Difference between revisions of "GEM Meeting/20180810"
From PREX Wiki
Jump to navigationJump to searchChandabindu (talk | contribs) (→Agenda) |
Chandabindu (talk | contribs) |
||
(4 intermediate revisions by 2 users not shown) | |||
Line 11: | Line 11: | ||
*Tao Ye : SBU SRS-DAQ update [[media:GEM-Meeting-20180810-TaoYe.pdf|slides]] | *Tao Ye : SBU SRS-DAQ update [[media:GEM-Meeting-20180810-TaoYe.pdf|slides]] | ||
*Chandan Ghosh : SBU GEM update [[media:GEMUpdate10August18.pdf|slides]] | *Chandan Ghosh : SBU GEM update [[media:GEMUpdate10August18.pdf|slides]] | ||
+ | *Dustin : ISU GEM update [[media:gemUpdate_2018August10.pdf|slides]] | ||
==Minutes== | ==Minutes== | ||
+ | #* Bryan: SRS problem is already debugged for PRad | ||
+ | #* Seamus: We should use the HallA analyzer for GEM decoder | ||
+ | #* Siyu: 6 SBS GEMs are ready for using for PREX | ||
+ | #* Seamus: Siyu will provide details of SBS GEM detectors requirement. | ||
+ | #* Dustin: Provides details of space, electronics modules and other requirements | ||
+ | #* Bob: Better to have two different crates for integrating and counting modes | ||
+ | #* Seamus: We should have a meeting for integrating detectors for counting and integrating mode | ||
+ | #* Seamus: 31st August will be Integrating detector meeting | ||
+ | == Present == | ||
+ | Robert Michaels, Marisa, Dustin, Bryan, Siyu Jian, Seamus,Chandan | ||
+ | |||
+ | ===Excused=== | ||
+ | Tao Y |
Latest revision as of 16:20, 10 August 2018
Back to Main Page >> GEM_Meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 998 903 0149 Bluejeans link: https://bluejeans.com/9989030149
Agenda
- Tao Ye : SBU SRS-DAQ update slides
- Chandan Ghosh : SBU GEM update slides
- Dustin : ISU GEM update slides
Minutes
- Bryan: SRS problem is already debugged for PRad
- Seamus: We should use the HallA analyzer for GEM decoder
- Siyu: 6 SBS GEMs are ready for using for PREX
- Seamus: Siyu will provide details of SBS GEM detectors requirement.
- Dustin: Provides details of space, electronics modules and other requirements
- Bob: Better to have two different crates for integrating and counting modes
- Seamus: We should have a meeting for integrating detectors for counting and integrating mode
- Seamus: 31st August will be Integrating detector meeting
Present
Robert Michaels, Marisa, Dustin, Bryan, Siyu Jian, Seamus,Chandan
Excused
Tao Y