Difference between revisions of "DAQ Meeting/20180801"
From PREX Wiki
Jump to navigationJump to search(One intermediate revision by the same user not shown) | |||
Line 10: | Line 10: | ||
==Agenda== | ==Agenda== | ||
− | * Bob : Replace bad NIM crate with new one and ensure that original functionality is still there, including the delayed T_Settle output to the STR7200 Scaler | + | * Bob and Cameron : Replace bad NIM crate with new one and ensure that original functionality is still there, including the delayed T_Settle output to the STR7200 Scaler |
− | * Bob : Get Bank data structure incorporated in Prex_ts_banks.crl functionality | + | * Bob and Cameron : Get Bank data structure incorporated in Prex_ts_banks.crl functionality |
+ | * Simona and Cameron : Cameron will go through the old Moller Polarimeter DAQ and Analysis code to understand and document it on the hallaweb wiki | ||
==Minutes== | ==Minutes== | ||
− | + | * Bob and Cameron: Replace NIM crate in Injector Parity DAQ | |
− | * Replace NIM crate in Injector Parity DAQ | ||
** We replaced the bad NIM crate with a new one from Riad | ** We replaced the bad NIM crate with a new one from Riad | ||
** We noted the wires and put everything back | ** We noted the wires and put everything back | ||
Line 24: | Line 24: | ||
** Run 4123 is another - ''data looks good in both'' | ** Run 4123 is another - ''data looks good in both'' | ||
** Check if the helicity signal looks good | ** Check if the helicity signal looks good | ||
− | *** Amali's notes for checking helicity signal - | + | *** Amali's notes for checking helicity signal - some problems existed, eventually got worked out, but we need a timing diagram and we need to verify that things are working as intended later |
− | * Adding in Bank structures to Prex_ts_banks.crl | + | * Bob and Cameron: Adding in Bank structures to Prex_ts_banks.crl |
** Bob says that putting a bank around groups of similar modules is fine, rather than having a bank per individual module | ** Bob says that putting a bank around groups of similar modules is fine, rather than having a bank per individual module | ||
** This could get complicated for the current configuration that has some conditional flags determining which modules are read for the same old-style header | ** This could get complicated for the current configuration that has some conditional flags determining which modules are read for the same old-style header | ||
+ | * Simona and Cameron: Moller Polarimeter DAQ and Analysis code | ||
+ | ** Prex II will run wil the "old DAQ" while the "new DAQ" is being developed and deployed in parallel | ||
+ | ** PAW code is being used to do the analysis (compiled exec commands from .f files) | ||
+ | *** Roman Pomatsalyuk wrote the code | ||
+ | *** We should rewrite it in C++ so it can be tracked and known by newer people too | ||
+ | *** /adaq1/data1/moller has NTuples and CODA files stored in it | ||
+ | *** /moller/bin/rawread turns CODA files into NTuples | ||
+ | ** Roman will send a detailed DAQ map so we can check that everything is still connected - Friday at 10:30 AM | ||
+ | ** We will have Weekly Meetings on Tuesday mornings | ||
+ | ** Hall A closes in the 3rd week of September | ||
== Testing == | == Testing == |
Latest revision as of 18:06, 8 August 2018
Back to Main Page >> DAQ Documentation Portal >> DAQ Meetings
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 475 839 391 Bluejeans link: https://bluejeans.com/475839391
Agenda
- Bob and Cameron : Replace bad NIM crate with new one and ensure that original functionality is still there, including the delayed T_Settle output to the STR7200 Scaler
- Bob and Cameron : Get Bank data structure incorporated in Prex_ts_banks.crl functionality
- Simona and Cameron : Cameron will go through the old Moller Polarimeter DAQ and Analysis code to understand and document it on the hallaweb wiki
Minutes
- Bob and Cameron: Replace NIM crate in Injector Parity DAQ
- We replaced the bad NIM crate with a new one from Riad
- We noted the wires and put everything back
- We also restored the T_Settle delayed-to-STR7200 module
- The delay offset is not behaving as expected when twisting knobs - Ask Paul King
- Run 4122 is an Injector.crl run in TI-standalone triggering mode
- Run 4123 is another - data looks good in both
- Check if the helicity signal looks good
- Amali's notes for checking helicity signal - some problems existed, eventually got worked out, but we need a timing diagram and we need to verify that things are working as intended later
- Bob and Cameron: Adding in Bank structures to Prex_ts_banks.crl
- Bob says that putting a bank around groups of similar modules is fine, rather than having a bank per individual module
- This could get complicated for the current configuration that has some conditional flags determining which modules are read for the same old-style header
- Simona and Cameron: Moller Polarimeter DAQ and Analysis code
- Prex II will run wil the "old DAQ" while the "new DAQ" is being developed and deployed in parallel
- PAW code is being used to do the analysis (compiled exec commands from .f files)
- Roman Pomatsalyuk wrote the code
- We should rewrite it in C++ so it can be tracked and known by newer people too
- /adaq1/data1/moller has NTuples and CODA files stored in it
- /moller/bin/rawread turns CODA files into NTuples
- Roman will send a detailed DAQ map so we can check that everything is still connected - Friday at 10:30 AM
- We will have Weekly Meetings on Tuesday mornings
- Hall A closes in the 3rd week of September