Difference between revisions of "WAC Notes September 4 2020"

From PREX Wiki
Jump to navigationJump to search
 
(2 intermediate revisions by one other user not shown)
Line 33: Line 33:
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8222_000 Run 8222]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8222_000 Run 8222]
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8223_000 Run 8223] Beam current changed to 120
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8223_000 Run 8223] Beam current changed to 120
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8223_000 Run 8224]
+
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8224_000 Run 8224]
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==
8224-8231 moller measurement
+
* 8224-8231 moller measurement
  
 
== Issues ==
 
== Issues ==
  
 
== Updates ==
 
== Updates ==
 +
 +
[[Category:WAC]]

Latest revision as of 11:09, 4 November 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes September 3 2020 << >> WAC Notes September 5 2020

September 4 2020

Daily Meeting BlueJeans

Production Run List - Slug 212 - IHWP IN - Flip-RIGHT - Production

Production Run List - Slug 213 - IHWP OUT - Flip-RIGHT - Production

Non-Production Runs and Bad Runs

  • 8224-8231 moller measurement

Issues

Updates