− | # | + | # Design update: Kent |
− | #* | + | #* KP: significant redesign of the platform around the pivot to accommodate the APEX septum. Additionally the sky shine shielding was integrated. More updates at the collaboration meeting. |
+ | #* KP: Robin has been updating the budget and design/procurement schedule. We discussed the possible redesign of the SAMs. | ||
+ | #* KP: the suggestion was made to use the target cans for SAM cans. They seem to be robust and relatively cheap. | ||
+ | #* KP: we talked to the dump designers about the dump o-ring. They believe that we should be safe (with a somewhat small safety margin). | ||
+ | # SAM status: KK | ||
+ | #* KK: what is the plan for the SAM redesign. KP: we need to have some simulation results and then we different options on hand we can make a decision. | ||
== Attendance == | == Attendance == | ||
+ | Ciprian G, Silviu D, Adam Z, Caryn P, Kent P, Tao Y, Tyler K, Ryan R, Bob M, David A, Chandan G, Jay B, Seamus R, Amali P, KK, Victoria O, Devi A, Paul S, Kent P, Dave G, Cameron C, | ||
+ | === Excused: === | ||
+ | Sanghwa P, Dustin M, | ||
− | + | ||
+ | [[Category:Meetings]] | ||
+ | [[Category:Prex Weekly Meeting]] |
Latest revision as of 15:44, 7 June 2018
Back to Main Page >> PREX/CREX_Teleconferences
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 627 455 790 Bluejeans link: https://bluejeans.com/627455790 Offline room: CEBAF Center L210A
Agenda
- Design update: Kent
- KP: significant redesign of the platform around the pivot to accommodate the APEX septum. Additionally the sky shine shielding was integrated. More updates at the collaboration meeting.
- KP: Robin has been updating the budget and design/procurement schedule. We discussed the possible redesign of the SAMs.
- KP: the suggestion was made to use the target cans for SAM cans. They seem to be robust and relatively cheap.
- KP: we talked to the dump designers about the dump o-ring. They believe that we should be safe (with a somewhat small safety margin).
- SAM status: KK
- KK: what is the plan for the SAM redesign. KP: we need to have some simulation results and then we different options on hand we can make a decision.
Attendance
Ciprian G, Silviu D, Adam Z, Caryn P, Kent P, Tao Y, Tyler K, Ryan R, Bob M, David A, Chandan G, Jay B, Seamus R, Amali P, KK, Victoria O, Devi A, Paul S, Kent P, Dave G, Cameron C,