||
Tuesday, July 30 | Owl | low current running beginning at 8am (if approved) | |
Day | Target fix | ||
Swing |
|
||
Wednesday, July 31 | Owl | production at 70uA | |
Day | production at 70uA | ||
Swing | production at 70uA |
Instructions for RC
- Let the day shift know what to do while you attend the MCC meeting
- Copy the daily run plans for the previous week to the Run plan history
- Copy the Run Plan Template table to this page and change the dates
- Update the plan above (if necessary) after the MCC meeting