Difference between revisions of "RunPlanDaily"

From PREX Wiki
Jump to navigationJump to search
m
 
(669 intermediate revisions by 26 users not shown)
Line 1: Line 1:
== Daily Run Plan ==
 
  
Here are details of the daily run planSee also the global [https://prex.jlab.org/wiki/index.php?title=RunPlan Run Plan].  The person responsible should ensure that
+
<br><br>
a crew of experts is available for the shift.  This schedule will be updated frequently by the Run Coordinator
+
[[Main_Page|<B>CREX Main</B>]] << [[Main_Page_PREXII|PREX II Main]] << [[Run Coordinator Tools]] <br><br>
as the situation on the ground changes. 
+
 
<p>
+
[[PREX2RunPlan2019 | PREX Global Run Plan]] -- [[RunPlanDaily_CREX|CREX Daily Run Plan]]
Last update: <font color="blue">Mar 19, 2010</font>.
+
 
 +
== Current Daily Run Plans ==
 +
 
 +
The current day is indicated by a color.
 +
 
 +
{| class="wikitable" border="1" style="width:100%; text-align:left;border-collapse:collapse"
 +
|-
 +
! style="width:10%"| Day, Date || style="width:10%"| Shift|| style="width:30%"| Tasks (Responsible Party) || style="width:30%"| Status
 +
 
 +
|-
 +
| rowspan="3" | Wedsday, September 4
 +
| Owl
 +
| Production 71uA
 +
|
 +
|-
 +
| Day
 +
| Moller
 +
|
 +
|-
 +
| Swing
 +
| Moller
 +
|
 +
|-
 +
| rowspan="3" | Thursday, September 5
 +
| Owl
 +
| Production 71uA
 +
|
 +
|-
 +
| Day
 +
| Mott polarimetry measurements
 +
|
 +
|-
 +
| Swing
 +
| Production 71uA
 +
|
 +
|-
 +
| rowspan="3" | Friday, September 6
 +
| Owl
 +
| Production 71uA
 +
|
 +
|-
 +
| Day
 +
| Production 85uA
 +
|
 +
|-
 +
| Swing
 +
| Production 85uA
 +
|
 +
|-
 +
| rowspan="3" | Saturday, September 7
 +
| Owl
 +
| Production 85uA
 +
|
 +
|-
 +
| Day
 +
| Production 85uA
 +
|
 +
|-
 +
| Swing
 +
| Production 85uA
 +
|
 +
|-
 +
|-style="background: #FCF3CF;
 +
| rowspan="3" | Sunday, September 8
 +
| Owl
 +
| Production 85uA
 +
|
 +
|-
 +
| Day
 +
| Moller Polarimetry
 +
|
 +
|-
 +
| Swing
 +
| Q2 measurement and Spectrometer rescattering
 +
| https://prex.jlab.org/wiki/index.php/RescatteringPlan
 +
|-
 +
| rowspan="3" | Monday, September 9
 +
| Owl
 +
| Production 85uA
 +
|
 +
|-
 +
| Day
 +
| SADness
 +
| Scheduled Accelerator Down begins
 +
|}
 +
[[Run plan history | <B>Previous Daily Run Plans</B>]]
 +
 
 +
== Instructions for RC ==
 +
 
 +
* Let the day shift know what to do while you attend the MCC meeting
 +
* Copy the daily run plans for the previous week to the [[Run plan history]]
 +
* Copy the [[Run Plan Template]] table to this page and change the dates
 +
* Update the plan above (if necessary) after the MCC meeting
 +
 
 +
[[Category:HOW TO]] [[Category:SL]] [[Category:RC]]
 +
 
 
<hr>
 
<hr>
 
<table border="1">
 
<caption> Daily Run Plan for PREX &nbsp; (latest at bottom)
 
</caption>
 
<tr> <th> Date (2010) </th><th> Shift </th><th>---------- Activity ----------</th><th>-- Responsible --</th><th>--- Status ---</th></tr>
 
<tr> <td> 03/19 </td><td> day </td>
 
<td> pump down; Møller, Compton, septum install; Q2 repair<br />
 
Insert sieve. </td>
 
<td> Techs </td><td></td></tr>
 
<tr> <td> 03/19 </td><td> swing </td><td> Beam restore</td><td> B-team </td> <td> not done</td></tr>
 
<tr> <td> 03/20 </td><td> owl </td>
 
<td> <font color="red">Septum checkout</font>
 
also:<br />
 
Initial look at low current cavity monitors<br />
 
Target alignment<br />
 
VDC checkout<br />
 
Quartz detectors checkout<br />
 
GEM checkout<br />
 
----
 
All at 1-2 µA.
 
</td>
 
<td> <font color="red">Michaels, LeRose</font>
 
<br />
 
Michaels, Zafar<br />
 
Michaels<br />
 
McNulty, Camsonne, Michaels<br />
 
McNulty, Wexler<br />
 
Camsonne<br />
 
----
 
<br />
 
</td><td>not done</td> </tr>
 
<tr> <td> 03/20 </td><td> day </td>
 
<td> Quads repair; Compton install<br />
 
Remove sieve</td>
 
<td> Techs </td><td>not done</td></tr>
 
<tr> <td> 03/20 </td><td> swing </td>
 
<td> <font color="red">Low current cavity monitors setup</font>
 
<font color="red">Spectrometer checkout</font> <br />
 
VDC checkout<br />
 
Quartz detectors checkout<br />
 
GEM checkout<br />
 
Lumi checkout<br />
 
----
 
All at <~ 100 nA. </td>
 
<td>
 
<font color="red">Musson</font><br /><br />
 
McNulty, Camsonne, Michaels<br />
 
McNulty, Decowski, Wexler<br />
 
Hansen, Camsonne, Liyanage<br />
 
Silwal, Mercado, D. Wang
 
----
 
<br /></td><td>not done</td> </tr>
 
</table>
 

Latest revision as of 16:22, 5 December 2019



CREX Main << PREX II Main << Run Coordinator Tools

PREX Global Run Plan -- CREX Daily Run Plan

Current Daily Run Plans

The current day is indicated by a color.

Day, Date Shift Tasks (Responsible Party) Status
Wedsday, September 4 Owl Production 71uA
Day Moller
Swing Moller
Thursday, September 5 Owl Production 71uA
Day Mott polarimetry measurements
Swing Production 71uA
Friday, September 6 Owl Production 71uA
Day Production 85uA
Swing Production 85uA
Saturday, September 7 Owl Production 85uA
Day Production 85uA
Swing Production 85uA
Sunday, September 8 Owl Production 85uA
Day Moller Polarimetry
Swing Q2 measurement and Spectrometer rescattering https://prex.jlab.org/wiki/index.php/RescatteringPlan
Monday, September 9 Owl Production 85uA
Day SADness Scheduled Accelerator Down begins

Previous Daily Run Plans

Instructions for RC

  • Let the day shift know what to do while you attend the MCC meeting
  • Copy the daily run plans for the previous week to the Run plan history
  • Copy the Run Plan Template table to this page and change the dates
  • Update the plan above (if necessary) after the MCC meeting