Difference between revisions of "PREX/CREX Apr 4, 2018 10:00am"
From PREX Wiki
Jump to navigationJump to searchCiprian Gal (talk | contribs) |
|||
(One intermediate revision by one other user not shown) | |||
Line 13: | Line 13: | ||
== Agenda == | == Agenda == | ||
# Status: Ciprian | # Status: Ciprian | ||
+ | #* CG: Eric, Sanghwa, Kent and I are working to push the Moller polarimeter simulations forward. | ||
#* CG: Adam is working on TOSCA simulations for 1 arm running using the models developed by Jay | #* CG: Adam is working on TOSCA simulations for 1 arm running using the models developed by Jay | ||
#* CG: Adam is creating a tritium configuration to look at the boundary dose estimates as a further benchmark for our method | #* CG: Adam is creating a tritium configuration to look at the boundary dose estimates as a further benchmark for our method | ||
Line 22: | Line 23: | ||
=== Excused: === | === Excused: === | ||
Kent P, Dave G, David A, Sanghwa P | Kent P, Dave G, David A, Sanghwa P | ||
+ | |||
+ | |||
+ | [[Category:Meetings]] | ||
+ | [[Category:Prex Weekly Meeting]] |
Latest revision as of 15:44, 7 June 2018
Back to Main Page >> PREX/CREX_Teleconferences
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 627 455 790 Bluejeans link: https://bluejeans.com/627455790 Offline room: CEBAF Center L210A
Agenda
- Status: Ciprian
- CG: Eric, Sanghwa, Kent and I are working to push the Moller polarimeter simulations forward.
- CG: Adam is working on TOSCA simulations for 1 arm running using the models developed by Jay
- CG: Adam is creating a tritium configuration to look at the boundary dose estimates as a further benchmark for our method
- KK: the new budget almost ensures that Tritium will be completed this year (as long as the accelerator cooperates). Additionally ~10M$ was given for the upgrade of the ESR (which will be needed for MOLLER). CG: this means that the summer down will be shorter so any work will have to planned carefully.
- CC: will work on SAM configurations later this week
Attendance
Ciprian G, Adam Z, Eric K, Paul S, Robert M, Ryan R, Seamus R, Silviu D, Tao Y, Devi A, Amali P, Jay B, KK, Victoria O, Dustin M, Caryn P, Cameron C,
Excused:
Kent P, Dave G, David A, Sanghwa P