<font color="blue">Why is this titled "User talk: Jixie Zhang".  In fact it is an </font><font color="red">AUXILIARY MEASUREMENT RUN PLAN from Prex-I.</font>
 +
----
 
PREx TODO List:
 
PREx TODO List:
 
----
 
----
Line 7: Line 9:
 
<p>
 
<p>
 
The plans belong to 3 categories of priority:
 
The plans belong to 3 categories of priority:
 +
</p>
  
</p><ul>
+
<ul>
<li> Plans we <font color="Red">MUST</font> perform.
+
<li> Plans we <font color="Red">MUST</font> perform.
</li><li> Plans we'd <font color="Red">LIKE</font> to perform, but lower priority.
+
</li><li> Plans we'd <font color="Red">LIKE</font> to perform, but lower priority.
</li><li> Plans we <font color="Red">MAYBE</font> want to do (very low priority).
+
</li><li> Plans we <font color="Red">MAYBE</font> want to do (very low priority).
 
+
</ul>
</li></ul>
 
  
 
<table border="1" cellpadding="15">
 
<table border="1" cellpadding="15">
  <caption>
+
<caption><font color="Red"> "MUST DO" Plans</font></caption>
    <font color="Red"> "MUST   DO"   Plans</font>
 
  </caption>
 
  
  <tr>
+
<tr>
    <td>
+
<td><font color="Blue"> Plan </font></td>
            <font color="Blue"> Plan </font>    
+
<td><font color="Blue">Duration|Status</font></td>
    </td>
+
<td><font color="Blue"> Personnel</font></td>
    <td>
+
</tr>
          <font color="Blue">Duration</font>    
 
  
    </td>
+
<tr>
    <td>
+
<td>Blinded Tube Test</td>
            <font color="Blue"> Personnel</font>    
+
<td><b><font color="green"> done </font></b></td>
    </td>
+
<td> D. McNulty, K. Kumar, J. Wexler</td>
  </tr>
+
</tr>
 +
 +
<tr>
 +
<td> Further Current Calibrations with PREx Det</td>
 +
<td> 2 hours</td>
 +
<td> Z. Ahmed</td>
 +
</tr>
  
 
+
<tr>
 +
<td>Transverse Polarization Measurements.</td>
 +
<td><b><font color="green"> done </font></b></td>
 +
<td>Setup by J. Grames. </td>
 +
</tr>
  
  <tr>
+
<tr>
    <td>
+
<td>High Statistics Lead Inelastics </td>
          Blinded Tube Test 
+
<td> <b><font color="green"> done </font></b></td>
    </td>
+
<td>A. Camsonne </td>
    <td>
+
</tr>
        4 hours (access) 
+
</table>
  
    </td>
 
    <td>
 
        D. McNulty, K. Kumar, J. Wexler   
 
    </td>
 
  </tr>
 
  <tr>
 
    <td>
 
  
          Further Current Calibrations with PREx Det 
+
<table border="1" cellpadding="15">
    </td>
+
<caption> <font color="Red"> "LIKE TO DO" Plans. </font> </caption>
    <td>
 
          2 hours   
 
    </td>
 
    <td>
 
 
 
            Z. Ahmed   
 
    </td>
 
  </tr>
 
  
  <tr>
+
<tr>
    <td>
+
<td><font color="Blue"> Plan </font> </td>
          Beam-Induced Linearity Studies 
+
<td><font color="Blue">Duration|Status</font> </td>
 +
<td><font color="Blue"> Personnel</font> </td>
 +
</tr>
 +
 +
<tr>
 +
<td>Oversampling by 2 at 120 Hz </td>
 +
<td>few days </td>
 +
<td>setup by experts </td>
 +
</tr>
  
    </td>
+
<tr>
    <td>
+
<td>Q<sup>2</sup> with GEMs </td>
          2 hours     
+
<td> <b><font color="green"> done </font></b></td>
    </td>
+
<td> A. Camsonne, M.Friends </td>
    <td>
+
</tr>
        K. Kumar, K. Paschke, R. Silwal 
 
  
    </td>
+
<tr>
  </tr>
+
<td>Backgrounds: Dipole Scan, up and down </td>
  <tr>
+
<td>6 hours, <b><font color="green"> Finish left arm,<br> right arm measurement is pending </font></b> </td>
    <td>
+
<td>M. Dalton, Mindy</td>
          High Statistics Lead Inelastics   
+
</tr>
    </td>
 
    <td>
 
          3 hours 
 
    </td>
 
    <td>
 
            R. Michaels   
 
    </td>
 
  
  </tr>
+
<tr>
 +
<td>Beam-Induced Linearity Studies </td>
 +
<td>2 hours </td>
 +
<td>K. Kumar, K. Paschke, R. Silwal </td>
  
 +
</tr>
 
</table>
 
</table>
<pre>
 
</pre>
 
<table border="1" cellpadding="15">
 
  <caption>
 
    <font color="Red"> "LIKE  TO  DO"  Plans.  </font>
 
  
  </caption>
 
  <tr>
 
    <td>
 
            <font color="Blue"> Plan </font>   
 
    </td>
 
    <td>
 
  
          <font color="Blue">Duration</font>   
 
    </td>
 
    <td>
 
            <font color="Blue"> Personnel</font>     
 
 
    </td>
 
  </tr>
 
 
 
