Difference between revisions of "TL-DesignAndSim"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) (Created page with "'''Contact''': Kent Paschke ''Manpower'': Kent Paschke, Adam Zec, Victoria Owen, Ciprian Gal __FORCETOC__ == Radiation Benchmarking == * ERR recommendation * Contact Dave H...") |
Kent Paschke (talk | contribs) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | [[Task-List-Landing | Main Task List]] | ||
+ | |||
'''Contact''': Kent Paschke | '''Contact''': Kent Paschke | ||
Line 8: | Line 10: | ||
* ERR recommendation | * ERR recommendation | ||
* Contact Dave Hamlette, Javier Gomez to discuss metrics for benchmark | * Contact Dave Hamlette, Javier Gomez to discuss metrics for benchmark | ||
+ | * Tritium simulation geomtry, develop and benchmark. (Zec) <<March 28>> | ||
==Base design, v3 Benchmarks.== | ==Base design, v3 Benchmarks.== | ||
Line 19: | Line 22: | ||
*crex2-v3: | *crex2-v3: | ||
** (same with 48Ca target and 2.1 GeV) | ** (same with 48Ca target and 2.1 GeV) | ||
− | * prex1-" | + | * prex1-"v1.9" |
** PREX-I collimator | ** PREX-I collimator | ||
** PREX-I chamber? (not as important) | ** PREX-I chamber? (not as important) | ||
Line 26: | Line 29: | ||
** Full size HRS det and structure, match prex2 | ** Full size HRS det and structure, match prex2 | ||
** FULL PREX-I SAMS | ** FULL PREX-I SAMS | ||
− | * HAPPEX-II - | + | * HAPPEX-II - v1.9 |
** HAPPEX-II collimator (same as PREX-I?) | ** HAPPEX-II collimator (same as PREX-I?) | ||
** PREX-I dump (with KW correction) | ** PREX-I dump (with KW correction) | ||
Line 37: | Line 40: | ||
* HAPPEX-3? | * HAPPEX-3? | ||
* TRITIUM (11 GeV)? | * TRITIUM (11 GeV)? | ||
− | + | ||
− | |||
==Geometry, Next iteration.== | ==Geometry, Next iteration.== | ||
<<Complete by April 6>>. | <<Complete by April 6>>. | ||
Line 48: | Line 50: | ||
==Magnetic Shielding== | ==Magnetic Shielding== | ||
− | * Evaluate B-field in Q1 beampipe with only one Q1 energized | + | * Evaluate B-field in Q1 beampipe with only one Q1 energized (Zec) <<April 1>> |
− | * Evaluate the Tritium-Magnetic-shield design | + | * Evaluate the Tritium-Magnetic-shield design (Zec) << April 8>> |
− | * Evaluate mag shield additions for upstream/downstream septum beampipe | + | * Evaluate mag shield additions for upstream/downstream septum beampipe (Zec) |
==O-Ring damage== | ==O-Ring damage== | ||
+ | * Log results of 1/2 thickness ring vs. 1/2 of full ring volume | ||
+ | * resolve question of half-ring vs full ring | ||
* Plots: | * Plots: | ||
** E-weighted, electron only plots from beamline det an o-ring det | ** E-weighted, electron only plots from beamline det an o-ring det | ||
Line 70: | Line 74: | ||
** check beam-offset run | ** check beam-offset run | ||
* Results for alternative SAM configs | * Results for alternative SAM configs | ||
− | * Final estimate use full base design (Feb18), including dump shield | + | * Final estimate use full base design (Feb18), including dump shield (contingent on final design) |
** PREX-2 | ** PREX-2 | ||
** CREX | ** CREX | ||
− | ==SAM redesign== | + | ==SAM redesign (Cameron Clarke) == |
* calculate rates vs angle | * calculate rates vs angle | ||
* calculate doses vs angles | * calculate doses vs angles | ||
Line 82: | Line 86: | ||
==Activation Estimation== | ==Activation Estimation== | ||
− | |||
− | |||
− | |||
* HDPE activation. | * HDPE activation. | ||
+ | * Off-angle activation | ||
+ | * Install magnetic fields in FLUKA | ||
* DUST ACTIVATION? | * DUST ACTIVATION? | ||
+ | * Downstream septum beampipe flange, contact dose (DONE) | ||
+ | * Downstream septum beampipe flange, whole body dose (DONE) | ||
+ | * CREX activation estimates (DONE) | ||
==HDPE parameters== | ==HDPE parameters== | ||
− | * Total / peak radiation dose. Damage? | + | * Identify suitable borated HDPE material (price, density) |
− | * spec non-flamable HDPE, or devise fireproofing | + | * Total / peak radiation dose. Damage? (DONE) |
+ | * spec non-flamable HDPE, or devise fireproofing (DONE - selected to enclose HDPE in Al box) | ||
==Thermal Neutrons:== | ==Thermal Neutrons:== | ||
− | * count thermal/near thermal (<1eV rate), assume 8MeV / n energy release, compare to E&M power | + | * Log PREX-I results (zec) |
− | * plot sources of thermal neutrons in hall, using hall-lid and HRS-platform detectors | + | * calculate thermal neutrons at Compton polarimeter (zec) |
− | * consider effect of 5% boron | + | * count thermal/near thermal (<1eV rate), assume 8MeV / n energy release, compare to E&M power (DONE) |
− | + | * plot sources of thermal neutrons in hall, using hall-lid and HRS-platform detectors (DONE) | |
+ | * consider effect of 5% boron (DONE) | ||
== Polarimeter doses == | == Polarimeter doses == | ||
* Evaluate dose and neutron rates (both thermal and above) at Moller and Compton locations | * Evaluate dose and neutron rates (both thermal and above) at Moller and Compton locations | ||
** Moller target holder uses o-ring (evaluate dose) | ** Moller target holder uses o-ring (evaluate dose) | ||
− | |||
− | |||
− | |||
− |
Latest revision as of 14:56, 15 March 2018
Contact: Kent Paschke
Manpower: Kent Paschke, Adam Zec, Victoria Owen, Ciprian Gal
Radiation Benchmarking
- ERR recommendation
- Contact Dave Hamlette, Javier Gomez to discuss metrics for benchmark
- Tritium simulation geomtry, develop and benchmark. (Zec) <<March 28>>
Base design, v3 Benchmarks.
