Difference between revisions of "WAC Notes September 18 2020"

From PREX Wiki
Jump to navigationJump to search
m
 
(One intermediate revision by the same user not shown)
Line 24: Line 24:
  
 
=== Production Run List - Slug 223 - IHWP OUT - Flip-RIGHT - Production ===
 
=== Production Run List - Slug 223 - IHWP OUT - Flip-RIGHT - Production ===
 +
* NeedCut - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8549_000 Run 8549]
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8550_000 Run 8550] - Current ramp, counts as good production
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8551_000 Run 8551] - Good
 +
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8552_000 Run 8552] - Needs cuts on 12X hair
 +
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8553_000 Run 8553] *Left S1, L1.3 HV off first 35min of run
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8553_000 Run 8553] *Left S1, L1.3 HV off first 35min of run
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8554_000 Run 8554] *increase current 130uA to 140uA 10min in
 
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8554_000 Run 8554] *increase current 130uA to 140uA 10min in
Line 38: Line 43:
  
 
== Updates ==
 
== Updates ==
 +
 +
[[Category:WAC]]

Latest revision as of 18:39, 10 December 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes September 17 2020 << >> WAC Notes September 25 2020

September 18 2020

Daily Meeting BlueJeans


Production Run List - Slug 223 - IHWP OUT - Flip-RIGHT - Production

Non-Production Runs and Bad Runs

  • 8559- production over.

Issues

8554-8556 : analog bcm double difference outliers

Updates