Difference between revisions of "User talk:Jixie Zhang"
Jixie Zhang (talk | contribs) |
|||
(7 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
+ | <font color="blue">Why is this titled "User talk: Jixie Zhang". In fact it is an </font><font color="red">AUXILIARY MEASUREMENT RUN PLAN from Prex-I.</font> | ||
+ | ---- | ||
PREx TODO List: | PREx TODO List: | ||
---- | ---- | ||
Line 20: | Line 22: | ||
<tr> | <tr> | ||
<td><font color="Blue"> Plan </font></td> | <td><font color="Blue"> Plan </font></td> | ||
− | <td><font color="Blue">Duration</font></td> | + | <td><font color="Blue">Duration|Status</font></td> |
<td><font color="Blue"> Personnel</font></td> | <td><font color="Blue"> Personnel</font></td> | ||
</tr> | </tr> | ||
Line 26: | Line 28: | ||
<tr> | <tr> | ||
<td>Blinded Tube Test</td> | <td>Blinded Tube Test</td> | ||
− | <td> | + | <td><b><font color="green"> done </font></b></td> |
<td> D. McNulty, K. Kumar, J. Wexler</td> | <td> D. McNulty, K. Kumar, J. Wexler</td> | ||
</tr> | </tr> | ||
Line 38: | Line 40: | ||
<tr> | <tr> | ||
<td>Transverse Polarization Measurements.</td> | <td>Transverse Polarization Measurements.</td> | ||
− | <td> | + | <td><b><font color="green"> done </font></b></td> |
− | <td>Setup | + | <td>Setup by J. Grames. </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>High Statistics Lead Inelastics </td> | <td>High Statistics Lead Inelastics </td> | ||
− | <td> | + | <td> <b><font color="green"> done </font></b></td> |
− | <td> | + | <td>A. Camsonne </td> |
</tr> | </tr> | ||
</table> | </table> | ||
Line 55: | Line 57: | ||
<tr> | <tr> | ||
<td><font color="Blue"> Plan </font> </td> | <td><font color="Blue"> Plan </font> </td> | ||
− | <td><font color="Blue">Duration</font> </td> | + | <td><font color="Blue">Duration|Status</font> </td> |
<td><font color="Blue"> Personnel</font> </td> | <td><font color="Blue"> Personnel</font> </td> | ||
</tr> | </tr> | ||
Line 67: | Line 69: | ||
<tr> | <tr> | ||
<td>Q<sup>2</sup> with GEMs </td> | <td>Q<sup>2</sup> with GEMs </td> | ||
− | <td> | + | <td> <b><font color="green"> done </font></b></td> |
− | <td> | + | <td> A. Camsonne, M.Friends </td> |
</tr> | </tr> | ||
<tr> | <tr> | ||
<td>Backgrounds: Dipole Scan, up and down </td> | <td>Backgrounds: Dipole Scan, up and down </td> | ||
− | <td>6 hours </td> | + | <td>6 hours, <b><font color="green"> Finish left arm,<br> right arm measurement is pending </font></b> </td> |
− | <td> | + | <td>M. Dalton, Mindy</td> |
</tr> | </tr> | ||
Line 91: | Line 93: | ||
<tr> | <tr> | ||
<td><font color="Blue"> Plan </font> </td> | <td><font color="Blue"> Plan </font> </td> | ||
− | <td><font color="Blue">Duration</font> </td> | + | <td><font color="Blue">Duration|Status</font> </td> |
<td><font color="Blue"> Personnel</font> </td> | <td><font color="Blue"> Personnel</font> </td> | ||
</tr> | </tr> | ||
Line 100: | Line 102: | ||
<td>Z. Ahmed, R. Michaels </td> | <td>Z. Ahmed, R. Michaels </td> | ||
</tr> | </tr> | ||
+ | |||
+ | <tr> | ||
+ | <td>calibration of the <br> cavities with the amplifier</td> | ||
+ | <td><b><font color="green">done</font></b> </td> | ||
+ | <td>Z. Ahmed </td> | ||
<tr> | <tr> |
Latest revision as of 15:07, 8 August 2019
Why is this titled "User talk: Jixie Zhang". In fact it is an AUXILIARY MEASUREMENT RUN PLAN from Prex-I.
PREx TODO List:
The following tables show the auxiliary measurements for the remainder of
PREx.
This will be discussed at the
June 11 (Friday) 3 pm meeting -- both the list of plans and the priorities.
The plans belong to 3 categories of priority:
- Plans we MUST perform.
- Plans we'd LIKE to perform, but lower priority.
- Plans we MAYBE want to do (very low priority).
Plan | Duration|Status | Personnel |
Blinded Tube Test | done | D. McNulty, K. Kumar, J. Wexler |
Further Current Calibrations with PREx Det | 2 hours | Z. Ahmed |
Transverse Polarization Measurements. | done | Setup by J. Grames. |
High Statistics Lead Inelastics | done | A. Camsonne |
Plan | Duration|Status | Personnel |
Oversampling by 2 at 120 Hz | few days | setup by experts |
Q2 with GEMs | done | A. Camsonne, M.Friends |
Backgrounds: Dipole Scan, up and down | 6 hours, Finish left arm, right arm measurement is pending |
M. Dalton, Mindy |
Beam-Induced Linearity Studies | 2 hours | K. Kumar, K. Paschke, R. Silwal |
Plan | Duration|Status | Personnel |
Further 10 nA Cavity Monitor Tests | 4 hours | Z. Ahmed, R. Michaels |
calibration of the cavities with the amplifier |
done | Z. Ahmed |
More Moller Commissioning | 12 hours | Moller crew (note Sasha is leaving town) |
Commnets: KK suggested putting "Transverse running" into "must do" and "beam induced linearity studies" into "like to do".
Bob edited the above table per KK's request
By Joe Grames: Hi Bob,
Wrt "Transverse Polarization Running" the spin rotator knobs of the INJTWF make this now rather simple. If your tolerance is <5 deg of vertical this can be done without Mott measurements and setup time is <30 minutes. If your tolerance is <2 degrees then Mott measurements are required and setup time is <2 hours. Backout of either to the original condition is likely <30 minutes.
Most importantly give the PD some advance warning.