Difference between revisions of "20191111-Analyzer-Mtg"
From PREX Wiki
Jump to navigationJump to searchm |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Back to [[Main_Page|Main Page]] >> [[Analyzer_Meeting]] | Back to [[Main_Page|Main Page]] >> [[Analyzer_Meeting]] | ||
− | [[20191021-Analyzer-Mtg|previous meeting]] << >> [[ | + | [[20191021-Analyzer-Mtg|previous meeting]] << >> [[20191118-Analyzer-Mtg|following meeting]] |
== Logistic information == | == Logistic information == | ||
Line 17: | Line 17: | ||
=== Analyzer code updates === | === Analyzer code updates === | ||
# Paul's work on analyzer updates had stalled last week | # Paul's work on analyzer updates had stalled last week | ||
+ | # Blinder: Change the hash and the blinding range for CREX | ||
=== Prompt analysis toolchain === | === Prompt analysis toolchain === | ||
Line 39: | Line 40: | ||
#** We will use the same set of normalizing BCM as we used during the run | #** We will use the same set of normalizing BCM as we used during the run | ||
#* Are we doing things to fix the analog BCM? | #* Are we doing things to fix the analog BCM? | ||
− | #** | + | #** Cameron was not able to see the BCM noise in the recent bench studies. |
#** The digitals have been split to be using both channels of each digital reciever | #** The digitals have been split to be using both channels of each digital reciever | ||
Latest revision as of 20:05, 17 November 2019
Back to Main Page >> Analyzer_Meeting
previous meeting << >> following meeting
Logistic information
Meeting room at JLab: CC F226
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 385 600 867 Bluejeans link: https://bluejeans.com/385600867
This meeting immediately follows the PREX2 Analysis meeting, which is dedicated to tasks directly related to the PREX-II analysis.
Agenda
Analyzer code updates
- Paul's work on analyzer updates had stalled last week
- Blinder: Change the hash and the blinding range for CREX
Prompt analysis toolchain
- WAC checking of parameter files, etc.
- Status on the farm
- Need to get added web space for plots
- Path to migration to japan
- We won't wait on the migration to start the PREX-2 respin
- Dithering analysis status & updates?
- Lagrange analysis
- Cameron was to have looked at connecting it into the dithering toolchain as an additional step.
- Other issues
Other issues
- Let's aim at getting everything ready for a respin
by October 23soon.- We should have some understanding about the pedestal changes before we start
- We also need to have the "blessed" set of dithering slopes for all production runs
- We will use the same set of normalizing BCM as we used during the run
- Are we doing things to fix the analog BCM?
- Cameron was not able to see the BCM noise in the recent bench studies.
- The digitals have been split to be using both channels of each digital reciever
- Let's aim at getting everything ready for a respin
Present
Tao, Dmitri, Devi, Ryan, Weibin, Paul K., Don
Phone: Cameron, Caryn, Ciprian, Kent, Sanghwa, Victoria, Robert, Ye Tian, Devika, Sakib