== PREX Run Plan for   Commissioning   and   Auxiliary Measurements ==
 
== PREX Run Plan for   Commissioning   and   Auxiliary Measurements ==
  
Updated: Jan 25, 2010 <br>
+
<font color="magenta">This was for the 2010 PREX-I run. </font> &nbsp; A run plan for PREX-II and C-REX is forthcoming.
  
See also the [[RunPlanDaily| Daily Run Plan]]
+
See also the [[RunPlanDaily| Daily Run Plan]] and [[PreviousRunPlanDaily| Earlier Daily Run Plan]]
  
This doesn't include regular Production running.  The experiment is approved for <font color="magenta">30 PAC days</font>; there are <font color="blue">2 weeks of "commissioning"</font> listed, and then an additional <font color="blue">61 days for production</font>. <br><br>
+
The experiment is approved for 30 PAC days; there are <font color="blue">2 weeks of "commissioning"</font> listed, and then an additional <font color="blue">61 days for production</font>. <br><br>
Below is a list of tasks in the approximate time order, with person(s) responsible, approximate amount of time required, and comments about the conditions or needs.  The time will, in most cases, be broken up into manageable chunks.  For example, the GEM commissioning will occur in about 4 periods of time, each 4 hours, separated by at least one day.
+
Below is a list of tasks in the approximate time order, with person(s) responsible, approximate amount of time required, and comments about the conditions or needs.  The time will, in most cases, be broken up into manageable chunks.  For example, the GEM commissioning will occur in about 4 periods of time, each 4 hours, separated by at least one day. After commissioning we go into a regular production mode; see the [http://hallaweb.jlab.org/parity/prex/runinfo/opmanual.html HOWTO] webpage for shift worker instructions for the 2010 run.
 +
 
 +
== Spillover from Beam Restore ==
  
 
<UL>
 
<UL>
<LI> <font color="blue">Basic Beam Setup</font> -- <font color="green">2 shifts</font> &nbsp; Jay Benesch, Bteam <br>
+
<LI> <font color="blue">Basic Beam Setup</font> -- <font color="green">1 shift</font> &nbsp; Jay Benesch, Bteam <br>
<LI> <font color="blue">Source and Parity Quality Beam</font> -- <font color="green">3 shifts</font> &nbsp; Kent Paschke, Mark Dalton, Rupesh Silwal <br>
+
<LI> <font color="blue">Source and Parity Quality Beam</font> -- <font color="green"> essentially done </font> &nbsp; Kent Paschke, Mark Dalton, Rupesh Silwal <br>
<LI> <font color="blue">Low-current cavities</font> -- <font color="green">1 shift</font> (day) &nbsp; John Musson, Zafar Ahmed
+
</UL>
 +
 
 +
== Low Current Checkout with Water Cell (2-3 calendar days) ==
 
<UL>
 
<UL>
<LI> Need before Optics and Q<sup>2</sup>
+
<LI> <font color="red">Septum checkout (Sieve IN)</font> -- <font color="green">1 shift</font>
<LI> Should be on Day shift
+
 
 +
<UL>
 +
<LI> <font color="green">Septum Commissioning (Priority activity)</font> -- &nbsp; Bob Michaels, John LeRose
 +
<UL>
 +
<LI> Verify septum does not steer beam
 +
<LI> Thin target, first VDC data at 1-2 uA
 
</UL>
 
</UL>
<LI> <font color="blue">Septum Commissioning</font> -- <font color="green">1 shift</font> &nbsp; Bob Michaels, John LeRose
+
<LI> <font color="blue">Low-current cavities</font> -- &nbsp; Bob Michaels  
 
<UL>
 
<UL>
<LI> Verify septum does not steer beam
+
<LI> Check hardware at 1-2 uA
<LI> Thin target, low-current checks
+
</UL>
 +
 
 +
<LI> <font color="blue">Target alignment check</font> -- &nbsp; Bob Michaels
 +
<UL>
 +
<LI> Check spot on BeO viewer
 +
<LI> Put in Ta or ultra-thin C12 target
 +
<LI> Scan few mm up-down, left-right, verify from rates we're not hitting a frame.
 +
</UL>
 +
<LI> <font color="blue">VDC Checkout</font> -- &nbsp; Dustin McNulty, Alexandre Camsonne, Bob Michaels
 +
<UL>
 +
<LI> Look for sieve holes; first check on optics
 +
</UL>
 +
 
