Difference between revisions of "WAC Notes February 1 2020"

From PREX Wiki
Jump to navigationJump to search
Line 45: Line 45:
  
 
* https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit?usp=sharing
 
* https://docs.google.com/spreadsheets/d/1mt39fCuIW3Pr8TO7fzhtFjmMFt4Op30jMm5wMQke6Xo/edit?usp=sharing
 
BeamMod Commissioning calibration runs: 6076 - 6084
 
* Calibration - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6078_000 Run 6078]
 
* Calibration - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6079_000 Run 6079]
 
* Calibration - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run6080_000 Run 6080]
 
  
 
== Issues ==
 
== Issues ==

Revision as of 16:48, 1 February 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 31 2020 << >> WAC Notes February 2 2020

February 1 2020

Daily Meeting BlueJeans


Production Run List - Slug 122 - IHWP IN - Flip-RIGHT - Production

continue slug 122 on January 31:



Production Run List - Slug 123 - IHWP OUT - Flip-RIGHT - Production

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • There are some issues in the injector, resulting in large bcm asym in two runs (6086, 6087)
  • quite large bcm asym (324 ppm) in run 6099, don't know why. the asym in injector asym_bpm2i01WS is quite large: -8.67 compare to grand average value (< 5ppm)

Updates