Difference between revisions of "PREX/CREX May 25 2017 1:00pm EDT"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) |
Ciprian Gal (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Back to [[Main_Page|Main Page]] >> [[PREX/CREX_Teleconferences]] | Back to [[Main_Page|Main Page]] >> [[PREX/CREX_Teleconferences]] | ||
− | [[PREX/CREX_May_11_2017_1:00pm_EDT|previous meeting]] << >> [[PREX/ | + | [[PREX/CREX_May_11_2017_1:00pm_EDT|previous meeting]] << >> [[PREX/CREX_Jun_1_2017_11:00am_EDT|following meeting]] |
Line 14: | Line 14: | ||
== Agenda == | == Agenda == | ||
# Propose new meeting time: 11am Thursday | # Propose new meeting time: 11am Thursday | ||
− | #Ciprian: beampipe configuration [http://hallaweb.jlab.org/parity/prex/beamline/ | + | #* KP: will wait until we get an anwer from Paul S. |
− | #* | + | #Ciprian: beampipe configuration [http://hallaweb.jlab.org/parity/prex/beamline/ documentation] [http://hallaweb.jlab.org/parity/prex/beamline/170525_PREX_Beamline_CGal.pdf pdf] |
+ | #* KP: this will take a lot of power so we need more information | ||
+ | #* DG: would like to join in the meeting with Keith | ||
#2016 Beam Request Forms ([https://www.jlab.org/exp_prog/experiments/scheduling.html link]) | #2016 Beam Request Forms ([https://www.jlab.org/exp_prog/experiments/scheduling.html link]) | ||
#* Call for Requests [http://hallaweb.jlab.org/parity/prex/beamreq/2016/Call_for_Scheduling_requests.pdf pdf] | #* Call for Requests [http://hallaweb.jlab.org/parity/prex/beamreq/2016/Call_for_Scheduling_requests.pdf pdf] | ||
#* Interactive Form ([http://hallaweb.jlab.org/parity/prex/beamreq/2016/PREX_BeamRequest.pdf PREX] / [http://hallaweb.jlab.org/parity/prex/beamreq/2016/CREX_BeamRequest.pdf CREX]) | #* Interactive Form ([http://hallaweb.jlab.org/parity/prex/beamreq/2016/PREX_BeamRequest.pdf PREX] / [http://hallaweb.jlab.org/parity/prex/beamreq/2016/CREX_BeamRequest.pdf CREX]) | ||
#* EDRL ([http://hallaweb.jlab.org/parity/prex/beamreq/2016/EDRL_PREX2.pdf PREX] / [http://hallaweb.jlab.org/parity/prex/beamreq/2016/EDRL_CREX.pdf CREX]) | #* EDRL ([http://hallaweb.jlab.org/parity/prex/beamreq/2016/EDRL_PREX2.pdf PREX] / [http://hallaweb.jlab.org/parity/prex/beamreq/2016/EDRL_CREX.pdf CREX]) | ||
+ | #* KP: we should fill out everything and circulate it through the hall people | ||
+ | #* DG: end of July is the deadline for these documents | ||
#Jay: TOSCA modeling of Q1 (from 2PM) | #Jay: TOSCA modeling of Q1 (from 2PM) | ||
− | #* | + | #* KP: it looks like the implementation is about right in Jay's models |
+ | #* JB: calculating the model at 28% of what Juliette had (294=0.28*1050) for CREX and half that for PREX is a reasonable start according to Jack Seagal. KP/SR: sounds about what we expect. We should check by looking at the field inside the bore of the Q1s | ||
+ | #* CG: will check with Jack or Jessie regarding the material of the septum beampipe and will inform group. | ||
+ | # Other: | ||
+ | #* KK: We need a discussion about priorities going forward (maybe in a restricted format) | ||
== Attendance == | == Attendance == | ||
+ | Bob Michaels, Adam Zec, Cameron Clarke, Dave Gaskell, David Armstrong, KK , Seamus Riordan, Tyler Kutz, Victoria Owen, Mark Pitt, Kent P, Caryn P, Ciprian G, Silviu D, Guido U | ||
=== Excused: === | === Excused: === |
Latest revision as of 11:30, 31 May 2017
Back to Main Page >> PREX/CREX_Teleconferences
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 PARTICIPANT CODE: 913380354# Room IRL: CEBAF F227
Agenda
- Propose new meeting time: 11am Thursday
- KP: will wait until we get an anwer from Paul S.
- Ciprian: beampipe configuration documentation pdf
- KP: this will take a lot of power so we need more information
- DG: would like to join in the meeting with Keith
- 2016 Beam Request Forms (link)
- Jay: TOSCA modeling of Q1 (from 2PM)
- KP: it looks like the implementation is about right in Jay's models
- JB: calculating the model at 28% of what Juliette had (294=0.28*1050) for CREX and half that for PREX is a reasonable start according to Jack Seagal. KP/SR: sounds about what we expect. We should check by looking at the field inside the bore of the Q1s
- CG: will check with Jack or Jessie regarding the material of the septum beampipe and will inform group.
- Other:
- KK: We need a discussion about priorities going forward (maybe in a restricted format)
Attendance
Bob Michaels, Adam Zec, Cameron Clarke, Dave Gaskell, David Armstrong, KK , Seamus Riordan, Tyler Kutz, Victoria Owen, Mark Pitt, Kent P, Caryn P, Ciprian G, Silviu D, Guido U