 +
<LI> <font color="blue">Quartz detectors checkout</font> -- &nbsp; Dustin McNulty, Piotr Decowski, Jon Wexler
 +
<UL>
 +
<LI> Calibrate detector x-y movers in VDC coordinates
 +
</UL>
 +
<LI> <font color="blue">GEM checkout</font> -- &nbsp; Ole Hansen, Alexandre Camsonne, Nilanga Liyanage
 +
<UL>
 +
<LI> First look at noise, pulse-heights, tracks
 +
</UL>
 +
 
 +
</UL>
 +
<LI> <font color="red">Spectrometer checkout (Sieve OUT)</font> -- <font color="green">1 shift</font>
 +
 
 +
<UL>
 +
<LI> <font color="green">Low-current cavities (Priority activity)</font> -- &nbsp; John Musson, Zafar Ahmed
 +
<UL>
 +
<LI> Need before subsequent program, especially Optics and Q<sup>2</sup>
 +
</UL>
 +
 
 +
<LI> <font color="blue">VDC Checkout</font> -- &nbsp; Dustin McNulty, Alexandre Camsonne, Bob Michaels
 +
<UL>
 +
<LI> First spectra on specific thin targets
 +
<LI> Learn to measure rates to 10% and study rate dependence effects
 +
</UL>
 +
 
 +
<LI> <font color="blue">Quartz detectors checkout</font> -- &nbsp; Dustin McNulty, Piotr Decowski, Jon Wexler
 +
<UL>
 +
<LI> Detector pulse height spectra
 +
<LI> If possible, compare 6 and 10 mm blocks
 +
<LI> Map shadow of quartz (both primary and A_T hole) in VDCs
 +
</UL>
 +
<LI> <font color="blue">GEM checkout</font> -- &nbsp; Ole Hansen, Alexandre Camsonne, Nilanga Liyanage
 +
<UL>
 +
<LI> First attempt at GEM commissioning
 +
<LI> Identify Quartz detector shadows in GEM & VDC coordinates
 +
</UL>
 +
 
 +
</UL>
 +
<LI> <font color="red">A_T hole characterization</font> -- <font color="green">1 shift</font>
 +
<UL>
 +
<LI> <font color="green"> Determine placement of A_T detectors (Priority activity)</font> -- &nbsp; Bob Michaels, Dustin McNulty
 +
<UL>
 +
<LI> Characterize acceptance on thin targets with A_T hole blocked & unblocked
 +
<LI> Two or three accesses to block and unblock A_T hole
 +
</UL>
 +
<LI> <font color="blue">Parasitic GEM/Detector studies</font> -- &nbsp; GEM & Detector teams
 +
<UL>
 +
<LI> Accumulate statistics on detector pulse height
 +
<LI> Learn to measure rates to 10% with GEMs
 +
<LI> A_T hole alignment
 +
<LI> Place A_T hole detector such that rate is ~ 100 times less than main detector (with thick target)
 
</UL>
 
</UL>
<LI> <font color="blue">Main Detectors</font> -- <font color="green">3 shifts</font> &nbsp; Krishna Kumar, et.al.
+
 
<UL>
 
<LI> Detector alignment -- Dustin McNulty
 
<LI> Pulse-height spectra and resolution
 
 
</UL>
 
</UL>
<LI> <font color="blue">GEM Detectors</font> -- <font color="green">2 shifts</font> &nbsp; Ole Hansen, et.al.
+
<LI> <font color="red">Water Cell & Optics</font> -- <font color="green">2 shifts</font>
<LI> <font color="blue">Check A_T hole and detector</font> -- <font color="green">2 shifts</font> &nbsp; Bob Michaels
 
 
<UL>
 
<UL>
<LI> Needs to be done before high-current - radiation issue
+
<LI> <font color="green"> Absolute angle measurement (Priority activity)</font> -- &nbsp; Nilanga et al
<LI> Successive accesses to block and unblock the A_T hole
 
</UL>
 
<LI> <font color="blue">Water Cell and Optics of HRS+Septum</font> -- <font color="green">2 shifts</font> &nbsp; Nilanga Liyanage
 
 
<UL>
 
<UL>
 
<LI> Sieve Slit runs
 
<LI> Sieve Slit runs
 
<LI> Angle calibration
 
<LI> Angle calibration
<LI> Access to remove water cell; then cool the target -- Dave Meekins
 
 
</UL>
 
</UL>
<LI> <font color="blue">Double-Wien Spin Manipulator Commissioning</font> -- <font color="green">3 shifts</font> &nbsp; Joe Grames
+
 
 +
</UL>
 +
 
 +
</UL>
 +
 
 +
== Lead Target Checkout (1-2 calendar days) ==
 +
<UL>
 +
<LI> <font color="red">High Current Commissioning</font> -- <font color="green">1 shift</font>
 +
 
 +
<UL>
 +
<LI> <font color="green">Production target checkout (Priority activity)</font> -- &nbsp; Bob Michaels et al
 +
<UL>
 +
<LI> 100 uA on thick Lead, monitor radiation levels, establish luminosity limits
 +
</UL>
 +
<LI> <font color="blue">Electronics commissioning</font> -- &nbsp; KK, Luis, Paul et al
 +
<UL>
 +
<LI> Establish LUMI performance characteristics
 +
<LI> Detailed measurements of various oversampling configurations
 +
</UL>
 +
 
 +
</UL>
 +
<LI> <font color="red">Parity Commissioning</font> -- <font color="green">1 shift</font>
 +
 
 +
<UL>
 +
<LI> <font color="green">Parity Quality (Priority activity)</font> -- &nbsp; Kent, Rupesh, Luis, Dustin et al
 +
<UL>
 +
<LI> IA feedback, beam modulation ( low current modulation - dithering commissioning before CW )
 +
<LI> Evaluate LUMI regression performance
 +
</UL>
 +
<LI> <font color="blue">Beam monitor calibrations</font> -- &nbsp; Diancheng Wang, Xiaoyan Deng
 +
<UL>
 +
<LI> Bulls-eye scan, fixed gain BPM calibration, BCM calibration
 +
</UL>
 +
 
 +
</UL>
 +
<LI> <font color="red">Q<sup>2</sup> Measurement</font> -- <font color="green">1 shift</font>
 +
 
 +
<UL>
 +
<LI> <font color="green">Establish Q<sup>2</sup> measurement sequence (Priority activity)</font> -- &nbsp; Dustin, Nilanga et al
 +
<UL>
 +
<LI> Drift chamber rate measurement at a few nA
 +
<LI> parasitic GEM commissioning
 +
<LI> try to establish a rate in GEMs, especially in quartz shadow, at 10-100 nA
 +
</UL>
 +
<LI> <font color="blue">ARC energy measurement </font> -- &nbsp; Arun Saha
 +
 
 +
</UL>
 +
<LI> <font color="red">High Luminosity Detector Commissioning</font> -- <font color="green">1 shift</font>
 +
 
 +
<UL>
 +
<LI> <font color="green">Characterization of Integrating Detector response (Priority activity)</font> -- &nbsp; KK, Jon, Dustin et al
 +
<UL>
 +
<LI> Estimate detector rates & impact of A_T hole flux
 +
<LI> Evaluate primary detector and LUMI noise peformance
 +
<LI> Evaluate BPM performance; compare strip-line regression to cavity regression
 +
<LI> Establish empirical figure of merit for A_T hole detector
 +
</UL>
 +
<LI> <font color="blue">Final parasitic GEM commissioning</font> -- &nbsp; Ole, Nilanga et al
 +
<UL>
 +
<LI> Compare predicted and measured integrating width prediction at moderate current on thick target
 +
</UL>
 +
</UL>
 +
</UL>
 +
 
 +
== Polarimetry Beam Checkout (1 shift) ==
 +
<UL>
 +
<LI> <font color="red">Moller Beam Checkout</font> -- <font color="green">2 shifts</font>
 +
 
 +
<UL>
 +
<LI> <font color="green">Moller magnet alignment (Priority activity)</font> -- &nbsp; Moller team
 +
<UL>
 +
<LI> Verify Moller magnet does not steer beam
 +
</UL>
 +
<LI> <font color="blue">Parasitic Compton Checkout</font> -- &nbsp; Compton team
 +
<UL>
 +
<LI> Feedback to MCC on beam quality
 +
<LI> Simultaneous performance on Moller tune, compton background and sufficient raster
 +
</UL>
 +
<LI> <font color="blue">Access to remove water cell</font> --&nbsp; Dave Meekins
 +
<UL>
 +
<LI> begin cold target operation
 +
</UL>
 +
</UL>
 +
</UL>
 +
 
 +
== Polarimetry Checkout (4-5 calendar days) ==
 +
<UL>
 
<LI> <font color="blue">Compton Commissioning</font> -- <font color="green">8 shifts</font> &nbsp; Sirish Nanda, et.al.
 
<LI> <font color="blue">Compton Commissioning</font> -- <font color="green">8 shifts</font> &nbsp; Sirish Nanda, et.al.
 
<UL>
 
<UL>
Line 54: Line 203:
 
<LI> DAQ checkout -- 1 shift
 
<LI> DAQ checkout -- 1 shift
 
</UL>
 
</UL>
<LI> <font color="blue">Lead Target Commissioning</font> -- <font color="green">1 shift</font>
 
<UL>
 
<LI> Establish 100 uA on Lead/Diamond target
 
<LI> Measure radiation, establish luminosity limits
 
 
</UL>
 
</UL>
<LI> <font color="blue">Optimize helicity flip rate</font> -- <font color="green">1 shifts</font>  
+
== Establishing Production (2-3 calendar days) ==
 +
<UL>
 +
<LI> <font color="red">Production Checkout</font> -- <font color="green">2 shifts</font>
 +
<UL>
 +
<LI> Final detector alignment checks
 +
<LI> Final LUMI/noise/helicity flip rate checks
 +
<LI> Final beam modulation tweaks
 +
<LI> Quick check for gross non-linearities
 +
<LI> 4 hours longitudinal polarization production data
 +
</UL>
 +
 
 +
<LI> <font color="red">Transverse Polarization</font> -- <font color="green">4 shifts</font>
 
<UL>
 
<UL>
<LI> Lumi and oversampling studies
+
<LI> <font color="green">Double-Wien Spin Manipulator Commissioning</font> -- &nbsp; Joe Grames
<LI> 30, 120, and 240 Hz checkout
+
<LI> Spin dance
 +
<LI> 4 hours transverse vertical polarization production
 +
<LI> 2 shifts transverse horizontal polarization production
 
</UL>
 
</UL>
<LI> <font color="blue">Bulls-eye scan</font> -- <font color="green">1 shift</font>
+
 
<LI> <font color="blue">Fixed-Gain BPM Calibration</font> -- <font color="green">1 shift</font>
 
<LI> <font color="blue">BCM Calibration</font> -- <font color="green">1 shift</font> &nbsp; Diancheng Wang, Xioayan Deng
 
<LI> <font color="blue">Checkout of (New) Beam Modulation</font> -- <font color="green">2 shifts</font> &nbsp; Rupesh Silwal, Kent Paschke
 
<LI> <font color="blue">Commission Charge Asymmetry Feedback</font> -- <font color="green">4 hours</font> &nbsp; Luis Mercado, Rupesh Silwal
 
<LI> <font color="blue">ARC Energy Measurement</font> -- <font color="green">4 hours</font>
 
<LI> <font color="blue">Q<sup>2</sup> Measurement</font> -- <font color="green">1 shift</font> &nbsp; Dustin McNulty
 
<UL>
 
<LI> Low-current, using GEMs and/or VDCs
 
<LI> To be repeated periodically during experiment.
 
 
</UL>
 
</UL>
<LI> <font color="blue">Linearity Studies</font> -- <font color="green">1 shift</font> &nbsp; Rupesh Silwal, Kent Paschke
+
 
<LI> <font color="blue">Transverse Asymmetry</font> -- <font color="green">3 shifts</font>
+
<font color="red"> Total time: approx 15 days !</font> &nbsp; Based on this list, each day we will come up with an adjustment to the [[RunPlanDaily| Daily Run Plan]].  Some flexibility will be needed to accomodate problems and changes in plans.
 +
 
 +
== Important Activities after few days of production ==
 
<UL>
 
<UL>
<LI> Spin Dance -- 1 shift
+
<LI> <font color="blue">Linearity Studies</font> -- <font color="green">1 shift</font> &nbsp; Rupesh Silwal, Kent Paschke, Luis Mercado
<LI> Running with deliberately transverse polarization -- 2 shifts
 
</UL>  
 
 
<LI> <font color="blue">Background Studies</font> -- <font color="green">2 shifts</font>
 
<LI> <font color="blue">Background Studies</font> -- <font color="green">2 shifts</font>
 
<UL>
 
<UL>
Line 87: Line 236:
 
<LI> Thin C12 to measure diamond background
 
<LI> Thin C12 to measure diamond background
 
</UL>
 
</UL>
 +
<LI> Possible scan of Q1 to optimize acceptance and verify that collimator defines acceptance.
 
</UL>
 
</UL>
 
<font color="red"> Total time: approx 17 days !</font> &nbsp; Based on this list, each day we will come up with a schedule.  Some flexibility will be needed to accomodate problems and changes in plans.
 

Latest revision as of 10:48, 6 June 2017

PREX Run Plan for   Commissioning   and   Auxiliary Measurements

This was for the 2010 PREX-I run.   A run plan for PREX-II and C-REX is forthcoming.

See also the Daily Run Plan and Earlier Daily Run Plan

The experiment is approved for 30 PAC days; there are 2 weeks of "commissioning" listed, and then an additional 61 days for production.

Below is a list of tasks in the approximate time order, with person(s) responsible, approximate amount of time required, and comments about the conditions or needs. The time will, in most cases, be broken up into manageable chunks. For example, the GEM commissioning will occur in about 4 periods of time, each 4 hours, separated by at least one day. After commissioning we go into a regular production mode; see the HOWTO webpage for shift worker instructions for the 2010 run.

Spillover from Beam Restore

  • Basic Beam Setup -- 1 shift   Jay Benesch, Bteam
  • Source and Parity Quality Beam -- essentially done   Kent Paschke, Mark Dalton, Rupesh Silwal

Low Current Checkout with Water Cell (2-3 calendar days)

  • Septum checkout (Sieve IN) -- 1 shift
    • Septum Commissioning (Priority activity) --   Bob Michaels, John LeRose
      • Verify septum does not steer beam
      • Thin target, first VDC data at 1-2 uA
    • Low-current cavities --   Bob Michaels
      • Check hardware at 1-2 uA
    • Target alignment check --   Bob Michaels
      • Check spot on BeO viewer
      • Put in Ta or ultra-thin C12 target
      • Scan few mm up-down, left-right, verify from rates we're not hitting a frame.
    • VDC Checkout --   Dustin McNulty, Alexandre Camsonne, Bob Michaels
      • Look for sieve holes; first check on optics
    • Quartz detectors checkout --   Dustin McNulty, Piotr Decowski, Jon Wexler
      • Calibrate detector x-y movers in VDC coordinates
    • GEM checkout --   Ole Hansen, Alexandre Camsonne, Nilanga Liyanage
      • First look at noise, pulse-heights, tracks
  • Spectrometer checkout (Sieve OUT) -- 1 shift
    • Low-current cavities (Priority activity) --   John Musson, Zafar Ahmed
      • Need before subsequent program, especially Optics and Q2
    • VDC Checkout --   Dustin McNulty, Alexandre Camsonne, Bob Michaels
      • First spectra on specific thin targets
      • Learn to measure rates to 10% and study rate dependence effects
    • Quartz detectors checkout --   Dustin McNulty, Piotr Decowski, Jon Wexler
      • Detector pulse height spectra
      • If possible, compare 6 and 10 mm blocks
      • Map shadow of quartz (both primary and A_T hole) in VDCs
    • GEM checkout --   Ole Hansen, Alexandre Camsonne, Nilanga Liyanage
      • First attempt at GEM commissioning
      • Identify Quartz detector shadows in GEM & VDC coordinates
  • A_T hole characterization -- 1 shift
    • Determine placement of A_T detectors (Priority activity) --   Bob Michaels, Dustin McNulty
      • Characterize acceptance on thin targets with A_T hole blocked & unblocked
      • Two or three accesses to block and unblock A_T hole
    • Parasitic GEM/Detector studies --   GEM & Detector teams
      • Accumulate statistics on detector pulse height
      • Learn to measure rates to 10% with GEMs
      • A_T hole alignment
      • Place A_T hole detector such that rate is ~ 100 times less than main detector (with thick target)
  • Water Cell & Optics -- 2 shifts
    • Absolute angle measurement (Priority activity) --   Nilanga et al
      • Sieve Slit runs
      • Angle calibration

