Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
Line 45: Line 45:
 
|-style="background: #FCF3CF;
 
|-style="background: #FCF3CF;
 
| Swing
 
| Swing
| production at 70uA
+
|
|  
 
 
# Detector alignment (low current)
 
# Detector alignment (low current)
 
#* Main detectors
 
#* Main detectors
 
#* AT detectors
 
#* AT detectors
 
# production at 70uA
 
# production at 70uA
 +
|
 
|-
 
|-
 
| rowspan="3" | Thursday, August 1
 
| rowspan="3" | Thursday, August 1

Revision as of 16:02, 31 July 2019



PREX Main << Run Coordinator Tools

Global Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Tuesday, July 30 Owl low current running beginning at 8am (if approved)
Day Target fix
Swing
  • Tests with no target
  1. collimator centering angles with tune beam
  2. BCM calibrations
  3. BPM calibrations
  4. position feedback study
Wednesday, July 31 Owl production at 70uA
Day
  1. HRS quad repairs
  2. target repairs
  3. Compton work
  4. BCM repair
Swing
  1. Detector alignment (low current)
    • Main detectors
    • AT detectors
  2. production at 70uA
Thursday, August 1 Owl production at 70uA
Day production at 70uA
Swing
Friday, August 2 Owl
Day
  1. Wien flip starting at 9am
  2. Production running at 70uA
Swing Production running at 70uA
Saturday, August 3 Owl Production running at 70uA
Day Production running at 70uA
Swing Production running at 70uA
Sunday, August 4 Owl Production running at 70uA
Day Production running at 70uA
Swing MOLLER starting at 8am
Monday, August 5 Owl Production running at 70uA
Day Production running at 70uA
Swing Production running at 70uA
Tuesday, August 6 Owl Production running at 70uA
Day Production running at 70uA
Swing Production running at 70uA
Wednesday, August 7 Owl Production running at 70uA
Day Production running at 70uA
Swing Production running at 70uA

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting