Difference between revisions of "DAQ Testing/Run List"
From PREX Wiki
Jump to navigationJump to search (Created page with "Further DAQ Documentation is listed at the DAQ Documentation Portal and DAQ Testing links Also see DAQ_Commissioning_Notes|Testing and Co...") |
|||
(37 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
Also see [[DAQ_Commissioning_Notes|Testing and Commissioning Notes]] for a detailed description of tests. | Also see [[DAQ_Commissioning_Notes|Testing and Commissioning Notes]] for a detailed description of tests. | ||
− | = DAQ Testing and Commissioning Run List = | + | == DAQ Testing and Commissioning Run List == |
− | == Summer == | + | |
− | == | + | This is a compilation of runs taken during testing and commissioning of the DAQ before Prex/Crex |
+ | === Summer 2018 === | ||
+ | |||
+ | {| class="wikitable" | ||
+ | !colspan="6"| Run list - Cameron and Chandan | ||
+ | |- | ||
+ | !Day||Run Number||Purpose | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20180728|July 28 2018]] || 4040-4067 | ||
+ | | Testing R HRS ADC Channels | ||
+ | |- | ||
+ | !rowspan="2"| [[DAQ_Testing/20180729|July 29 2018]] ||rowspan="2"| 4068-4104 | ||
+ | | Testing L and R HRS ADC Channels | ||
+ | |- | ||
+ | | and Counting House channel debugging | ||
+ | |- | ||
+ | !rowspan="2"| [[DAQ_Testing/20180730|July 30 2018]] || 4107-4115 | ||
+ | | Fixed control.db, Counting House channel debug | ||
+ | |- | ||
+ | !| 4116-4121 | ||
+ | | Replaced bad vqwk ADCs in counting house crate | ||
+ | |} | ||
+ | |||
+ | === Fall 2018 === | ||
+ | |||
+ | {| class="wikitable" | ||
+ | !colspan="6"| Run list - Cameron, Ye, Bob | ||
+ | |- | ||
+ | !Day||Run Number||Purpose | ||
+ | |- | ||
+ | !rowspan="1"| October 23 2018 || 4444-4465 | ||
+ | | Cameron tests ET deatime | ||
+ | |- | ||
+ | !rowspan="1"| October 24 2018 || 4473-4501 | ||
+ | | Cameron tests ET deatime | ||
+ | |- | ||
+ | !rowspan="1"| October 29 2018 || 4503-4528 | ||
+ | | Cameron tests ET deatime | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181101|November 1 2018]] || 4533-4542 | ||
+ | | Cameron and Ye check on cavity ADC signals | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181102|November 2 2018]] || 4548-4554 | ||
+ | | Cameron tests ET deatime | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181105|November 5 2018]] || 4556-4566 | ||
+ | | Cameron tests ET deatime | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181106|November 6 2018]] || 4568 | ||
+ | | Cameron and Bob test injector timing | ||
+ | |- | ||
+ | !rowspan="2"| [[DAQ_Testing/20181111|November 11 2018]] ||rowspan="2"| | ||
+ | | Injector: Paul King adjusts FLEXIO timing | ||
+ | |- | ||
+ | | Injector: Caryn fixes control.db | ||
+ | |- | ||
+ | !rowspan="2"| [[DAQ_Testing/20181114|November 14 2018]] ||rowspan="1"| 4611-4614 | ||
+ | | Injector: Cameron checks on SIS3801 timing | ||
+ | |- | ||
+ | !rowspan="1"| 4615-4617 | ||
+ | | Counting House: Ye and Cameron test CntHouse ADCs again | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181121|November 21 2018]] || 4631-4642 | ||
+ | | MCC High Current test [https://logbooks.jlab.org/entry/3629356 HALOG] | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181127|November 27 2018]] || 4662-4680 | ||
+ | | Cameron tests Injector timing delays (4663 helicity benchmark) | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181202|December 2 2018]] || 4685-4695 | ||
+ | | Cameron tests Injector timing delays (4686 helicity benchmark) | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181203|December 3 2018]] || 4669-4700 | ||
+ | | Cameron tests CntHouse ET deadtime (4700 is a long benchmark run, no beam) | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181205|December 5 2018]] || 4706-4742 | ||
+ | | Cameron tests CntHouse ET deadtime (4742 is a benchmark run, no beam) | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181217|December 17 2018]] || 4776-4812 | ||
+ | | Cameron tests CntHouse ET deadtime, makes conclusions | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181219|December 19 2018]] || 4813-4817 | ||
+ | | Cameron tests Banked CRL in injector timing, and BMW commissioning | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20181221|December 21 2018]] || 4818-4822 | ||
+ | | Cameron tests new RHRS scaler in PREX config, reads data, incorrectly | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | === Spring 2019 === | ||
+ | |||
+ | There was a change of configs, now we have all Banked configs and reset the run number to 1000 | ||
+ | |||
+ | {| class="wikitable" | ||
+ | !colspan="6"| Run list - Cameron, Ye, Bob, Tao | ||
+ | |- | ||
+ | !Day||Run Number||Purpose | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190115|January 15 2019]] || 1017-1031 | ||
+ | | Cameron and Tao test synchronization monitor | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190118|January 18 2019]] || 1032-1036 | ||
+ | | Cameron tests pedestals with 1.6 V battery in ADC channels | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190122|January 22 2019]] || 1039-1044 and 1098 | ||
+ | | Testing synch monitor with new setup with Paul King | ||
+ | |- | ||
+ | !rowspan="1"| January 22 2019 Swing || 1045-1097 | ||
+ | | Injector PQB Studies | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190123|January 23 2019]] || 1100-1104 | ||
+ | | Testing JAPAN ET online connection and BMW FLEXIO functionality | ||
+ | |- | ||
+ | !rowspan="1"| February 1-3 2019 || 1105-1192 | ||
+ | | Injector studies | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190204|February 04 2019]] || 1193 | ||
+ | | Testing CODA, JAPAN, PANGUIN, and compiled analysis scripts + SAM channel noise floors | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190205|February 05 2019]] || 1194-1198 | ||
+ | | Establishing standard DAQ procedure and HV GUI | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190206|February 06 2019]] || 1199-1211 | ||
+ | | Testing SAMs and ET | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190207|February 07 2019]] || TEDf Test Stand | ||
+ | | Initiating the TEDf test stand | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190212|February 12 2019]] || | ||
+ | | Debugging the HelBoard | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190213|February 13 2019]] || | ||
+ | | Debugging the HelBoard and ADC Testing in TEDf stand | ||
+ | |- | ||
+ | !rowspan="1"| [[Helicity_Control|March 14 2019]] || | ||
+ | | Understanding Beam Sync some, cataloging understanding of helicity control | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190322|March 22 2019]] || | ||
+ | | ET Speed limit tests | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190404|April 04 2019]] || | ||
+ | | Documenting DAQ from APEX setup | ||
+ | |- | ||
+ | !rowspan="1"| [[DAQ_Testing/20190429|April 29 2019]] || 2094-2101 | ||
+ | | Updating INJ DAQ to fix STR 7200 and SIS3801 signals | ||
+ | |- | ||
+ | |} | ||
[[Category:DAQ]][[Category:DAQ_Testing]] | [[Category:DAQ]][[Category:DAQ_Testing]] |
Latest revision as of 17:36, 29 April 2019
Further DAQ Documentation is listed at the DAQ Documentation Portal and DAQ Testing links
Also see Testing and Commissioning Notes for a detailed description of tests.
DAQ Testing and Commissioning Run List
This is a compilation of runs taken during testing and commissioning of the DAQ before Prex/Crex
Summer 2018
Run list - Cameron and Chandan | |||||
---|---|---|---|---|---|
Day | Run Number | Purpose | |||
July 28 2018 | 4040-4067 | Testing R HRS ADC Channels | |||
July 29 2018 | 4068-4104 | Testing L and R HRS ADC Channels | |||
and Counting House channel debugging | |||||
July 30 2018 | 4107-4115 | Fixed control.db, Counting House channel debug | |||
4116-4121 | Replaced bad vqwk ADCs in counting house crate |
Fall 2018
Run list - Cameron, Ye, Bob | |||||
---|---|---|---|---|---|
Day | Run Number | Purpose | |||
October 23 2018 | 4444-4465 | Cameron tests ET deatime | |||
October 24 2018 | 4473-4501 | Cameron tests ET deatime | |||
October 29 2018 | 4503-4528 | Cameron tests ET deatime | |||
November 1 2018 | 4533-4542 | Cameron and Ye check on cavity ADC signals | |||
November 2 2018 | 4548-4554 | Cameron tests ET deatime | |||
November 5 2018 | 4556-4566 | Cameron tests ET deatime | |||
November 6 2018 | 4568 | Cameron and Bob test injector timing | |||
November 11 2018 | Injector: Paul King adjusts FLEXIO timing | ||||
Injector: Caryn fixes control.db | |||||
November 14 2018 | 4611-4614 | Injector: Cameron checks on SIS3801 timing | |||
4615-4617 | Counting House: Ye and Cameron test CntHouse ADCs again | ||||
November 21 2018 | 4631-4642 | MCC High Current test HALOG | |||
November 27 2018 | 4662-4680 | Cameron tests Injector timing delays (4663 helicity benchmark) | |||
December 2 2018 | 4685-4695 | Cameron tests Injector timing delays (4686 helicity benchmark) | |||
December 3 2018 | 4669-4700 | Cameron tests CntHouse ET deadtime (4700 is a long benchmark run, no beam) | |||
December 5 2018 | 4706-4742 | Cameron tests CntHouse ET deadtime (4742 is a benchmark run, no beam) | |||
December 17 2018 | 4776-4812 | Cameron tests CntHouse ET deadtime, makes conclusions | |||
December 19 2018 | 4813-4817 | Cameron tests Banked CRL in injector timing, and BMW commissioning | |||
December 21 2018 | 4818-4822 | Cameron tests new RHRS scaler in PREX config, reads data, incorrectly |
Spring 2019
There was a change of configs, now we have all Banked configs and reset the run number to 1000
Run list - Cameron, Ye, Bob, Tao | |||||
---|---|---|---|---|---|
Day | Run Number | Purpose | |||
January 15 2019 | 1017-1031 | Cameron and Tao test synchronization monitor | |||
January 18 2019 | 1032-1036 | Cameron tests pedestals with 1.6 V battery in ADC channels | |||
January 22 2019 | 1039-1044 and 1098 | Testing synch monitor with new setup with Paul King | |||
January 22 2019 Swing | 1045-1097 | Injector PQB Studies | |||
January 23 2019 | 1100-1104 | Testing JAPAN ET online connection and BMW FLEXIO functionality | |||
February 1-3 2019 | 1105-1192 | Injector studies | |||
February 04 2019 | 1193 | Testing CODA, JAPAN, PANGUIN, and compiled analysis scripts + SAM channel noise floors | |||
February 05 2019 | 1194-1198 | Establishing standard DAQ procedure and HV GUI | |||
February 06 2019 | 1199-1211 | Testing SAMs and ET | |||
February 07 2019 | TEDf Test Stand | Initiating the TEDf test stand | |||
February 12 2019 | Debugging the HelBoard | ||||
February 13 2019 | Debugging the HelBoard and ADC Testing in TEDf stand | ||||
March 14 2019 | Understanding Beam Sync some, cataloging understanding of helicity control | ||||
March 22 2019 | ET Speed limit tests | ||||
April 04 2019 | Documenting DAQ from APEX setup | ||||
April 29 2019 | 2094-2101 | Updating INJ DAQ to fix STR 7200 and SIS3801 signals |