Difference between revisions of "WAC Notes February 1 2020"

From PREX Wiki
Jump to navigationJump to search
Line 52: Line 52:
 
== Issues ==
 
== Issues ==
  
* There are some issues in the injector, resulting in large bcm asym in two runs (6086, 6087)
+
* Since run 6099, the bcm asym is quite large (>~ 300 ppm) due to large asym in injector
* quite large bcm asym (324 ppm) in run 6099, don't know why. the asym in injector asym_bpm2i01WS is quite large: -8.67 compare to grand average value (< 5ppm)
+
* LQ2 quenched at about 3:25 am, making run 6105 to 6110 right arm only
  
 
== Updates ==
 
== Updates ==

Revision as of 16:53, 1 February 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes January 31 2020 << >> WAC Notes February 2 2020

February 1 2020

Daily Meeting BlueJeans


Production Run List - Slug 122 - IHWP IN - Flip-RIGHT - Production

continue slug 122 on January 31:



Production Run List - Slug 123 - IHWP OUT - Flip-RIGHT - Production

start slug 123 at about 3:50 am

Non-Production Runs and Bad Runs

Pedestal/Calibrations Updates

Issues

  • Since run 6099, the bcm asym is quite large (>~ 300 ppm) due to large asym in injector
  • LQ2 quenched at about 3:25 am, making run 6105 to 6110 right arm only

Updates