Line 1: | Line 1: | ||
− | <big> <font color="" size="+2"> Task List, Preparing for | + | <big> <font color="" size="+2"> Task List, Preparing for 2019 Run </font></big> |
__FORCETOC__ | __FORCETOC__ | ||
− | == Simulation == | + | |
− | + | == Radiation Benchmarking == | |
+ | * ERR recommendation | ||
+ | * Contact Dave Hamlette, Javier Gomez to discuss metrics for benchmark | ||
+ | |||
+ | |||
+ | |||
+ | == Design and Simulation == | ||
+ | ===Base design, v3 Benchmarks.=== | ||
+ | <<Complete by March 16>> | ||
* Need new benchmarks (accounting for updated geometry (dump, HRS) and SAMS | * Need new benchmarks (accounting for updated geometry (dump, HRS) and SAMS | ||
** for PREX-I, HAPPEX-II, PREX-2, CREX (and others?) | ** for PREX-I, HAPPEX-II, PREX-2, CREX (and others?) | ||
Line 34: | Line 42: | ||
* DVCS? | * DVCS? | ||
− | + | ===Geometry, Next iteration.=== | |
+ | <<Complete by April 6>>. | ||
* realistic gaps around dump shield | * realistic gaps around dump shield | ||
* target chamber | * target chamber | ||
Line 41: | Line 50: | ||
* modified SAM design? | * modified SAM design? | ||
− | + | ===Magnetic Shielding=== | |
+ | * Evaluate B-field in Q1 beampipe with only one Q1 energized | ||
+ | * Evaluate the Tritium-Magnetic-shield design | ||
+ | * Evaluate mag shield additions for upstream/downstream septum beampipe | ||
+ | |||
+ | ===O-Ring damage=== | ||
* Plots: | * Plots: | ||
** E-weighted, electron only plots from beamline det an o-ring det | ** E-weighted, electron only plots from beamline det an o-ring det | ||
Line 63: | Line 77: | ||
** CREX | ** CREX | ||
− | + | ===SAM redesign=== | |
* calculate rates vs angle | * calculate rates vs angle | ||
* calculate doses vs angles | * calculate doses vs angles | ||
* get details on beer can, make default design including welding | * get details on beer can, make default design including welding | ||
* Attempt final design | * Attempt final design | ||
+ | * Propose/Exam alternative SBMs | ||
− | + | ===Activation Estimation=== | |
* Downstream septum beampipe flange, contact dose | * Downstream septum beampipe flange, contact dose | ||
* Downstream septum beampipe flange, whole body dose | * Downstream septum beampipe flange, whole body dose | ||
Line 76: | Line 91: | ||
* DUST ACTIVATION? | * DUST ACTIVATION? | ||
− | + | ===HDPE parameters=== | |
* Total / peak radiation dose. Damage? | * Total / peak radiation dose. Damage? | ||
* spec non-flamable HDPE, or devise fireproofing | * spec non-flamable HDPE, or devise fireproofing | ||
− | + | ===Thermal Neutrons:=== | |
* count thermal/near thermal (<1eV rate), assume 8MeV / n energy release, compare to E&M power | * count thermal/near thermal (<1eV rate), assume 8MeV / n energy release, compare to E&M power | ||
* plot sources of thermal neutrons in hall, using hall-lid and HRS-platform detectors | * plot sources of thermal neutrons in hall, using hall-lid and HRS-platform detectors | ||
Line 86: | Line 101: | ||
* calculate thermal neutrons at Compton polarimeter | * calculate thermal neutrons at Compton polarimeter | ||
+ | === Polarimeter doses === | ||
+ | * Evaluate dose and neutron rates (both thermal and above) at Moller and Compton locations | ||
+ | ** Moller target holder uses o-ring (evaluate dose) | ||
+ | === Spectrometer Optics Design === | ||
+ | * FOM optimization | ||
+ | * Q1 collimator cut-out | ||
== Analysis Chain == | == Analysis Chain == | ||
+ | * First attempt at new analyzer <<June deadline>> | ||
+ | * Test on PREX1 data. | ||
+ | ** (Re)Create plots that were used to verify PREX1 data integrity/quality | ||
+ | ** Add analysis and drawing macros to analyzer package | ||
