− | + | <font color="blue">Why is this titled "User talk: Jixie Zhang". In fact it is an </font><font color="red">AUXILIARY MEASUREMENT RUN PLAN from Prex-I.</font> | |
− | + | ---- | |
− | + | PREx TODO List: | |
− | + | ---- | |
+ | The following tables show the auxiliary measurements for the remainder of | ||
+ | [http://hallaweb.jlab.org/parity/prex PREx].<br> | ||
+ | <font color="magenta"> This will be discussed at the | ||
+ | June 11 (Friday) 3 pm meeting</font> -- both the list of plans and the priorities. | ||
+ | <p> | ||
+ | The plans belong to 3 categories of priority: | ||
+ | </p> | ||
+ | |||
+ | <ul> | ||
+ | <li> Plans we <font color="Red">MUST</font> perform. | ||
+ | </li><li> Plans we'd <font color="Red">LIKE</font> to perform, but lower priority. | ||
+ | </li><li> Plans we <font color="Red">MAYBE</font> want to do (very low priority). | ||
+ | </ul> | ||
+ | |||
+ | <table border="1" cellpadding="15"> | ||
+ | <caption><font color="Red"> "MUST DO" Plans</font></caption> | ||
+ | |||
+ | <tr> | ||
+ | <td><font color="Blue"> Plan </font></td> | ||
+ | <td><font color="Blue">Duration|Status</font></td> | ||
+ | <td><font color="Blue"> Personnel</font></td> | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Blinded Tube Test</td> | ||
+ | <td><b><font color="green"> done </font></b></td> | ||
+ | <td> D. McNulty, K. Kumar, J. Wexler</td> | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td> Further Current Calibrations with PREx Det</td> | ||
+ | <td> 2 hours</td> | ||
+ | <td> Z. Ahmed</td> | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Transverse Polarization Measurements.</td> | ||
+ | <td><b><font color="green"> done </font></b></td> | ||
+ | <td>Setup by J. Grames. </td> | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>High Statistics Lead Inelastics </td> | ||
+ | <td> <b><font color="green"> done </font></b></td> | ||
+ | <td>A. Camsonne </td> | ||
+ | </tr> | ||
+ | </table> | ||
+ | |||
+ | |||
+ | <table border="1" cellpadding="15"> | ||
+ | <caption> <font color="Red"> "LIKE TO DO" Plans. </font> </caption> | ||
+ | |||
+ | <tr> | ||
+ | <td><font color="Blue"> Plan </font> </td> | ||
+ | <td><font color="Blue">Duration|Status</font> </td> | ||
+ | <td><font color="Blue"> Personnel</font> </td> | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Oversampling by 2 at 120 Hz </td> | ||
+ | <td>few days </td> | ||
+ | <td>setup by experts </td> | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Q<sup>2</sup> with GEMs </td> | ||
+ | <td> <b><font color="green"> done </font></b></td> | ||
+ | <td> A. Camsonne, M.Friends </td> | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Backgrounds: Dipole Scan, up and down </td> | ||
+ | <td>6 hours, <b><font color="green"> Finish left arm,<br> right arm measurement is pending </font></b> </td> | ||
+ | <td>M. Dalton, Mindy</td> | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Beam-Induced Linearity Studies </td> | ||
+ | <td>2 hours </td> | ||
+ | <td>K. Kumar, K. Paschke, R. Silwal </td> | ||
+ | |||
+ | </tr> | ||
+ | </table> | ||
+ | |||
+ | |||
+ | <table border="1" cellpadding="15"> | ||
+ | <caption> <font color="Red"> MAYBE Plans. </font> Rather low priority.</caption> | ||
+ | |||
+ | <tr> | ||
+ | <td><font color="Blue"> Plan </font> </td> | ||
+ | <td><font color="Blue">Duration|Status</font> </td> | ||
+ | <td><font color="Blue"> Personnel</font> </td> | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>Further 10 nA Cavity Monitor Tests </td> | ||
+ | <td>4 hours </td> | ||
+ | <td>Z. Ahmed, R. Michaels </td> | ||
+ | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>calibration of the <br> cavities with the amplifier</td> | ||
+ | <td><b><font color="green">done</font></b> </td> | ||
+ | <td>Z. Ahmed </td> | ||
+ | |||
+ | <tr> | ||
+ | <td>More Moller Commissioning </td> | ||
+ | <td>12 hours</td> | ||
+ | <td>Moller crew (note Sasha is leaving town) </td> | ||
+ | </tr> | ||
+ | </table> | ||
+ | |||
+ | ---- | ||
+ | Commnets: | ||
+ | KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do". | ||
+ | ---- | ||
+ | Bob edited the above table per KK's request | ||
+ | ---- | ||
+ | By Joe Grames: | ||
+ | Hi Bob, | ||
+ | |||
+ | Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes. | ||
+ | |||
+ | Most importantly give the PD some advance warning. | ||
+ | ---- |
Latest revision as of 15:07, 8 August 2019
Why is this titled "User talk: Jixie Zhang". In fact it is an AUXILIARY MEASUREMENT RUN PLAN from Prex-I.
PREx TODO List:
The following tables show the auxiliary measurements for the remainder of
PREx.
This will be discussed at the
June 11 (Friday) 3 pm meeting -- both the list of plans and the priorities.
The plans belong to 3 categories of priority:
- Plans we MUST perform.
- Plans we'd LIKE to perform, but lower priority.
- Plans we MAYBE want to do (very low priority).
Plan | Duration|Status | Personnel |
Blinded Tube Test | done | D. McNulty, K. Kumar, J. Wexler |
Further Current Calibrations with PREx Det | 2 hours | Z. Ahmed |
Transverse Polarization Measurements. | done | Setup by J. Grames. |
High Statistics Lead Inelastics | done | A. Camsonne |
Plan | Duration|Status | Personnel |
Oversampling by 2 at 120 Hz | few days | setup by experts |
Q2 with GEMs | done | A. Camsonne, M.Friends |
Backgrounds: Dipole Scan, up and down | 6 hours, Finish left arm, right arm measurement is pending |
M. Dalton, Mindy |
Beam-Induced Linearity Studies | 2 hours | K. Kumar, K. Paschke, R. Silwal |
Plan | Duration|Status | Personnel |
Further 10 nA Cavity Monitor Tests | 4 hours | Z. Ahmed, R. Michaels |
calibration of the cavities with the amplifier |
done | Z. Ahmed |
More Moller Commissioning | 12 hours | Moller crew (note Sasha is leaving town) |
Commnets: KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".
Bob edited the above table per KK's request
By Joe Grames: Hi Bob,
Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.