=== Production Run List - Slug 214 - IHWP IN  - Flip-RIGHT - Production ===
 
=== Production Run List - Slug 214 - IHWP IN  - Flip-RIGHT - Production ===
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8238_000 Run 8238]
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8239_000 Run 8239]
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8240_000 Run 8240]
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8241_000 Run 8241]
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8242_000 Run 8242]
 +
 +
=== Production Run List - Slug 213 - IHWP OUT  - Flip-RIGHT - Production ===
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8243_000 Run 8243] short
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8244_000 Run 8244]
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8245_000 Run 8245]
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8246_000 Run 8246]
  
 
== Non-Production Runs and Bad Runs ==
 
== Non-Production Runs and Bad Runs ==
8231-8251 linac down
+
* 8231-8237 linac down
 +
* Bad - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8247_000 Run 8247] 0 beam current
 +
* 8248-8254 more downtime
  
 
== Issues ==
 
== Issues ==
the accelerator went down after the moller measurment
+
the accelerator went down after the moller measurement
  
 
== Updates ==
 
== Updates ==
 +
 +
[[Category:WAC]]

Latest revision as of 11:09, 4 November 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes September 4 2020 << >> WAC Notes September 6 2020

September 5 2020

Daily Meeting BlueJeans

Production Run List - Slug 213 - IHWP OUT - Flip-RIGHT - Production

Production Run List - Slug 214 - IHWP IN - Flip-RIGHT - Production

Production Run List - Slug 213 - IHWP OUT - Flip-RIGHT - Production

Non-Production Runs and Bad Runs

  • 8231-8237 linac down
  • Bad - Run 8247 0 beam current
  • 8248-8254 more downtime

Issues

the accelerator went down after the moller measurement

Updates