<<Complete by March 16>>
- Need new benchmarks (accounting for updated geometry (dump, HRS) and SAMS
- for PREX-I, HAPPEX-II, PREX-2, CREX (and others?)
- on HRS detectors, under HRS detectors, Hall Lid or Hall Wall total ("whole hall"), and Hall Lid skyshine estimates
- prex2-v3:
- prex-2 dump, with shield
- no SAMS, or alternative SAMs?
- crex2-v3:
- (same with 48Ca target and 2.1 GeV)
- prex1-"v1.9"
- PREX-I collimator
- PREX-I chamber? (not as important)
- PREX-I dump (with KW correction)
- no HDPE, no SkyshineShield
- Full size HRS det and structure, match prex2
- FULL PREX-I SAMS
- HAPPEX-II - v1.9
- HAPPEX-II collimator (same as PREX-I?)
- PREX-I dump (with KW correction)
- 3.2 GeV, 20cm LH2
- PREX-I chamber (not as important)
- no HDPE, no SkyshineShield
- Full size HRS det and strucutre, match prex2 sim
- FULL PREX-I SAMS
- PV-DIS?
- HAPPEX-3?
- TRITIUM (11 GeV)?
Geometry, Next iteration.
<<Complete by April 6>>.
- realistic gaps around dump shield
- target chamber
- collimator chamber to match design
- HDPE around target to match design
- modified SAM design?
Magnetic Shielding
- Evaluate B-field in Q1 beampipe with only one Q1 energized (Zec) <<April 1>>
- Evaluate the Tritium-Magnetic-shield design (Zec) << April 8>>
- Evaluate mag shield additions for upstream/downstream septum beampipe (Zec)
O-Ring damage
- Log results of 1/2 thickness ring vs. 1/2 of full ring volume
- resolve question of half-ring vs full ring
- Plots:
- E-weighted, electron only plots from beamline det an o-ring det
- tables to arrive at integrated grays
- hall-lid det x0/y0 plot to show enhancement from full SAMS
- get info on O-ring from engineering. (material, lifetime expectations, also when did this appear?)
- Full base design (Feb18), but w/o dump shield
- Use Al around O-ring
- No SAMS
- PREX-I SAMS
- test 1/2 size O-ring (PREX) (PREX-I SAMS)
- Done, but dumb results. Compare 1/2 size O-ring with 1/2 of full size O-ring.
- test no material around O-ring (PREX) (PREX-I SAMS)
- CREX
- No SAMS
- PREX-I SAMS
- check beam-offset run
- Use Al around O-ring
- Results for alternative SAM configs
- Final estimate use full base design (Feb18), including dump shield (contingent on final design)
- PREX-2
- CREX
SAM redesign (Cameron Clarke)
- calculate rates vs angle
- calculate doses vs angles
- get details on beer can, make default design including welding
- Attempt final design
- Propose/Exam alternative SBMs
Activation Estimation
- HDPE activation.
- Off-angle activation
- Install magnetic fields in FLUKA
- DUST ACTIVATION?
- Downstream septum beampipe flange, contact dose (DONE)
- Downstream septum beampipe flange, whole body dose (DONE)
- CREX activation estimates (DONE)
HDPE parameters
- Identify suitable borated HDPE material (price, density)
- Total / peak radiation dose. Damage? (DONE)
- spec non-flamable HDPE, or devise fireproofing (DONE - selected to enclose HDPE in Al box)
Thermal Neutrons:
- Log PREX-I results (zec)
- calculate thermal neutrons at Compton polarimeter (zec)
- count thermal/near thermal (<1eV rate), assume 8MeV / n energy release, compare to E&M power (DONE)
- plot sources of thermal neutrons in hall, using hall-lid and HRS-platform detectors (DONE)
- consider effect of 5% boron (DONE)
Polarimeter doses
- Evaluate dose and neutron rates (both thermal and above) at Moller and Compton locations
- Moller target holder uses o-ring (evaluate dose)