  <tr>
 
    <td>
 
            Oversampling by 2 at 120 Hz   
 
    </td>
 
 
    <td>
 
          few days   
 
    </td>
 
    <td>
 
            setup by experts   
 
 
    </td>
 
  </tr>
 
  <tr>
 
    <td>
 
            Q<sup>2</sup> with GEMs   
 
 
    </td>
 
    <td>
 
          6 hours   
 
    </td>
 
    <td>
 
        S. Riordan, A. Camsonne, K. Saenboonruang 
 
 
    </td>
 
  </tr>
 
  <tr>
 
    <td>
 
          Backgrounds:  Dipole Scan,  up and down 
 
 
    </td>
 
    <td>
 
          6 hours   
 
    </td>
 
    <td>
 
            D. McNulty   
 
 
    </td>
 
  </tr>
 
  <tr>
 
    <td>
 
          Transverse Polarization Running 
 
    </td>
 
    <td>
 
          8 hours   
 
    </td>
 
    <td>
 
        setup:  J. Grames   
 
    </td>
 
 
  </tr>
 
 
</table>
 
<pre>
 
 
</pre>
 
 
<table border="1" cellpadding="15">
 
<table border="1" cellpadding="15">
  <caption>
+
<caption> <font color="Red"> MAYBE Plans. </font> Rather low priority.</caption>
    <font color="Red"> MAYBE   Plans. </font>   Rather low priority.
 
  </caption>
 
 
 
  <tr>
 
    <td>
 
            <font color="Blue"> Plan </font>   
 
    </td>
 
    <td>
 
          <font color="Blue">Duration</font>   
 
  
    </td>
+
<tr>
    <td>
+
<td><font color="Blue"> Plan </font> </td>
            <font color="Blue"> Personnel</font>    
+
<td><font color="Blue">Duration|Status</font> </td>
    </td>
+
<td><font color="Blue"> Personnel</font> </td>
  </tr>
+
</tr>
  
  <tr>
+
<tr>
    <td>
+
<td>Further 10 nA Cavity Monitor Tests </td>
        Further 10 nA Cavity Monitor Tests
+
<td>4 hours </td>
    </td>
+
<td>Z. Ahmed, R. Michaels </td>
    <td>
+
</tr>
          4 hours
 
    </td>
 
    <td>
 
            Z. Ahmed, R. Michaels  
 
    </td>
 
  </tr>
 
  <tr>
 
  
    <td>
+
<tr>
              More Moller Commissioning   
+
<td>calibration of the <br> cavities with the amplifier</td>
    </td>
+
<td><b><font color="green">done</font></b> </td>
    <td>
+
<td>Z. Ahmed </td>
          12 hours
 
    </td>
 
    <td>
 
          Moller crew  (note Sasha is leaving town)   
 
    </td>
 
  </tr>
 
  
 +
<tr>
 +
<td>More Moller Commissioning </td>
 +
<td>12 hours</td>
 +
<td>Moller crew (note Sasha is leaving town) </td>
 +
</tr>
 
</table>
 
</table>
  
Line 212: Line 118:
 
Commnets:
 
Commnets:
 
KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".
 
KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".
 +
----
 +
Bob edited the above table per KK's request
 
----
 
----
 
By Joe Grames:  
 
By Joe Grames:  
 
Hi Bob,
 
Hi Bob,
  
Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.
+
Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.
  
 
Most importantly give the PD some advance warning.
 
Most importantly give the PD some advance warning.
 
----
 
----

Latest revision as of 15:07, 8 August 2019

Why is this titled "User talk: Jixie Zhang". In fact it is an AUXILIARY MEASUREMENT RUN PLAN from Prex-I.


PREx TODO List:


The following tables show the auxiliary measurements for the remainder of PREx.
This will be discussed at the June 11 (Friday) 3 pm meeting -- both the list of plans and the priorities.

The plans belong to 3 categories of priority:

  • Plans we MUST perform.
  • Plans we'd LIKE to perform, but lower priority.
  • Plans we MAYBE want to do (very low priority).
"MUST DO" Plans
Plan Duration|Status Personnel
Blinded Tube Test done D. McNulty, K. Kumar, J. Wexler
Further Current Calibrations with PREx Det 2 hours Z. Ahmed
Transverse Polarization Measurements. done Setup by J. Grames.
High Statistics Lead Inelastics done A. Camsonne


"LIKE TO DO" Plans.
Plan Duration|Status Personnel
Oversampling by 2 at 120 Hz few days setup by experts
Q2 with GEMs done A. Camsonne, M.Friends
Backgrounds: Dipole Scan, up and down 6 hours, Finish left arm,
right arm measurement is pending
M. Dalton, Mindy
Beam-Induced Linearity Studies 2 hours K. Kumar, K. Paschke, R. Silwal


MAYBE Plans. Rather low priority.
Plan Duration|Status Personnel
Further 10 nA Cavity Monitor Tests 4 hours Z. Ahmed, R. Michaels
calibration of the
cavities with the amplifier
done Z. Ahmed
More Moller Commissioning 12 hours Moller crew (note Sasha is leaving town)

Commnets: KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".


Bob edited the above table per KK's request


By Joe Grames: Hi Bob,

Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.

Most importantly give the PD some advance warning.