+ | * Create fake PREX2/CREX data with updated names and addresses for BCMs, BPMs. | ||
+ | * Use macros to create online monitoring GUIs | ||
+ | ** Add warning messages for online monitoring for shift crew | ||
== DAQ / Slow Controls == | == DAQ / Slow Controls == | ||
+ | * Multicrate running. | ||
+ | * Sync monitor. | ||
+ | * Test fast event transfer to online monitor/feedback at 240 Hz | ||
+ | * ADC maintenance - number of channels, etc | ||
+ | * BCM, digital cavity receivers - verify functioning | ||
+ | * Select which BPMs should be in the data stream. very proper functioning at 240 Hz | ||
+ | * slow controls | ||
+ | == Beam Modulation System == | ||
+ | * Testing of installed hardware | ||
+ | * Evaluation of accelerator interface software | ||
+ | * Coordination with other halls, scheduling committee | ||
+ | *Beam modulation software (Hall) | ||
+ | ** modulation process | ||
+ | ** slow control / monitoring | ||
+ | ** DAQ interface | ||
− | |||
== Detector Stack == | == Detector Stack == | ||
− | + | ===GEMs=== | |
+ | |||
+ | ===Integrating Detectors=== | ||
+ | * Complete Design | ||
+ | * Linearity Studies | ||
+ | * Plan for Blind tubes in spectrometer hut? | ||
+ | |||
+ | ===Detector Mounting Hardware=== | ||
+ | |||
+ | == Polarized Source / Injector == | ||
+ | * RTP / KD*P? | ||
+ | * Test setting limits on spot size | ||
+ | * Outline configuration procedure and run-planning | ||
+ | * spin-flipper studies | ||
+ | |||
+ | |||
+ | |||
+ | == Moller Polarimeter == | ||
+ | * 1 GeV Optics | ||
+ | * simulation for acceptance evaluation | ||
+ | * target system installation | ||
+ | * Plan to establish high-precision Moller polarimetry (ERR recommendation) | ||
+ | |||
+ | |||
+ | |||
+ | == Compton Polarimeter == | ||
+ | * Plan to establish high-precision Compton polarimetry (ERR recommendation) | ||
+ | * Laser Maintenance and improvement, summer 2018 | ||
+ | * e- detector, final plan | ||
− | |||
− | |||
− | |||
== Documentation == | == Documentation == | ||
− | + | === Run planning === | |
+ | * Plan for beam alignment (collimator, dump) and raster commissioning (ERR recommendation) | ||
+ | * Comprehensive List / Planning for survey and alignment tasks | ||
+ | * Watercell (pointing) runplan | ||
+ | * optics runplan | ||
+ | * detector alignment run plan | ||
+ | |||
+ | ===Formal=== | ||
+ | * Finalize OSPs (ERR recommendation) | ||
+ | |||
+ | ===Collaboration=== | ||
+ | |||
− | + | [[Category:Meetings]] | |
+ | [[Category:Prex Weekly Meeting]] | ||
+ | [[Category:Task List]] |
Latest revision as of 15:46, 7 June 2018
Task List, Preparing for 2019 Run
Radiation Benchmarking
- ERR recommendation
- Contact Dave Hamlette, Javier Gomez to discuss metrics for benchmark
Design and Simulation
Base design, v3 Benchmarks.
<<Complete by March 16>>
- Need new benchmarks (accounting for updated geometry (dump, HRS) and SAMS
- for PREX-I, HAPPEX-II, PREX-2, CREX (and others?)
- on HRS detectors, under HRS detectors, Hall Lid or Hall Wall total ("whole hall"), and Hall Lid skyshine estimates
- prex2-v3:
- prex-2 dump, with shield
- no SAMS, or alternative SAMs?
- crex2-v3:
- (same with 48Ca target and 2.1 GeV)
- prex1-"??name??"
- PREX-I collimator
- PREX-I chamber? (not as important)
- PREX-I dump (with KW correction)
- no HDPE, no SkyshineShield
- Full size HRS det and structure, match prex2
- FULL PREX-I SAMS
- HAPPEX-II - ??name??
- HAPPEX-II collimator (same as PREX-I?)
- PREX-I dump (with KW correction)
- 3.2 GeV, 20cm LH2
- PREX-I chamber (not as important)
- no HDPE, no SkyshineShield
- Full size HRS det and strucutre, match prex2 sim
- FULL PREX-I SAMS
- PV-DIS?
