Difference between revisions of "Detailed Calibration plan"
From PREX Wiki
Jump to navigationJump to searchm |
|||
(12 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
+ | [[CREX_Detailed_Calibration_plan|CREX version]] | ||
== Beamline instrumentation calibration == | == Beamline instrumentation calibration == | ||
− | # Check the following has been performed | + | |
+ | # <font color="blue"> Check the following has been performed</font> | ||
#* 50uA-70uA beam current, through Compton (backgrounds on fingers and Compton photon detector) with no target | #* 50uA-70uA beam current, through Compton (backgrounds on fingers and Compton photon detector) with no target | ||
− | #* Establish 4x4 raster. Insert lead target. | + | #* Establish 4x4 raster. Insert lead target. (low current, ramp up. check collimator water, vary raster size 4x6?) |
− | #* Set Detector and SAM voltages (Dustin M) | + | #* Set Detector and SAM voltages (Dustin M) |
− | + | #<font color="blue"> Check Conditions OK</font> | |
− | # Check Conditions OK | ||
#*collimator water | #*collimator water | ||
#*thermocouple temperatures | #*thermocouple temperatures | ||
#*radiation monitors | #*radiation monitors | ||
#*ion chamber stability | #*ion chamber stability | ||
− | + | # <font color="blue"> Setup Locks (these are necessary for main detectors and SAM calibration)</font> | |
− | # Setup Locks (these are necessary for main detectors and SAM calibration) | ||
#*Slow Target Lock on 4A, 4E (jmenu->"slow locks"-> Orbit Locks Expanded View -> HallATGT) | #*Slow Target Lock on 4A, 4E (jmenu->"slow locks"-> Orbit Locks Expanded View -> HallATGT) | ||
#* Fast feedback for HallA on (iocse9) | #* Fast feedback for HallA on (iocse9) | ||
#* If beam is going through Compton, HallAComLock should probably be on | #* If beam is going through Compton, HallAComLock should probably be on | ||
#* Should HallAMolLock be on? | #* Should HallAMolLock be on? | ||
− | + | #<font color="blue">Coordinate</font> | |
− | # Coordinate | ||
#* Should Compton and Moller DAQ be running during calibration? | #* Should Compton and Moller DAQ be running during calibration? | ||
#* Dustin and Devi examining SAMs and Detectors with online analyzer during calibration | #* Dustin and Devi examining SAMs and Detectors with online analyzer during calibration | ||
#* Juan Carlos/Amali/Adam monitor Compton background rates and run the DAQ? | #* Juan Carlos/Amali/Adam monitor Compton background rates and run the DAQ? | ||
− | + | #* Ye puts Cavity BPMs in high current mode (opsl01 -> menubar->EDM->BPM->BPM Diagnostics DR(12GeV)->HallA BCMs B,C,D -> button -> Expert Controls -> HWReg button -> DACSL1 = 0x1 / 0x1 and DACSL2 = 0x1 / 0x1 -> back out to previous screen XVGA2 = 0 and YVGA2 =0 (for low current do 0x0 and VGA2=30). Do for all 3 BPM Cavs. | |
− | # Calibration Procedure A: with UNSER | + | # <font color="blue"> Calibration Procedure A: with UNSER</font> |
#*start at 70uA for 1min (scandata1==value in BCM0l02) | #*start at 70uA for 1min (scandata1==value in BCM0l02) | ||
#*beam off | #*beam off | ||
Line 32: | Line 31: | ||
#*wait for 5sec(for unser to equilibrate), take next data point for 1min | #*wait for 5sec(for unser to equilibrate), take next data point for 1min | ||
#*repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA | #*repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA | ||
− | + | # <font color="blue"> Calibration Procedure B: with pre-calibrated Hall BCM (analog upstream bcm)</font> | |
− | # Calibration Procedure B: with pre-calibrated Hall BCM (analog upstream bcm) | ||
#*start at 70uA for 1min (scandata1==value in BCM0l02) | #*start at 70uA for 1min (scandata1==value in BCM0l02) | ||
− | #change current to 75uA | + | #*change current to 75uA |
#*check slow target lock is in position | #*check slow target lock is in position | ||
#*check FFB on for HallA | #*check FFB on for HallA | ||
Line 41: | Line 39: | ||
#*take next 1min data point | #*take next 1min data point | ||
#*repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA | #*repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA | ||
− | + | # <font color="blue"> Calibration Procedure C: for BPMs (Compton bpms not yet calibrated)</font> | |
− | # Calibration Procedure C: for BPMs (Compton bpms not yet calibrated) | ||
#*at 70uA, set gains off for iocse9,iocse10 (Hall) iocse11,iocse12,iocse19,iocinse4 (Inj) | #*at 70uA, set gains off for iocse9,iocse10 (Hall) iocse11,iocse12,iocse19,iocinse4 (Inj) | ||
− | #* | + | #*perform Calibration Procedure B with pre-calibrated Hall BCM |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 13:18, 8 December 2019
Beamline instrumentation calibration
- Check the following has been performed
- 50uA-70uA beam current, through Compton (backgrounds on fingers and Compton photon detector) with no target
- Establish 4x4 raster. Insert lead target. (low current, ramp up. check collimator water, vary raster size 4x6?)
- Set Detector and SAM voltages (Dustin M)
- Check Conditions OK
- collimator water
- thermocouple temperatures
- radiation monitors
- ion chamber stability
- Setup Locks (these are necessary for main detectors and SAM calibration)
- Slow Target Lock on 4A, 4E (jmenu->"slow locks"-> Orbit Locks Expanded View -> HallATGT)
- Fast feedback for HallA on (iocse9)
- If beam is going through Compton, HallAComLock should probably be on
- Should HallAMolLock be on?
- Coordinate
- Should Compton and Moller DAQ be running during calibration?
- Dustin and Devi examining SAMs and Detectors with online analyzer during calibration
- Juan Carlos/Amali/Adam monitor Compton background rates and run the DAQ?
- Ye puts Cavity BPMs in high current mode (opsl01 -> menubar->EDM->BPM->BPM Diagnostics DR(12GeV)->HallA BCMs B,C,D -> button -> Expert Controls -> HWReg button -> DACSL1 = 0x1 / 0x1 and DACSL2 = 0x1 / 0x1 -> back out to previous screen XVGA2 = 0 and YVGA2 =0 (for low current do 0x0 and VGA2=30). Do for all 3 BPM Cavs.
- Calibration Procedure A: with UNSER
- start at 70uA for 1min (scandata1==value in BCM0l02)
- beam off
- wait for 5sec(for unser to equilibrate), take unser pedestal data point for 30sec (scandata1=0)
- beam on at 75uA
- check slow target lock is in position
- check FFB on for HallA
- check no bpms are saturated on iocse9
- wait for 5sec(for unser to equilibrate), take next data point for 1min
- repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA
- Calibration Procedure B: with pre-calibrated Hall BCM (analog upstream bcm)
- start at 70uA for 1min (scandata1==value in BCM0l02)
- change current to 75uA
- check slow target lock is in position
- check FFB on for HallA
- check no bpms are saturated on iocse9
- take next 1min data point
- repeat for 65uA,60uA,55uA,50uA,40uA,30uA,20uA,10uA
- Calibration Procedure C: for BPMs (Compton bpms not yet calibrated)
- at 70uA, set gains off for iocse9,iocse10 (Hall) iocse11,iocse12,iocse19,iocinse4 (Inj)
- perform Calibration Procedure B with pre-calibrated Hall BCM