Lead Target Checkout (1-2 calendar days)

  • High Current Commissioning -- 1 shift
    • Production target checkout (Priority activity) --   Bob Michaels et al
      • 100 uA on thick Lead, monitor radiation levels, establish luminosity limits
    • Electronics commissioning --   KK, Luis, Paul et al
      • Establish LUMI performance characteristics
      • Detailed measurements of various oversampling configurations
  • Parity Commissioning -- 1 shift
    • Parity Quality (Priority activity) --   Kent, Rupesh, Luis, Dustin et al
      • IA feedback, beam modulation ( low current modulation - dithering commissioning before CW )
      • Evaluate LUMI regression performance
    • Beam monitor calibrations --   Diancheng Wang, Xiaoyan Deng
      • Bulls-eye scan, fixed gain BPM calibration, BCM calibration
  • Q2 Measurement -- 1 shift
    • Establish Q2 measurement sequence (Priority activity) --   Dustin, Nilanga et al
      • Drift chamber rate measurement at a few nA
      • parasitic GEM commissioning
      • try to establish a rate in GEMs, especially in quartz shadow, at 10-100 nA
    • ARC energy measurement --   Arun Saha
  • High Luminosity Detector Commissioning -- 1 shift
    • Characterization of Integrating Detector response (Priority activity) --   KK, Jon, Dustin et al
      • Estimate detector rates & impact of A_T hole flux
      • Evaluate primary detector and LUMI noise peformance
      • Evaluate BPM performance; compare strip-line regression to cavity regression
      • Establish empirical figure of merit for A_T hole detector
    • Final parasitic GEM commissioning --   Ole, Nilanga et al
      • Compare predicted and measured integrating width prediction at moderate current on thick target

Polarimetry Beam Checkout (1 shift)

  • Moller Beam Checkout -- 2 shifts
    • Moller magnet alignment (Priority activity) --   Moller team
      • Verify Moller magnet does not steer beam
    • Parasitic Compton Checkout --   Compton team
      • Feedback to MCC on beam quality
      • Simultaneous performance on Moller tune, compton background and sufficient raster
    • Access to remove water cell --  Dave Meekins
      • begin cold target operation

Polarimetry Checkout (4-5 calendar days)

  • Compton Commissioning -- 8 shifts   Sirish Nanda, et.al.
    • Beam Tune, Background reduction -- Bteam, Alexandre Camsonne
    • Compton Cavity Checkout -- Sirish et.al.
    • Photon Detector Checkout -- CMU group
    • Electron Detector Checkout -- Alexandre Camsonne
  • Moller Commissioning -- 8 shifts   Sasha Glamazdin, et.al.
    • Magnet Alignment -- 1 shift (swing)
    • Raster size and pulse-mode -- 1 shift (day)
    • Target commissioning - 3 shifts
    • Pulse-mode target commissioning - 2 shifts
    • DAQ checkout -- 1 shift

Establishing Production (2-3 calendar days)

  • Production Checkout -- 2 shifts
    • Final detector alignment checks
    • Final LUMI/noise/helicity flip rate checks
    • Final beam modulation tweaks
    • Quick check for gross non-linearities
    • 4 hours longitudinal polarization production data
  • Transverse Polarization -- 4 shifts
    • Double-Wien Spin Manipulator Commissioning --   Joe Grames
    • Spin dance
    • 4 hours transverse vertical polarization production
    • 2 shifts transverse horizontal polarization production

Total time: approx 15 days !   Based on this list, each day we will come up with an adjustment to the Daily Run Plan. Some flexibility will be needed to accomodate problems and changes in plans.

Important Activities after few days of production

  • Linearity Studies -- 1 shift   Rupesh Silwal, Kent Paschke, Luis Mercado
  • Background Studies -- 2 shifts
    • Scans of Septum Magnet and HRS Dipole
    • Thin Lead Target to check for inelastics at high-resolution
    • Thin C12 to measure diamond background
  • Possible scan of Q1 to optimize acceptance and verify that collimator defines acceptance.