- HAPPEX-3?
- TRITIUM (11 GeV)?
- DVCS?
Geometry, Next iteration.
<<Complete by April 6>>.
- realistic gaps around dump shield
- target chamber
- collimator chamber to match design
- HDPE around target to match design
- modified SAM design?
Magnetic Shielding
- Evaluate B-field in Q1 beampipe with only one Q1 energized
- Evaluate the Tritium-Magnetic-shield design
- Evaluate mag shield additions for upstream/downstream septum beampipe
O-Ring damage
- Plots:
- E-weighted, electron only plots from beamline det an o-ring det
- tables to arrive at integrated grays
- hall-lid det x0/y0 plot to show enhancement from full SAMS
- get info on O-ring from engineering. (material, lifetime expectations, also when did this appear?)
- Full base design (Feb18), but w/o dump shield
- Use Al around O-ring
- No SAMS
- PREX-I SAMS
- test 1/2 size O-ring (PREX) (PREX-I SAMS)
- Done, but dumb results. Compare 1/2 size O-ring with 1/2 of full size O-ring.
- test no material around O-ring (PREX) (PREX-I SAMS)
- CREX
- No SAMS
- PREX-I SAMS
- check beam-offset run
- Use Al around O-ring
- Results for alternative SAM configs
- Final estimate use full base design (Feb18), including dump shield
- PREX-2
- CREX
SAM redesign
- calculate rates vs angle
- calculate doses vs angles
- get details on beer can, make default design including welding
- Attempt final design
- Propose/Exam alternative SBMs
Activation Estimation
- Downstream septum beampipe flange, contact dose
- Downstream septum beampipe flange, whole body dose
- CREX activation estimates
- HDPE activation.
- DUST ACTIVATION?
HDPE parameters
- Total / peak radiation dose. Damage?
- spec non-flamable HDPE, or devise fireproofing
Thermal Neutrons:
- count thermal/near thermal (<1eV rate), assume 8MeV / n energy release, compare to E&M power
- plot sources of thermal neutrons in hall, using hall-lid and HRS-platform detectors
- consider effect of 5% boron
- calculate thermal neutrons at Compton polarimeter
Polarimeter doses
- Evaluate dose and neutron rates (both thermal and above) at Moller and Compton locations
- Moller target holder uses o-ring (evaluate dose)
Spectrometer Optics Design
- FOM optimization
- Q1 collimator cut-out
Analysis Chain
- First attempt at new analyzer <<June deadline>>
- Test on PREX1 data.
- (Re)Create plots that were used to verify PREX1 data integrity/quality
- Add analysis and drawing macros to analyzer package
- Create fake PREX2/CREX data with updated names and addresses for BCMs, BPMs.
- Use macros to create online monitoring GUIs
- Add warning messages for online monitoring for shift crew
DAQ / Slow Controls
- Multicrate running.
- Sync monitor.
- Test fast event transfer to online monitor/feedback at 240 Hz
- ADC maintenance - number of channels, etc
- BCM, digital cavity receivers - verify functioning
- Select which BPMs should be in the data stream. very proper functioning at 240 Hz
- slow controls
Beam Modulation System
- Testing of installed hardware
- Evaluation of accelerator interface software
- Coordination with other halls, scheduling committee
- Beam modulation software (Hall)
- modulation process
- slow control / monitoring
- DAQ interface
Detector Stack
GEMs
Integrating Detectors
- Complete Design
- Linearity Studies
- Plan for Blind tubes in spectrometer hut?
Detector Mounting Hardware
Polarized Source / Injector
- RTP / KD*P?
- Test setting limits on spot size
- Outline configuration procedure and run-planning
- spin-flipper studies
Moller Polarimeter
- 1 GeV Optics
- simulation for acceptance evaluation
- target system installation
- Plan to establish high-precision Moller polarimetry (ERR recommendation)
Compton Polarimeter
- Plan to establish high-precision Compton polarimetry (ERR recommendation)
- Laser Maintenance and improvement, summer 2018
- e- detector, final plan
Documentation
Run planning
- Plan for beam alignment (collimator, dump) and raster commissioning (ERR recommendation)
- Comprehensive List / Planning for survey and alignment tasks
- Watercell (pointing) runplan
- optics runplan
- detector alignment run plan
Formal
- Finalize OSPs (ERR recommendation)